PLANT CONSTRUCTION SAFETY PILING FRAME INSPECTION

Inspected by : …………………………………………………………. Operator : ……………………….


Safety & Health Officer

SUB-CONTRACTOR PROJECT

DATE LOCATION
EQUIPMENT SUPPLIER
MAKE SERIAL METER READING
MODEL MOTOR EQUIPMENT NO.
CONDITION
REMARKS
CRAWLER-ASSEMBLY GOOD FAIR POOR
Tracks
Pins
Rollers
Chains Adjustment
Chains Wear
Drive Sprockets
Idlers
Travel shafts
OTHER REQUIREMENTS
CONDITION
REMARKS
GENERAL GOOD FAIR POOR
Head sheaves
Equalising sheaves
Aux winch rope
Main winch rope
Boom hoist rope
Hydraulic boom wear pads
Swing brake
House lock
Boom angle indicator
Leveling gauge
Reg Certificate Current
Labeling of Instrumentation
OTHER REQUIREMENT