You are on page 1of 3

January 2021 2021 ATRIP-II Awarded Projects Page 1 of 3

County City Project Description Local Amt ATRIP 2 Amt Total Cost
BALDWIN Gulf Shores WIDEN SR-59 SOUTH FROM 2 LANES TO 3 LANES FROM CR-8 (COASTAL GATEWAY BLVD.) TO CR-4 (COTTON CREEK DR.) $273,258.54 $2,000,000.00 $2,273,258.54

BALDWIN Foley INTERSECTION IMPROVEMENTS AT SR-59 AND CR-12 INCLUDING ADDING RIGHT TURN LANES ON SR-59 NORTH AND SR-59 SOUTH AND ADDING LEFT TURN LANES ON CR-12. $250,140.00 $1,000,560.00 $1,250,700.00

Totals for Baldwin County 2 Projects Local Total $523,398.54 ATRIP 2 Total $3,000,560.00 Total Cost $3,523,958.54

BIBB REALIGN CR-1 WITH SR-5 AND ADD RIGHT TURN LANES ON SR-5 $35,000.00 $536,708.00 $571,708.00

Totals for Bibb County 1 Projects Local Total $35,000.00 ATRIP 2 Total $536,708.00 Total Cost $571,708.00

BLOUNT ADD LEFT TURN LANE ON SR-75 NORTH AT THE INTERSECTION OF CR-26 $0.00 $485,166.00 $485,166.00

Totals for Blount County 1 Projects Local Total $0.00 ATRIP 2 Total $485,166.00 Total Cost $485,166.00

CHAMBERS UPGRADE EXISTING LIGHTING AT THE I-85 AND US-29 INTERCHANGE (EXIT 79), ADD NEW LIGHTING ALONG I-85 FROM EXIT 79 TO THE ALABAMA WELCOME CENTER, UPGRADE SIGNAL $1,313,606.47 $1,282,000.00 $2,595,606.47
AT EXIT 79 (JOINT PROJECT - CHAMBERS COUNTY, LANNETT, VALLEY)

Totals for Chambers County 1 Projects Local Total $1,313,606.47 ATRIP 2 Total $1,282,000.00 Total Cost $2,595,606.47

CLARKE ADD A CENTER LEFT TURN LANE ON US-43 AT NEW CLARKE WASHINGTON ELECTRIC COOPERATIVE OFFICE $0.00 $1,168,416.15 $1,168,416.15

Totals for Clarke County 1 Projects Local Total $0.00 ATRIP 2 Total $1,168,416.15 Total Cost $1,168,416.15

COFFEE Enterprise CONSTRUCT ROUNDABOUT AT SR-27 AND SHELLFIELD ROAD $1,023,561.09 $2,000,000.00 $3,023,561.09

Totals for Coffee County 1 Projects Local Total $1,023,561.09 ATRIP 2 Total $2,000,000.00 Total Cost $3,023,561.09

DALLAS REALIGN AND WIDEN AL-41, ADD TURN LANE ON US-80W, AND ADD AN ACCELERATION LANE ON US-80E, AT THE INTERSECTION OF AL-41 AND US-80 $0.00 $182,285.17 $182,285.17

Totals for Dallas County 1 Projects Local Total $0.00 ATRIP 2 Total $182,285.17 Total Cost $182,285.17

ESCAMBIA Atmore INTERSECTION IMPROVEMENTS ON SR-21 AT PORCH RD EAST INCLUDING ADDING A RIGHT TURN LANE ON SR-21 NORTH, ADDING A LEFT TURN LANE ON SR-21 SOUTH, AND MODIFYING $58,000.00 $388,669.00 $446,669.00
THE EXISTING TRAFFIC SIGNAL.

