You are on page 1of 5

PROJECT : Second Trunk Road A5

JOB NO : 21801

CULVERT NO. : C19

HYDROLOGICAL AND CHANNEL INFORMATION SKETCH


HW allowable = 3.68 m RL
Tailwater =
Design Storm Return Period = 50 -Year ARI
Design Discharge, Qd = 2.75 m3/s HWallowable = 1.92 m
Tailwater, TW = 2.46 m RL IL = 1.76 m
Allowable Headwater, HW = 3.68 m RL
Mean Stream Velocity, Vmean = m/s
Max Stream Velocity, Vmax = m/s
Check Discharge, Qc = m3/s So = 0.0033
L= 15.00
Headwater Computation Controlling
Culvert Description Q Q/n Size Size Area Inlet Control Outlet Control HWo = H + ho - LSo HW
n
(Entrance Type) (m3/s) (m3/s) (m) B (m) D (m2) A
HW
Hwi/D
i
Ke H hc (hc+D)/2 TW ho LSo HWo (m)
Twin Box Culvert 2.75 1.00 2.75 1.50 1.77 0.84 1.26 0.50 0.20 0.78 1.14 0.75 1.14 0.05 1.29 1.29
(Headwall with
square edge)

Summary and Recommendations :

Designed by :
Date :
TW = 0.75 m
Tailwater = 2.46 m RL

TW

IL = 1.71 m

m
Outlet
Velocity Cost Comments
(m/s)
1.12 OK!

You might also like