BILL OF QUANTITY
CHURCH AT PONG RO VILLAGE, SANGKAT PONHEA PON, KHAN PREK PNOV, PHNOM PENH
I SITE PREPARATION
2 UNDERGROUND WORK
2.1.3 Formwork m2 - $ - $ - $ -
2.2 STUMPS
2.2.1 formwork m2 - $ - $ - $ -
2.2.3 Stirrup kg - $ - $ - $ -
2.2.4 Stump concreting m3 - $ - $ - $ -
3 STRUCTURES
3.1.1.5 Tied beam concreting works m3 55.16 $ 67.00 $ 15.00 $ 3,695.89 $ 827.44 $ 4,523.33
3.1.2 COLUMNS
3.1.3.1 Compact granulat 4x6 thk 150mm m3 190.58 $ 20.00 $ 5.00 $ 3,811.50 $ 952.88 $ 4,764.38
3.1.3.3 Formwork m2 - $ - $ - $ - $ - $ -
3.2.1.4 Tied beam concreting works m3 45.61 $ 67.00 $ 15.00 $ 3,055.54 $ 684.08 $ 3,739.61
3.2.2 COLUMNS
3.2.3.3 Slab Concreting works m3 106.13 $ 67.00 $ 15.00 $ 7,110.58 $ 1,591.92 $ 8,702.50
3.3.1.4 Beam concreting works m3 24.60 $ 67.00 $ 15.00 $ 1,648.20 $ 369.00 $ 2,017.20
3.3.2.3 Slab Concreting works m3 4.62 $ 67.00 $ 15.00 $ 309.54 $ 69.30 $ 378.84
4 FINISHING WORKS
4.1.1.1 Single brick work thk 100mm m2 617.35 $ 3.80 $ 2.00 $ 2,345.91 $ 1,234.69 $ 3,580.60
4.1.1.2 Double brick works thk 200mm m2 1,073.88 $ 7.60 $ 4.00 $ 8,161.45 $ 4,295.50 $ 12,456.95
4.1.2.2 Wall tiles 2000mm high m2 559.00 $ 8.50 $ 3.00 $ 4,751.50 $ 1,677.00 $ 6,428.50
4.1.2.3 Wall Skirting 120mm high m 495.00 $ 2.00 $ 1.00 $ 990.00 $ 495.00 $ 1,485.00
4.1.2.4 Granite Tile for staircase m2 52.50 $ 12.00 $ 6.00 $ 630.00 $ 315.00 $ 945.00
4.1.3 Ceiling works
4.1.3.1 Concealled ceiling c/w decorative stripe m2 186.00 $ 7.00 $ 2.50 $ 1,302.00 $ 465.00 $ 1,767.00
4.1.4.1 Wall painting works m2 4452.43 $ 2.00 $ 1.50 $ 8,904.86 $ 6,678.65 $ 15,583.51
4.2.1.1 Single brick work thk 100mm m2 464.60 $ 3.80 $ 2.00 $ 1,765.48 $ 929.20 $ 2,694.68
4.2.1.2 Double brick works thk 200mm m2 979.15 $ 7.60 $ 4.00 $ 7,441.54 $ 3,916.60 $ 11,358.14
4.2.2.2 Wall tiles 2000mm high m2 112.00 $ 8.50 $ 3.00 $ 952.00 $ 336.00 $ 1,288.00
4.2.2.3 Wall Skirting 120mm high m 515.00 $ 2.00 $ 1.00 $ 1,030.00 $ 515.00 $ 1,545.00
4.2.3.1 Concealled ceiling c/w decorative stripe m2 1270.50 $ 7.00 $ 2.50 $ 8,893.50 $ 3,176.25 $ 12,069.75
4.2.4.1 Wall and floor painting m2 3339.00 $ 2.00 $ 1.50 $ 6,678.00 $ 5,008.50 $ 11,686.50
5.1.1 Stair case railing m 14.00 $ 25.00 $ 5.00 $ 350.00 $ 70.00 $ 420.00
5.1.2 Glass window with aluminum frame (Glass 5mm thk) m2 50.40 $ 28.00 $ 3.00 $ 1,411.20 $ 151.20 $ 1,562.40
5.1.3 Toilet Steel door pcs 35.00 $ 80.00 $ 15.00 $ 2,800.00 $ 525.00 $ 3,325.00
5.1.4 Room Steel door pcs 14.00 $ 115.00 $ 5.00 $ 1,610.00 $ 70.00 $ 1,680.00
