NEED TO FIGURE OUT

HOW MUCH "NEW


CONCRETE" WE SHOULD
HAVE - MAY REQUIRE
CUTTING EXISTING BARS
LOWER THAN 1'-0" FROM
THE PROPOSED FINISHED
ELEVATION

NEW REBAR CAGE WITH


BARS DOWELLED INTO
EXSITING SHAFT FOR
LOAD TRANSFER