The document provides a bill of quantities for electrical work including supply and installation of equipment like a DB panel, cables, sockets, and relocation of an AC thermostat for a shop at a total cost of 22,001 Qatari Riyals. It lists 9 items with descriptions, quantities, rates, and amounts for preparation of drawings, a DB panel, armored cables, cable sleeves, excavation, weatherproof sockets, power sockets, relocation of an AC thermostat, and mobilization costs.
The document provides a bill of quantities for electrical work including supply and installation of equipment like a DB panel, cables, sockets, and relocation of an AC thermostat for a shop at a total cost of 22,001 Qatari Riyals. It lists 9 items with descriptions, quantities, rates, and amounts for preparation of drawings, a DB panel, armored cables, cable sleeves, excavation, weatherproof sockets, power sockets, relocation of an AC thermostat, and mobilization costs.
The document provides a bill of quantities for electrical work including supply and installation of equipment like a DB panel, cables, sockets, and relocation of an AC thermostat for a shop at a total cost of 22,001 Qatari Riyals. It lists 9 items with descriptions, quantities, rates, and amounts for preparation of drawings, a DB panel, armored cables, cable sleeves, excavation, weatherproof sockets, power sockets, relocation of an AC thermostat, and mobilization costs.
Preparation of Shop drawings for Equipments and 1 Electrical details Item 1 2,000.00 2,000.00 Supply & Installation of 8 ways DB panel (with additional breakers for Ahlibank ATM) including breakers, incomer 2 and all required accessories. Nos 1 4,860.00 4,860.00 Supply & Installation of 4Cx16 Sqmm + 1Cx16 Sqmm Armoured cable including cable glands and end 3 termination. Mtr 39 79.00 3,081.00 Supply & Installation of Cable Sleeve for running the 4 main cable underground Mtr 10 45.00 450.00 Floor excavation and refilling on the outside area to run 5 the main cable Item 1 5,500.00 5,500.00
Supply & Installation of Weather proof power sockets for
6 all Equipments including containment & wiring Nos 6 480.00 2,880.00 Supply & Installation of power sockets for Wall signages 7 including wiring and containment Nos 2 440.00 880.00 Relocation of AC thermostat including additional wiring 8 and containment Item 1 550.00 550.00 Mobilization, Demobilization, Logistics and management 9 cost Item 1 1,800.00 1,800.00 Total Amount in Qrs 22,001.00