Version no:

Annexure – 1
Master Job List Transmission Line Date Approved:
QHSE

Routine /Non - Risk


S.No. Jobs Is SOP available Remarks
Routine Level(HR/MR/LR)
Thermography of Low risk
1 transmission line Routine NA NA
Hotline inspection of High risk
2 transmission line Non-routine NA NA
Bird guard/MVLC Medium risk
installation on
3 transmission tower/pole Non-routine NA NA
High risk
4 New pole erection Non-routine NA NA
Medium risk
5 Pole/tower earthing work Non-routine NA NA
Insulator replacement High risk
6 work Non-routine NA NA
General maintenance of Medium risk
7 transmission line Non-routine NA NA
Conductor sag correction High risk
8 work Non-routine NA NA
Breakdown maintenance High risk
9 of transmission line Non-routine NA NA
Conductor replacement of High risk
10 transmission line Non-routine NA NA
Low risk
11 Visual inspection of line Routine NA NA
Medium risk
12 Pole painting work Non-routine NA NA
High risk
13 Tree trimming Non-routine NA NA
High risk
14 Line guarding installation Non-routine NA NA
Civil works of Medium risk
15 Transmission line Non-routine NA NA
OFC cable PM and BM Medium risk
16 maintenance Non-routine NA NA
PM of group metering Medium risk
17 and internal isolators Non-routine NA NA

Prepared By
Plant/ Area In-charge

The official copy of this file is available on the Renew Portal.


Before using a printed, uncontrolled copy, verify that it is the current version.
Document Number Created By Reviewed By Approved By
Colin Varghese Anurag Jain

Page 1 of 2
Version no:
Annexure – 1
Master Job List Transmission Line Date Approved:
QHSE

The official copy of this file is available on the Renew Portal.


Before using a printed, uncontrolled copy, verify that it is the current version.
Document Number Created By Reviewed By Approved By
Colin Varghese Anurag Jain

Page 2 of 2