Totals for Escambia County 1 Projects Local Total $58,000.00 ATRIP 2 Total $388,669.00 Total Cost $446,669.00

JACKSON Scottsboro ADD OFFSET LEFT TURN LANES ON SR-2 AT THE INTERSECTION OF COUNTY PARK RD, AS WELL AS ACCESS MANAGEMENT MODIFICATIONS AND EXTENDING TWO EXISTING ACCESS $1,115,036.14 $1,484,722.54 $2,599,758.68
ROADS

Totals for Jackson County 1 Projects Local Total $1,115,036.14 ATRIP 2 Total $1,484,722.54 Total Cost $2,599,758.68

JEFFERSON Birmingham UPGRADE THE MEDIAN ON ELTON B STEPHENS EXPRESSWAY (US-280 /US-31) FROM US-280 TO 1ST AVE NORTH (US-11 / SR-7) INCLUDING UPGRADES TO THE GUARDRAIL, THE REMOVAL $2,000,000.00 $2,000,000.00 $4,000,000.00
OF THE CURB / GUTTER AND SLOPE PAVING

JEFFERSON Bessemer WIDENING AND INTERSECTION IMPROVEMENTS ON SR-150 FROM CR-52 (MORGAN RD) TO LAKESHORE PARKWAY. $772,100.00 $2,000,000.00 $2,772,100.00

Totals for Jefferson County 2 Projects Local Total $2,772,100.00 ATRIP 2 Total $4,000,000.00 Total Cost $6,772,100.00

LAMAR Vernon RESURFACE SR-17 FROM MP 242.44 TO 243.84 (1.65 MILES) WITHIN THE CITY LIMITS OF VERNON $0.00 $514,893.50 $514,893.50

Totals for Lamar County 1 Projects Local Total $0.00 ATRIP 2 Total $514,893.50 Total Cost $514,893.50

LEE Opelika IMPROVE ACCESS MANAGEMENT ALONG COLUMBUS PARKWAY (US-280/US-431) AT I-85 (EXIT 62) FROM FOX RUN PARKWAY TO NORTH UNIROYAL RD, TO INCLUDE SIGNAL UPGRADES, $154,799.78 $1,328,687.23 $1,483,487.01
ACCESS MANAGEMENT MODIFICATIONS, AND ADDING A LEFT TURN LANE ON COLUMBUS PARKWAY (US-280/US431)

Totals for Lee County 1 Projects Local Total $154,799.78 ATRIP 2 Total $1,328,687.23 Total Cost $1,483,487.01
January 2021 2021 ATRIP-II Awarded Projects Page 2 of 3

County City Project Description Local Amt ATRIP 2 Amt Total Cost
MACON Tuskegee ADD RIGHT TURN LANE ON SR-15 AT ENTRANCE OF GEORGE WASHINGTON CARVER SCHOOL $0.00 $275,000.00 $275,000.00

Totals for Macon County 1 Projects Local Total $0.00 ATRIP 2 Total $275,000.00 Total Cost $275,000.00

MADISON ADD NORTH AND SOUTH BOUND LEFT TURN LANES AND TRAFFIC SIGNALS ON SR-53 AT THE INTERSECTIONS OF HARVEST RD, MCKEE RD, AND OLD RAILROAD BED ROAD. $2,625,414.00 $2,000,000.00 $4,625,414.00

Totals for Madison County 1 Projects Local Total $2,625,414.00 ATRIP 2 Total $2,000,000.00 Total Cost $4,625,414.00

MARENGO SAFETY IMPROVEMENTS ON US-80 BY INSTALLING LED ROADWAY LIGHTING AT THE 3 DEMOPOLIS PAPER MILL ENTRANCES $75,000.00 $775,000.00 $850,000.00

Totals for Marengo County 1 Projects Local Total $75,000.00 ATRIP 2 Total $775,000.00 Total Cost $850,000.00

MARION Hackleburg INTERSECTION AND DRAINAGE IMPROVEMENTS TO SR-253 AT OLD HACKLEBURG ROAD INCLUDING UPGRADES TO THE EXISTING DRAINAGE DITCH, INCREASING THE TURNING RADIUS, $0.00 $529,284.17 $529,284.17
AND PAVING SHOULDERS.

Totals for Marion County 1 Projects Local Total $0.00 ATRIP 2 Total $529,284.17 Total Cost $529,284.17

MARSHALL Boaz REDUCE SR-168 FROM 4 LANES TO 3 LANES FROM US-431 TO DARNELL STREET, INCLUDING ACCESS MANAGEMENT UPGRADES, AND A TRAFFIC SIGNAL AT THE PROPOSED OUTLET $3,459,631.03 $2,000,000.00 $5,459,631.03
CONNECTOR ROAD

