You are on page 1of 1

C30 C31 C32 C33 C34

Compound Wall
Height 6' + fencing

Ground Floor Level


Machine Space with ceiling Reception
855 sq ft 165 sq ft

Main
Entrance
C29 C1 C2 C35 Lvl +1200mm

UP

Machine Display
Open Double
PLINTH Ground Floor Level Height Floor Space
1465 sq ft
Machine Space with ceiling
855 sq ft

C28 C3 C4 C36

Spare
Store Parts

Warehouse
Lvl +1200mm

Service
Utilities Up
Entrance
265 sq ft

Toilet 1 Pantry
C27 C5 C6 C7 C37

Workshop
13.447X27.550

C8 C9 C10

Up
For Basement

W/C
1.20 X 2.5

Septic
W/C Tank
1.20 X 2.5 Below

C11 C12 C13 For Warehouse

Warehouse
Service
PARKING Lvl +1200mm
Up
Entrance

Slope
this
way

C14 C15
C17 Driveway
Lvl +1050mm

C19 C18 C19


VEHICLE ENTRY-RAMP SLOPE 1:10
VEHICLE ENTRY-RAMP SLOPE 1:10

To
C16 C17 C18 C16
W3 Warehouse
TOWARDS PARKING

TOWARDS PARKING

Up

UP
UP

C20 C21 C22 C23 Ground


Floor
C21 C22 C23
DB

C20
Plumbing
duct for
pantry
Showroom
12.987 X 13.987

LIFT
1.80X1.80
LIFT
1.80X1.80
Up

Up

Electric
Panels

Meter
C24 C25 C26 Box C24 C25 C26
Outside

ENTRANCE ENTRANCE Gate


Height 4.5'
Lvl +380mm
Gate
Height 4.5' underground
Lvl -150mm water
tank

Main Road
Lvl +1200mm

Loading/ Unloading Deck


JIB CRANE

COMPOUND WALL
GATE GATE
UP Up

61.00M WIDE OLD BOMBAY PUNA ROAD Lvl ±0.0 mm

Main Line Main Road Main Road


Load 200 HP Lvl -150mm Lvl +150mm

Large Truck parking outside

PARKING FLOOR PLAN. GROUND FLOOR PLAN.

Drawing No: NOTES:

Showroom &
1. This drawing is for presentation intent only
NRM_PR/007/Floor Layouts_1 and should not be considered a good for
construction drawing.
2. Drawing may not be use without prior

Tech Centre
permission of the architect.
3. All dimensions/details to be referred as
Drawn By: Checked By: written only.
KB KB 4. Any discrepancy muct be brought into the
N
in Pune
notice of the architect immediately.
Date :
21-12-2020