You are on page 1of 2

Names of people performing JSA : Contractor team

Title of the Job: Painting of Pole and Fencing

Date : 19.05.2019 Department : Asset management

Sequence of Basic Job


Steps Potential Hazards Recommended Control Measure What Could go Wrong Corrective Action

 Isolation of the Induction.  Use of HV detector, earth  Somebody may operate the breaker Make PPEs mandatory.
Transmission line. arc flash discharge rod with shorted. if LOTO not put.  TBT must be performed before
 Arc suit (with face shield) and  Residual current may cause high starting the job.
PPEs (HV hand gloves, safety electric shock to workers.  Adequate Training on Jo specifi
shoes and safety helmet).  Electric flash may occur while  To be ensure ground earthing
operating breaker/isolator before and after the working
 Induction due to line crossing of poles
live lines

 Access Tower Fall due to uneven  Working person need to be  Worker may get unconscious  PPEs must be made mandatory.
locations surface. cautious. due to heavy fatigue.  TBT must be conducted before
Fatigue.  Time to time water-intake.  Worker may get Ergonomics performing the job.
Snake bite  Use of PPEs. related issues First aid box to be carry
Heat stroke  Ensure anti venom/Pole
venom availability

 DP structure  Fall and slip hazard. .  Worker may get fall down  PPEs must be made mandatory.
climbing  Fatigue.  Use of PPEs during climbing.  Trained employee to
 falling of tools  Time to time water-intake.  Worker may get Ergonomics relatedperform the job.
while climbing  Adequate tools to be carry issues  work shall not be carried
with proper bag  Adverse weather condition out during thunderstorms, cloudy
atmosphere and
 wind speed >15m/s

 Pole/fencing Fall from height due to  Use of PPEs  Life line may get faulty  Before usage of life line need to
painting work leg or hand slip  Usage of tools ln yard  Backache due to long time work visual checking
falling of tools during  Checking of line by Voltage on pole  FTU Certificate need to obtain
execution of work detector to insure line free  Plan to Execute work during
Electrocution because from voltage morning and evening
of line crossing  MSDS to be review and ensure
Paint spillage on eyes the awareness to all workers
and body

 Remove LOTO &  arc flash  Arc suit (with face shield) & other  Electric flash may occur while  Use of PPEs and safety instrument
restore the supply PPEs(Safety shoes & safety helmet & operating breaker/isolator should be made mandatory.
for the equipment HV gloves).  arc suit(while operating isolator and
breaker) should me made
mandatory

Required/ recommended PPE: Safety helmet, safety shoes, Wear boots, long sleeve shirts, and eye protection, hand gloves

Analyzed By: Shubhanki Garg, Arun Kumar Reviewed by: Padmanava Swain