HW allowable = 3.68 m RL Tailwater = Design Storm Return Period = 50 -Year ARI Design Discharge, Qd = 2.75 m3/s HWallowable = 1.92 m Tailwater, TW = 2.46 m RL IL = 1.76 m Allowable Headwater, HW = 3.68 m RL Mean Stream Velocity, Vmean = m/s Max Stream Velocity, Vmax = m/s Check Discharge, Qc = m3/s So = 0.0033 L= 15.00 Headwater Computation Controlling Culvert Description Q Q/n Size Size Area Inlet Control Outlet Control HWo = H + ho - LSo HW n (Entrance Type) (m3/s) (m3/s) (m) B (m) D (m2) A HW Hwi/D i Ke H hc (hc+D)/2 TW ho LSo HWo (m) Twin Box Culvert 2.75 1.00 2.75 1.50 1.77 0.84 1.26 0.50 0.20 0.78 1.14 0.75 1.14 0.05 1.29 1.29 (Headwall with square edge)
Summary and Recommendations :
Designed by : Date : TW = 0.75 m Tailwater = 2.46 m RL