You are on page 1of 23
SLAB INVESTIGATIVE WORKS PROJECT EMPIRE REMAX ATSUBANG JAVA ProvEct Revision :0 lssued 18" May 2019, |#U_REKA EMIPIRE REMIX AT LOT PT 287,HSD216591,PERSIARAN SUBANG PERMA US/1, SUBANG JAVA, MUKIM DAMANSARA, DAERAH PETALING, SELANGOR DARUL HAN, INVESTIGATIVE WORKS ON EXISITING POST-TENSIONED SLAB PREPARED BY Lana arvana cHecxeD ay Foo Tze EUAN DATE OF SUBMISSION 8 may 2019, EWSION o SLAB INVESTIGATIVE WORKS PROJECT : EMPIRE REMIX AT SUBANG JA¥A Revision :0 Issued :18°"May 2018 ‘TABLE OF CONTENTS 1. Introduction 2. Slab Oveniew 3, Data Collection 21 Basement 2, 3.2 Lower Ground 2 33 Lower Ground 1 34 Lower Ground 35 Ground Floor 36 Levelt 37 Level2 38 Level 3 4. Summary 17-18 19-20 a SLAB INVESTIGATIVE WORKS PROJECT EMPIRE REMIX AT SUBANG JA¥A Revision :0 Issued :18°aay 2019 41) INTRODUCTION ‘The investigative work has been caried out st Empire Remix Carpark Block B from Basement 2 upto Lovel 3 The objective of thie Investigation is to inspect and observe the Post tensioned tendon conclton at the ste thet was carried by the previous main contractor. ‘An investigative work has been carried out on 22° April 2019 to 03th May 2019. 2) SLAB OVERVIEW ‘The slab at Basement 2 fo Level 3 was investigated for identify the conditions ‘of pos-tensioned tendons before repair work SLAB INVESTIGATIVE WORKS Revision :0 Ma, PROJECT : EMPIRE REMIX AT SUBANG JAVA Issued: 28 May 2019 3) DATA COLLECTION patched SLABINVESTIGATIVE WORKS Revision PROJECT: EMPIRE REMIX AT SUBANGJAVA vesued May 2019 Observation: Anchorage recesses not patched SUAB INVESTIGATIVE WORKS Revision :0 =. PROJECT : EMPIRE REMI AT SUBANG JA¥A Issued: 18" May 2019 3.1 Basement 2 Observation : Area A~ Tendon not sessed and wedges are not installed ‘Area B ~ Tendon has not been grouted but wedges are instales ‘Area C - obstacies to investigate and Gridine P21 has Ccanerete tendon burst ‘Area D ~ tendon grouted but tendon and grout pipe not cu YH suas iwvesti¢anvE Wonks tevin 0 PROKCT:EMPMEREMDATSUBANGIAYA | ued 18° May 20:9 (Observation: Tendons has not been stressed and grouted i hae Observation: The concrete bursting at the edge of the stab which located at gridiine P21. Besides, all tendons grouted but tendon and grout pipe not cut CObeenation: _Visble evidence of tendon corrosion, that can seen ‘on exposed tendon where the stressing pocket has not been casted. Also, wedge plate and wedges not instated SLAB INVESTIGATIVE WORKS fevision :0 ie. PROJECT EMPIRE REMIX AT SUBANG JA¥A issued :18""May 2019 ‘Observation: Obstactes to do investigation works SLAB INVESTIGATIVE WORKS Revision :0 ii. PROJECT : EMPIRE REMIX AT SUBANG JA¥A Issued :18°"atay 2039 3.2 Lower Ground 2 1) Lower Ground 2 Observation: Overlapping tendon not gfouted and gyidine "MAN tendons has net been stressed, b) Lower Ground 28 ‘Observation: At gridine J-M tendons has not grouted. ©) Lower Ground 20, a Tr At gtidine F, G, K, and M ~ horizontal tendons has not been stressed 4) Lower Ground 20 ee es eh ‘Observation: Area A & B ~ Tendons has net been grouted ‘Area C ~ Tendons has not been grouted and stressed SLABINVESTIGATIVE WORKS KS, PROJECT : EMPIRE REMIX AT SUBANG JAVA T Revision :0 lesued : 18 May 2019) Observation : Visible evidence of tendon corresion, that can seen on ‘exposed tendon where the stessing pocket has not been ‘routed. Also, tendons not stressed ‘SLAB INVESTIGATIVE WORKS Revision :0 PROJECT EMPIRE REMIX AT SUBANG JAVA lesued 18” May 2019 ‘Observation From the visual inspection, the post-tensioned tendon. may not be stressed, 0 SLAB INVESTIGATIVE WORKS Revision :0 3.3 Lower Ground 1 1) Lower Ground ‘Observation: Tendon has not sessed and groute. ) Lower Ground 18 PROJECT: EMPIRE REMIX AT SUBANG JAVA Issued: 18" May 2039 ‘Observation: Tendons grouted and anchorage recesses have been cast but grout hose not cut Stressing pocket not been grouted at gridine J and MAN «} Lower Ground 1© (Observation: Area marked at above igure shows tendon has not been routed " i ‘ = ae ia) SLAB INVESTIGATIVE WORKS Revision :0 PROJECT: EMPIRE REMIX AT SUBANG JAVA lesued : 28" May 2019 9 pockat has Ug I acweee SLAB INVESTIGATIVE WORKS Revision:0 PROJECT : EMPIRE REMIX AT SUBANG JAVA Issued :18" May 2018 (Observation: Tendon grouted and anchorage recesses have been patched but grout pipe not cut SLAB INVESTIGATIVE WORKS Revision :0 ie. PROJECT EMPIRE REMIX AT SUBANG JA¥A Issued :18" May 2019 3.4 Lower Ground (Observation: Area A~ Tendons has not been stressed. ‘Area B — Tendons nas net been grovies. aed PR wie! Observation: Grout pipe has not been cut and stressing recesses not cast ‘suessig 4 SLAG INVESTIGATIVE WORKS Revision :0 i, PROJECT : EMPIRE REMIX AT SUBANG JAYA Issued :18" May 2019 aBiait, 3.5 Ground Floor 2) Ground Floor Observation: Area A tendon has not been grouted ‘Area B ~ tendon has grouted and stressed but stressing ‘pocket not cast [At gidine 1/21 tendon has not been grouted RE Observation: Stressing recesses has not been patched and tendons rot grouted. Observation: Anchorage recesses have not been patched SLAB INVESTIGATIVE WORKS PROJECT : EMPIRE REMIX AT SUBANG JAVA Revision :0 Issued: 18 May 2019 36 Level 1 Observation ‘Area marked at above igure show that tendons are not routed, ‘observation Terdions not stress and grout 16 ] SLAB INVESTIGATIVE WORKS Revision 0 =. PROJECT EMPIRE REMIX AT SUBANG JAVA Issued 18 May 2019, 37 Level2 Observation: Zone A - obstacles area to access for doing investigation work “Tencion has not been grouted. Observation: Gridiine B to G has obstacles to access for doing Investigation works, ” SLAB INVESTIGATIVE WORKS M.,, PROJECT : EMPIRE REMIX AT SUBANG JAYA Revision 0 lssued 28 May 2019, Observation: Tendon not grouted and stessing pocket has not been cast Observation: Post-tensioned mut tendon has not been cut and cast 18 SLABINVESTIGATIVE WORKS Revsion:0 Mi. PROJECT : EMPIRE REMIX AT SUBANG JAVA Issued : 18" May 2019) 3.8 Level 3 ‘Observation: Zone A- Gridlne B to G has obstacles to access for doing investigation works, Zone B tendon has not grouted Zone C ~ Tendon grouted Obeervation: Gridine B fo G has obstacles to access for doing investigation works. Y Sure nvesTICATWE Wonts PROIEcT- EMPIRE EMIX A SUBANG AYA Revision :0 Issued: 18" May 2019 Wesaes Observation: Tendons not grout and stress but already install wedges and wedge plate ‘Observation: Postensioned mult tendon dane 2» SLAB INVESTIGATIVE WORKS PROJECT : EMPIRE REMIX AT SUBANG JAVA Revision :0 Issued: 18" May 2019 4 summary From fh imesigation we can surat fo Anchorage Level rocoanwenot | Tesona* | uacnegt Basement 2 30 60 30 Lower Gound2 ‘0 10 1 Lower Gund 28 7 7 7 Lower Grund 26 2 7 8 Lower Gund 20 2 a a Lower Ground 8 8 2 Lower ound 18 16 6 6 Lover rund 16 ‘8 7 7 Lower Giound 10 7 7 2 Lower Grund 2 7 a Ground oor 18 “8 6 evel 20 7 7 tevel2 1 8 A tevela 2 0 x “Approximate quantibes based on drawing and site inspection

You might also like