MARSHALL Arab UPGRADE 7 EXISTING TRAFFIC SIGNALS ON US-231 WITHIN THE CITY LIMITS IN ORDER TO CORRECT DEFICIENCIES AND BRING UP TO CURRENT DESIGN STANDARDS, INCLUDING $146,300.00 $1,529,400.00 $1,675,700.00
INCREASE SIGNAL HEIGHTS, UPGRADE POLES AND SIGNAL HEADS, AND ADD EMERGENCY VEHICLE PREEMPTION

Totals for Marshall County 2 Projects Local Total $3,605,931.03 ATRIP 2 Total $3,529,400.00 Total Cost $7,135,331.03

MONTGOMERY INTERSECTION IMPROVEMENTS ON US-80 AT MITCHELL YOUNG ROAD INCLUDING LANE MODIFICATIONS AND THE ADDITION OF A TRAFFIC SIGNAL AND PTZ CAMERA. $69,091.95 $276,367.80 $345,459.75

Totals for Montgomery County 1 Projects Local Total $69,091.95 ATRIP 2 Total $276,367.80 Total Cost $345,459.75

MORGAN Hartselle ACCESS MANAGEMENT IMPROVEMENTS ON US-31 FROM CURRY ST TO SPARKMAN ST. INCLUDING MODIFICATIONS TO THE EXISTING MEDIAN TO ADD LEFT TURN LANES AND $331,696.08 $1,519,381.00 $1,851,077.08
DECELERATION LANES. PHASE 1 OF A 2 PHASE MASTER PLAN.

Totals for Morgan County 1 Projects Local Total $331,696.08 ATRIP 2 Total $1,519,381.00 Total Cost $1,851,077.08

TUSCALOOSA Tuscaloosa INTERSECTION IMPROVEMENTS AT SR-215 AND 2ND AVE, INCLUDING ADDING A RIGHT TURN LANE ON SR-215, EXTENDING THE EXISTING LEFT TURN LANE ON SR-215, SIGNAL $1,752,850.00 $761,300.00 $2,514,150.00
UPGRADES, AND ADDING A 10 FT SHARED USE PATH ALONG SR-215.

TUSCALOOSA Northport WIDENING US-43 FROM 2 TO 4 LANES FROM MITT LARRY RD (MP 203.17) TO PAUL HOWELL RD (MP 204.030), INCLUDING INTERSECTION IMPROVEMENTS AT PAUL HOWELL RD, AND A $10,258.63 $2,000,000.00 $2,010,258.63
LEFT TURN LANE AT NEW SCHOOL ACCESS ROAD (JOINT PROJECT - TUSCALOOSA COUNTY AND NORTHPORT)

Totals for Tuscaloosa County 2 Projects Local Total $1,763,108.63 ATRIP 2 Total $2,761,300.00 Total Cost $4,524,408.63

WALKER INTERSECTION IMPROVEMENTS AT SR-269 AND MARY LEE RD INCLUDING ADDING A RIGHT TURN LANE AND ACCELERATION LANE ON SR-269 AND RE-ALIGNING MARY LEE RD WITH $25,000.00 $503,090.11 $528,090.11
SR-269.

Totals for Walker County 1 Projects Local Total $25,000.00 ATRIP 2 Total $503,090.11 Total Cost $528,090.11

WILCOX INTERSECTION IMPROVEMENTS AT THE INTERSECTION OF SR-10 AND CR-22 TO INCLUDE NEW TRAFFIC SIGNALS, CURB AND GUTTERS, SIDEWALKS, CROSSWALKS, AND DRAINAGE $0.00 $1,116,693.95 $1,116,693.95
IMPROVEMENTS

Totals for Wilcox County 1 Projects Local Total $0.00 ATRIP 2 Total $1,116,693.95 Total Cost $1,116,693.95
January 2021 2021 ATRIP-II Awarded Projects Page 3 of 3

County City Project Description Local Amt ATRIP 2 Amt Total Cost
WINSTON Haleyville ADD LEFT TURN LANE ON SR-195 AT THE INTERSECTION WITH 20TH AVE $239,000.00 $611,043.75 $850,043.75

Totals for Winston County 1 Projects Local Total $239,000.00 ATRIP 2 Total $611,043.75 Total Cost $850,043.75

Totals For Awarded Year : 2021 27 Projects Local Total $15,729,743.71 ATRIP 2 Total $30,268,668.37 Total Cost $45,998,412.08