Alvand Polypropylene Project

Doc. Title: Meterial Take Off of Main Equipment Page: 1 of 2


Project NO.: 1986 Doc. No.: 1986-2430-EL-MTO01-0001 Phase: BED Rev.: A

Utility Substation
Meterial Take Off
of
Main Equipment

A 11th.Jun.2020 Issued For Approval T.GAO X.F.LIANG H.GENG


Rev. DATE DESCRIPTION DES. CHKD. APPR.
Alvand Polypropylene Project
Doc. Title: Meterial Take Off of Main Equipment Page: 2 of 2
Project NO.: 1986 Doc. No.: 1986-2430-EL-MTO01-0001 Phase: BED Rev.: A
QTY
No. Item Specification Unit Remarks Rev
ACTUAL MARGIN TOTAL

10/0.42±2x2.5%kV,315kVA,ΔU=4% D,yn11,
1 Transformer Oil-immersed, outdoor, IP55 set 2 0 2
Ref. to 1986-1092-EL-SPE01-0001

2 LV switchgears Ref. to 1986-1092-EL-SPE03-0001

Incoming set 2 0 2

Bus-tie set 1 0 1

Distribution/MCC set 3 0 3

Soft starter, 75kW set 1 0 1

Reactive power compensation,40kvar, two steps set 2 0 2

10kW, 30mins
3 EPS set 1 0 1
Ref. to 1986-1092-EL-SPE04-0001
NOTES:
1.This MTO only shows the main equipment in this unit. Other equipment and materials will be counted in the MTO of unit0040.