You are on page 1of 4

Activity ID Activity Description Discipline Description

CHNCPPRCAR1010 [PPR] STL STR_Pipe Rack AR Padding

CHNCPPRCAR1010 [PPR] STL STR_Pipe Rack AR Grouting

CHNBFS2CAR1070 [FS2] Finish Work_FGD Control Bldg AR Construction Work

CHNBADBCAR1060 [ADB] Finish Work_Administration & Services Bldg AR Construction Work


[FLS] Cladding & Roof Work_LS Slurry Preparation & Gypsum Dewatering &
CHNBFLSCAR1080 AR Structure Setting
Storage Bldg
[FLS] Cladding & Roof Work_LS Slurry Preparation & Gypsum Dewatering &
CHNBFLSCAR1080 AR Align the Structure
Storage Bldg
[FLS] Cladding & Roof Work_LS Slurry Preparation & Gypsum Dewatering &
CHNBFLSCAR1080 AR Bolt Tightening
Storage Bldg
[FLS] Cladding & Roof Work_LS Slurry Preparation & Gypsum Dewatering &
CHNBFLSCAR1080 AR Grouting
Storage Bldg
[FLS] Finish Work_LS Slurry Preparation & Gypsum Dewatering & Storage
CHNBFLSCAR1090 AR Construction Work
Bldg
CHNBCHSCAR2040 [CHS] Finish Work_Chemical Dosing Pump Shelter for Coal Run-off Pond AR Construction Work
[CHS] STL STR & Cladding_Chemical Dosing Pump Shelter for Coal Run-off
CHNBCHSCAR2030 AR Structure Setting
Pond
[CHS] STL STR & Cladding_Chemical Dosing Pump Shelter for Coal Run-off
CHNBCHSCAR2030 AR Align the Structure
Pond
[CHS] STL STR & Cladding_Chemical Dosing Pump Shelter for Coal Run-off
CHNBCHSCAR2030 AR Bolt Tightening
Pond
[CHS] STL STR & Cladding_Chemical Dosing Pump Shelter for Coal Run-off
CHNBCHSCAR2030 AR Grouting
Pond
CHNBWWHCAR1060 [WWH] Finish Work_Workshop & Warehouse Bldg AR Construction Work

CHNBMFGCAR1060 [MFG] Finish Work_Mobile Facility Garage AR Construction Work

CHNBMFGCAR1040 [MFG] STL STR Work_Mobile Facility Garage AR Structure Setting

CHNBMFGCAR1040 [MFG] STL STR Work_Mobile Facility Garage AR Align the Structure

CHNBMFGCAR1040 [MFG] STL STR Work_Mobile Facility Garage AR Bolt Tightening

CHNBMFGCAR1040 [MFG] STL STR Work_Mobile Facility Garage AR Grouting

CHNBMFGCAR1050 [MFG] Roof Work_Mobile Facility Garage AR Structure Setting

CHNBMFGCAR1050 [MFG] Roof Work_Mobile Facility Garage AR Align the Structure

CHNBMFGCAR1050 [MFG] Roof Work_Mobile Facility Garage AR Bolt Tightening

CHNBMFGCAR1050 [MFG] Roof Work_Mobile Facility Garage AR Grouting

CHNBWAHCAR1030 [WAH] Masonry Work_Wharf Amenities House AR Construction Work

CHNBWAHCAR1040 [WAH] Finish Work_Wharf Amenities House AR Construction Work

CHNBGH_CAR1050 [GH_] Finish Work_Gate House AR Construction Work

CHNBFLHCAR1060 [FLH] Finish Work_Limestone Unloading Bldg AR Construction Work

CHNBMOSCAR1050 [MOS] Finish Work_Mosque AR Construction Work

CHNBFWWCAR1060 [FWW] Finish Work_FGD WWT Bldg AR Construction Work

CHNBFWWCAR2040 [FWW] Finish Work_FGD WWT Shelter AR Construction Work

CHNBFWWCAR2030 [FWW] STL STR_FGD WWT Shelter AR Structure Setting

CHNBFWWCAR2030 [FWW] STL STR_FGD WWT Shelter AR Align the Structure

CHNBFWWCAR2030 [FWW] STL STR_FGD WWT Shelter AR Bolt Tightening

CHNBFWWCAR2030 [FWW] STL STR_FGD WWT Shelter AR Grouting


Total Total Accumulated
Measurement Unit Unit
Quantity Quantity Actual (~11/29)
Step (%) (Each Disc.) (Report)
(Each Disc.) (Report) (Each Disc.)
5 M3 M3 100 100 98.7