5.1.5 Roller Shutter (Main entrance) m2 72.00 $ 36.00 $ 1.00 $ 2,592.00 $ 72.00 $ 2,664.00
5.1.6 Sliding door pcs 2.00 $ 500.00 $ 200.00 $ 1,000.00 $ 400.00 $ 1,400.00
5.2.2 Glass window with aluminum frame (Glass 5mm thk) m2 55.20 $ 28.00 $ 3.00 $ 1,545.60 $ 165.60 $ 1,711.20
5.2.3 Toilet Steel door pcs 17.00 $ 80.00 $ 15.00 $ 1,360.00 $ 255.00 $ 1,615.00
5.2.4 Room Steel door pcs 20.00 $ 115.00 $ 5.00 $ 2,300.00 $ 100.00 $ 2,400.00
6 ROOFING WORK
6.1 Steel structure for roofing work m2 1823.32 $ 13.00 $ 3.50 $ 23,703.16 $ 6,381.62 $ 30,084.78
6.2 Insulation sheet (Aluminum foil double sides) m2 0.00 $ 3.00 $ 1.00 $ - $ - $ -
6.3 Roofing tiles installation m2 1823.32 $ 8.00 $ 2.50 $ 14,586.56 $ 4,558.30 $ 19,144.86
6.6 Window awning (roof tile) pcs 32.00 $ 27.00 $ 5.00 $ 864.00 $ 160.00 $ 1,024.00
7 PLUMBING WORKS
7.1.1 PVC φ21 thk13.5mm m 242.20 $ 0.85 $ 1.20 $ 205.87 $ 290.64 $ 496.51
7.1.2 PVC φ27 thk13.5mm m 120.40 $ 1.00 $ 1.20 $ 120.40 $ 144.48 $ 264.88
7.1.4 Tee 27-21 pcs 19.00 $ 0.35 $ 1.50 $ 6.65 $ 28.50 $ 35.15
7.1.5 Tee 21 pcs 151.00 $ 0.35 $ 1.20 $ 52.85 $ 181.20 $ 234.05
7.2.1 PVC φ125 thk13.5mm m 144.00 $ 10.50 $ 1.60 $ 1,512.00 $ 230.40 $ 1,742.40
7.2.2 PVC φ100 thk13.5mm m 144.00 $ 8.50 $ 1.60 $ 1,224.00 $ 230.40 $ 1,454.40
7.2.3 PVC φ80 thk13.5mm m 48.00 $ 4.20 $ 1.50 $ 201.60 $ 72.00 $ 273.60
7.2.4 PVC φ60 thk13.5mm m 72.00 $ 3.50 $ 1.50 $ 252.00 $ 108.00 $ 360.00
7.2.5 PVC φ34 thk13.5mm m 156.00 $ 1.50 $ 1.40 $ 234.00 $ 218.40 $ 452.40
7.2.11 Floor drain pcs 44.00 $ 5.50 $ 1.00 $ 242.00 $ 44.00 $ 286.00
7.2.12 Septics (waste water collection and filtration system) lot 2.00 $ 500.00 $ 200.00 $ 1,000.00 $ 400.00 $ 1,400.00
7.3.1 PVC φ100 thk13.5mm m 147.00 $ 8.50 $ 1.60 $ 1,249.50 $ 235.20 $ 1,484.70
7.4.1 Toilet Bowl c/w accessory pcs 39.00 $ 110.00 $ 10.00 $ 4,290.00 $ 390.00 $ 4,680.00
7.4.2 Lavatory c/w accessroy pcs 50.00 $ 70.00 $ 10.00 $ 3,500.00 $ 500.00 $ 4,000.00
7.4.3 Urinal c/w accessory pcs 2.00 $ 80.00 $ 10.00 $ 160.00 $ 20.00 $ 180.00
7.4.4 Shower pcs 30.00 $ 18.00 $ 5.00 $ 540.00 $ 150.00 $ 690.00
8 ELECTRICAL WORKS
Installation for socket, lighting set 1.00 15000.00 4000.00 $ 15,000.00 $ 4,000.00 $ 19,000.00
2) DOWNPAYMENT 30% WHEN STARTING THE WORK, AND PROGRESS CLAIM ACCORDING TO THE CONTRACT
3) THIS QUOTATION IS BASED ON THE APPROVED DRAWING. ANY CHANGE MADE AFTER THE APPROVAL OF THIS CONTRACT IS SUJECT TO ADDITIONAL
CLAIM.
DATE: