S.M.Engineers & Consultants Project : M/s. CONCORDE TEXTILE Date: 04.03.

13

Power Cable Schedule - DG Installation Rev : 0

Size in Sq.mm

Actual Length
Current in (A)

Type of Cable

Voltage Drop
Total Length

Termination
No. of Runs

No.of Cores
Rating (A)

Length in
Cable No.

Full Load

Remarks
Breaker

Voltage

in Mtrs.
Circuit

No. of

(In %)
From

in (V)

Mtrs.
To

(*)
XLPE Al.
1 250KVA DG Control Panel DG Incomer 400 - 1.1 2 3.5 185 60 120 4
Ar.
XLPE Al.
2 Main LT Panel - 2 Main LT Panel - 1 250 - 1.1 1 3.5 185 35 35 2
Ar.

Note: * Actual Length to be filled by the Contractor based on site conditions and to be submitted to Consultant for Approval.