PILING RIG PLANT PRE-ACCEPTANCE CHECKLIS

PLANT DETAILS
Plant Owner: Address: Ph:

Plant Make: Plant Model: Plant Serial No: Hours / KM’s:

Roads Reg No: Reg Expiry:

Last Service Date / Hrs: Next service Date / Hrs: State registration No: Expire date:

MINIMUM REQUIREMENTS (If the minimum requirements are not met, a plant sticker will not be issued and the item of plant is not to commence work)

Verif Check Requirement Verify Chec Requirement


y k

Operator and Maintenance Manual available Plant Hazard Assessment Sighted & Current (within 2 yrs):

Logbook / Service Records (checked ok): Plant Hazard Assessment Inspection Date: / /

Audible Alarm and other Warning Devices fitted, operable and Daily Prestart Inspection Checklist is available for use.
suitable for site conditions

Fire Extinguisher Fitted and charged

Page 1 of 3
PILING RIG PLANT PRE-ACCEPTANCE CHECKLIS Verify Check Undercarriage
Tracks complete and
undamaged
Idlers / Rollers
Drivers free from leaks
Verif Track Adjuster Sprockets.
Verify Check Cabin Check Environmental
y Articulation bearings and
Cleanliness Clean, free of organic materials (mud, dirt, Retainers
Door operational weeds or seeds) prior to arrival Verify Check Hydraulics System
Deadman Pedal /Switch operational Engine baffling or noise reduction equipment Rams
Handrails and ladders fitted and secure fitted as per manufacturers specifications Hoses / Connectors
Smoke from internal combustion engines Pins / Mounting
Seat adjustments operational secure
should not be visible for more than ten seconds
Seat belt fitted and in good working order (check for excessive wear,
Verif Mast Mountings
Instruments operational & labelled Check leaks and creep)
y
Levers / Controls Operational Hydraulic isolator
Bolts, pins and retainers
Pedals in good condition Verify Check Engine
Rigging, fittings, sheaves & slings have
ROPs Canopy to meet AS 2294 Manufacture’s ID / Working Load Limit (WLL) Engine Mountings
UHF Radio Fitted (If not fitted, has a hand held radio attached or supply certificates Engine Guarding
been supplied) Wire line, pulleys, guides, steel cable free from Exhaust Guarding
damage and wear Oil Leaks/check levels
Warning devices and other lights (flashing, head, tail,
etc) are appropriate for the environment in which plant Anti 2 block on Kelly bar (main line) Coolant Leaks/check levels
is being used. (check environment noise criteria Anti 2 block on service line (Auxiliary line) Coolant System
particularly if working out of hours) Sliding pad wear condition
Warning Signs - Danger Beware Overhead Wires & Vee Belt Condition
Damage, cracks in mounting plates Air Cleaner System
Underground Services
Crowed and boom sheaves and mountings Battery Condition / Mounting
Warning Signs - Seat Belt Must Be Worn
Boom angle indicator Drill Head
Warning Signs - Noise Warning Signage Verify Check
Slew and Winch Verif Guarding installed
Verify Check Check Other
y
Slew ring bolts fitted/ tight Hydraulics
Drill mode not allowing the operator to leave
Oil leaks hydraulic and gear box the seat with drill head turning Anchor points fitted for fall
Test winch break on drum restraint systems
Transport mode allowing the operator to leave
the seat and motor runs Slides and feed rails not
Inspect both drums for cracks
damaged and all bolts, pins/
Check winches for leaks and damage and mounting Jib section pins and retainers
retainers fitted
bolts
Limit switch on rope travel Instructions: Verify Box to be ticked by Owner / Supplier / Operator prior to arrival onsite. Check Box to be ticked after
Does the pawl break function visual inspection by the project
Verify Check Running Controls
Brake operational
Drivers free from leaks

Page 2 of 3
PILING RIG PLANT PRE-ACCEPTANCE CHECKLIS

PLANT OWNER / OCCUPIER PLANT VERIFIER


I certify that the described plant has met the inspection criteria stipulated within this checklist and is I certify that I have verified that the described plant has met the inspection criteria stipulated within this
being serviced and maintained in accordance with the manufacturer’s specifications checklist and is being serviced and maintained in accordance with the manufacturer’s specifications
Name: Signature: Date: Name: Signature: Date:

Page 3 of 3