You are on page 1of 2

Institututional

Facilities Assemply Faciliteis Business Facilities

Bar

School
Recreation

Laboratory
Auditorium

Health care
Mail Center

Gymnasium
Visitor Center
BUILDINGS

Mosque/Masjid
Training Buildings
Office/Adminstration

Dinning/cafeteria/Snack
CMU-Tool Joint w/o Paint

CMU–Tool Joint with paint

• • •



• • •



• Cement Plaster- Painted

• •







Concrete Pre-cast panels

• • •
• • •
• •
• •
Pre-Engineered Metal Panels
Appendix C

Metal\Glass Cladding

Glass Curtain wall


Exterior Finishes

**Exterior Insulation and Finhsing System










• • •

(EIFS) (i.e "Dryvit" Cladding Finish)


Architectural Exterior Finishes Requirments

Stucco Finish

Cementatious Cladding (i.e Cem-Stone)

Granite/Marble
Appendix C
Architectural Exterior Finishes Requirments

Control • • • •
Operator Shelter • • • •
PIB • • • •
Sub-Station • • • •
Battery and Store Rooms • • • •
OM&E • • • • •
• • •
Factory Faciliteis

Workshop

Warehouse •
Sales Office • • • • • •
Gatehouse • • • • •
Support Facility • • • • •
ID/Sticker • • • • • •
K9 facilities • • • • • •
Fire Station • • • • •
Aviation Terminal • • • •
Aviation Hangers •
Residential
Guest House • • • •
Housing • • • • •

You might also like