You are on page 1of 1

Cement plug 1 - 150m to 50m

Casing ID 8.681 in Mud weight 10.5 ppg


Capacity 0.2402 bbls/m Slurry weight 15.8 ppg
Length of plug 100.0 m Spacer weight 11.0 ppg

Tubing OD 3.5 in Cement yield 1.147 cu.ft/sx


Tubing ID 2.992 in Mix water 4.96 gal/sx
Capacity 0.0285 bbls/m
Displacement 0.0105 bbls/m

Drillpipe capacity bbls/m

Bottom of plug 150.0 m Cement volume 24.0 bbls


Plug length with tubing 104.6 m Cement required 118 sx
Mix water required 13.9 bbls
Volume of spacer 10 bbls
Length of spacer in annulus 49.7 m
Annulus pressure 363 psi
Length of slurry in annulus 100.0 m Tubing pressure 392 psi
Length of slurry in tubing 136.8 m Pressure differential 29 psi

Total length of tubing 150.0 m


Cement line volume 1.0 bbls
Displaced length of tubing 13.2 m Tubing displacement 0.4 bbls
Displaced length of drillpipe 0.0 m Drillpipe displacement 0.0 bbls
Total displacement 1.4 bbls

You might also like