correct order?
Review the SPARC T7 documentation, review the server specifications and site
requirements, and tae safety and !S" precautions# $%&
'(# What piece of equipment is required when installin) a SPARC T7*+ and SPARC
T7* server into a rac?
-ift $%&
5+# What is the primary )oal of the 2nstallation and Confi)uration of 3racle
6ardware and Software step in the !2S methodolo)y?
System acclimatiation, installation, and 1asic confi)uration $%&
5'# Why do the !2S Standards recommend that e8ternal ca1les 1etween 3racle
hardware, such as servers, stora)e devices, networ devices and ports 1e clearly
la1eled?
9or ease of maintenance it should 1e unam1i)uously clear from the la1el on each
ca1le, where the ca1le has to 1e attached $%&
55# What are three items in the !2S Site*Audit Report are documented for all
3racle hardware?
3peratin) !nvironment and Coolin) requirements $%&
9acility Power requirements $%&
Access Route requirements $%&
57# What should you do if you 1elieve you have found an error in an !2S
checlist?
9ollow the feed1ac method on the last pa)e of every checlist; email S.PP3RT*
PART:!R*=.!ST23:S>WW>RP@oracle#com $%&
5(# Assumin) a SPARC T5 Server installation on which you install Solaris FF, what
!2S documentation, at a minimum, is it recommended that you 1rin) to support you in
the installation proect? 0ar for Review
!2S 2nstallation Checlist for SPARC T5 $%&
!2S 2nstallation Checlist for Solaris FF 3S $%&
DE# Which two !2S documents are most useful durin) the 2nstallation and
Confi)uration of 3racle 6ardware and Software step?
2nstallation Confi)uration Plan $%&
!2S Checlist $%&
What are two activities that tae place durin) the System Test step of the !2S
methodolo)y?
3n Solaris*1ased systems, 3racleGs !8plorer "ata Collector will 1e run and the
results evaluated with 3RAS4C-2 from the !2S*"/" $%&
Tests specified in the Test Procedures Plan Plan will 1e carried performed $%&
D+# What should you do with the !2S checlist when an installation proect is
complete?
Remove the !2S checlist and other confidential 3racle 2ntellectual Property from
the customer datacenter $%&
D'# What is the purpose for the 3perational 6andover step in the !2S 0ethodolo)y?
"ocuments the installation and confi)uration of CustomerGs system$s& $%&
D# Accordin) to the !2S methodolo)y, when issues are uncovered durin) the Site*
Audit, who should 1e notified?
2nstallation coordinator if applica1le $%&
Customer point of contact $%&
D5# Which four documents are included as part of the 3perational 6andover?
Site Audit Report $%&
Test Procedures Plan $%&
2nstallation and Confi)uration Plan $%&
System "ocumentation $%&
Why should you use the !2S methodolo)y to )uide your installation process?
.sin) the proven !2S methodolo)y will provide step*1y*step installation )uidelines,
help )uarantee a quality installation, mae your life easier, and ensure customer
satisfaction $%&
D# What three documents are typically used as part of the !2S Plannin) and
Preparation sta)e in the installation process?
2nstallation and Confi)uration Plan $%&
Site Audit Report $%&
Test Procedures Plan $%&
D(# :ame two functions for the !2S*"/" durin) the 2nstallation and Confi)uration
of 3racle 6ardware and Software step in the !2S methodolo)y?
Provides installation assessment and dia)nostic tools $%&
Contains required patches and firmware for most installations $%&
7E# Why is the rate of temperature chan)e when acclimatiin) systems such an
important factor as descri1ed in the !2S methodolo)y?
/ariations in temperature should not e8ceed the approved )radient of appro8imately
+� C $� 9& per hour, 1ecause i)norin) this may could lead to lon)*term dama)e
$hair*cracs& on the 1oards $%&
What are two cautions that should 1e acnowled)ed when acclimatiin) a system?
The ma8imum positive or ne)ative temperature )radient that is permitted for multi*
layerH1rI1oards is appro8imately +� C $� 9& per hour# $%&
Avoid unpacin) items inside the computer centre $dust4dirt contaminatin) filters
etc#& $%&
7# 2f the customer has ased for some customiation of their installation, how
is testin) for that accomplished? Choose all responses that apply#
Testin) a1ove and 1eyond the Covered System Tests are at the sole discretion of
3racle and4or the Partner installer $%&
Additional tests can 1e inserted into the Test Procedures plan $%&
75# What are the four ey points covered in each test topic of the Test
Procedures Plan?
31ective $%&
Test Result $%&
3utcome $%&
0ethod $%&
7(# What are the two primary o1ectives for the 2nstallation Confi)uration
Plannin) step of the !2S methodolo)y?
Tests that will 1e performed durin) the Systems Testin) will 1e defined# $%&
3racle4Partner and Customer will determine and mutually a)ree upon the hardware and
software installation requirements which will 1e documented in the 2nstallation and
Confi)uration Plan $%&
E# What are two statements that are true a1out !2S checlists?
!2S installation checlists are intended to )uide the installer throu)h the
installation in a lo)ical and consistent manner $%&
Checlists are intended as )uidelines for properly trained installers and are :3T a
su1stitute for appropriate product trainin)# $%&
What tass occur durin) the operational handover phase of the !2S methodolo)y?
Review the 3penoffice presentation on !2Sdoc / found on the !2S Plannin) J
"ocumentation we1 pa)e $%&
Review the � !2Sdoc / ettin) Started Coo1oo� and � Success with !2Sdoc /
Coo1oo� $%&