8000*680m
Double Length
m
4 Layer Belt 1set 350000
Motor 3.75KW
conveyor
Weight 0.375T
Pallet
1 Capacity 2.5T 2sets 50000
Trolley
Air
2 Capacity 3/ 5 HP 1sets 50000
Compressor
Subtotal 100000
Color
material
1 Model BR-8 1set 750000
feeding
instrument
2 Color mixer
Model JD350 1set 350000
Belt
3 Length 6000mm 1set 300000
Conveyor
Subtotal 1400000
Extra Mould
1 Block 1 250000
mould
2 Paver 1 350000
mould
Cement /
Flyash silo
1 Capacity 100T 1set Buy locally
Plus
accessories
Screw
2 Specification 6000*219mm 1set Buy locally
conveyor
200x100x60mm
15 2700 21600
225x112.5x60/80/100
15 1980 15840
mm
2.3Motor List
No. Item Power(KW)
1 Batching Machine 12
2 Mixer 27.5
3 8M Belt conveyor 3.75
4 Face Device 9.25
Hydraulic station motor
Brick conveyor motor
5 6004 Host machine 29.7
Down mould vibration motor
Material scattering motor
Stacker Vertical running motor
6 4.4
Horizontal moving motor
Total power consumption 86.6 KW
Remark:the motor voltage is customized as per buyer’s local conditions
Main wire specification(Transformer output copper wire)
220V THREE PHASES(3*95+1*50)
415V THREE PHASES 3*70+1*35
The Power shown above are only indicative, actual will be calculated as per the setup.
1. Foundation drawing will be given to construct foundation as per the dimension indicated
2. Infrastructure construction needs professional guidance of Civil Engineers
3. Make sure that each foundation board, and every board at the same level
504, Flora Apartment, 8-2-348/1, Road No 3, Banjara Hills, Hyderabad 500034
Mobile: +919704046060/ +919390006400 Email; info@brickwell.in, website: www.brickwell.in
4. The depth of the host machine foundation can be adjusted according to the Soil quality
5.The stacker needs second pour concrete after quasi-localization.
6.Each leg of 45T Cement silo to bear a net load of 15 tons; or please subject to the products like 100T, its
data different from the 45T silo.
7. After finish the installation of mixer then lay the blocks for loading hopper of mixer. And fixing the
Drainage
8. After tamp the foundation then Pouring the concrete with reinforced net, just according to your local silo
quality.
NOTE
1. Because of technology prove, technical parameters and spare parts’ original maybe changed. But it will
not less than existing configure function now.
2. User should prepare following establishments:
(1) High voltage power for PLC control unit.
(2) Lightning-protection system for station and earthing.
2.6.Employees needed
1. Mixing part:1 labor
2. Pallet feeder:2labor(this can be replaced by pallet feeding machine)
3. Host machine control:1 labor
4. Forklift driver:1 labor
5. Daily technical maintenance:1 labor
6. Block stacking:2-3 labors
2.7.Block Drying
The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be taken
after several hours
In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
The blocks can be finished product after 9 hours if there is curing room
3.2. Computer control system: the control system adopts the Mitsubishi PLC and Mitsubishi touch screen
A. has stable control system, easy to operate, lower rate of breakdown.
B. in the man-machine dialogue interface, according to the technological process, preparation,
modification process parameters so as to achieve the best working condition.
C. display the operation state, alarm promote in time if found fault, convenient for the machine
maintenance and troubleshooting.
D. adopts the safety logistic control system with the function of self-locked, avoid the machinery accident if
operation error.
E. equipped with the input and output data and the function of formula data, the data permanent
preservation, it could be also through the realization of remote fault diagnosis and application upgrade by
telephone calls.
3.3 Hydraulic system: the hydraulic system, hydraulic pump and hydraulic valve adopt the Taiwan
Taida hydraulic unit.
A. adopts the Mitsubishi motor to drive the oil pump, stable operation.
B. uses the constant power pump, mechanical operation action quickly.
C. integrated high pressure hose connecting, convenient for installation.
D. adopts the electro-hydraulic proportional overflow speed regulating valve, the oil can be automatically
regulate the oil flow according to the needs during producing, and adjust working pressure and flow rate
accurately, save energy, guarantee period, reduce the impact, protect the cylinder for the buffer action in
the process of production and the endpoint, so as to improve the stability and lengthen the service life of
the oil cylinder.
A. feeding structure, baseboard and blade adopts the high strength HARDOX steel.
B. Stirring shaft rotation reciprocating fast feeding material, more uniform distribution, to ensure the fully
dense of the bearing block, fly ash block, lightweight aggregate block, and shorten the time of feeding
material.
C. discharging door controlled by the SEW motor, which is great strength, and could solve the problem of
oil leak, the opening size of discharging door adjustable and controlled as well based on the actual needs.
D. feeding material system has the compliance of sealing device in case of material leaking.
E. apply for various of materials and mould.
3.5. The host machine structure adopts the special steel, vibration resistance, stable structure,
no deformation.
3.6. the mould materials, HRC 61 heat treatment, wear-resisting, longer service life than the common
mould