10 M3 M3 100 100 98.7

100 M2 EA 100 100 96

100 M2 EA 1723.09 1723.09 1400

45 M2 Ton 100 100 40

15 M2 Ton 100 100 40

25 Ton Ton 100 100 40

10 M3 M3 100 100 40

100 M2 EA 1396.78 1396.78 69.84

100 M2 EA 330.15 330.15

45 Ton Ton 24.37 24.37 8.45

15 Ton Ton 24.37 24.37

25 Ton Ton 24.37 24.37

10 M3 M3 100 100

100 M2 EA 1994.85 1994.85 1000

100 M2 EA 122.55 122.55

45 Ton Ton 25.84 25.84 11.37

15 Ton Ton 25.84 25.84

25 Ton Ton 25.84 25.84

10 M3 M3 0.15 0.15

45 Ton Ton 28.4 28.4 11.37

15 Ton Ton 25.84 25.84

25 Ton Ton 25.84 25.84

10 M3 M3 0.15 0.15

100 M2 EA 100 100 30

100 M2 EA 100 100 30

100 M2 EA 100 100 30

100 M2 EA 122.62 122.62 85

100 M2 EA 433.03 433.03 10

100 M2 EA 186.58 186.58

100 M2 EA 76.12 76.12

45 Ton Ton 14 14 9.1

15 Ton Ton 14 14 9.1

25 Ton Ton 14 14 9.1

10 M3 M3 100 100 70
Accumulated Accumulated Accumulated
Accumulated Accumulated Start Date
Actual (~11/29) Actual (~12/06) Actual (~12/06)
Achieved Step (%) Earned Progress (%) (Actual)
(Report) (Each Disc.) (Report)
98.7 98.7 98.7 4.935 8/24/2019

98.7 98.7 98.7 9.87 8/24/2019

98 98 98 98 8/19/2020

1500 1500 87.052911 87.052911 6/5/2020

40 50 40 18 2/25/2020

40 50 40 6 2/25/2020

40 50 40 10 2/25/2020

40 50 40 4 2/25/2020

7 97.7746 0.501153 0.501153 5/25/2020

7/20/2020

10 8.45 41.034058 18.465326 6/4/2020

6/4/2020

6/4/2020

6/4/2020

1000 1100 50.129082 50.129082 7/10/2020

1/23/2021

11.37 11.37 44.001548 19.800697 11/7/2020

11/7/2020

11/7/2020

11/7/2020

11.37 11.37 40.035211 18.015845 12/23/2020

12/23/2020

12/23/2020

12/23/2020

30 30 30 30 10/17/2020

30 30 30 30 12/16/2020

40 30 40 40 2/9/2021

90 85 73.397488 73.397488 5/19/2020

30 20 6.927926 6.927926 8/23/2020

20 20 10.719263 10.719263 2/21/2020

4/21/2020

10 14 71.428571 32.142857 2/21/2020

10 14 71.428571 10.714286 2/21/2020

10 14 71.428571 17.857143 2/21/2020

71 100 71 7.1 2/21/2020


Finish Date B/L Start B/L Finish
Remark
(Actual) (Plan) (Plan)

6/23/2020 8/24/2019 6/23/2020

6/23/2020 8/24/2019 6/23/2020

12/16/2020 8/19/2020 12/16/2020

12/1/2020 6/5/2020 12/1/2020

5/24/2020 2/25/2020 5/24/2020

5/24/2020 2/25/2020 5/24/2020

5/24/2020 2/25/2020 5/24/2020

5/24/2020 2/25/2020 5/24/2020

8/22/2020 5/25/2020 8/22/2020

8/13/2020 7/20/2020 8/13/2020

7/19/2020 6/4/2020 7/19/2020

7/19/2020 6/4/2020 7/19/2020

7/19/2020 6/4/2020 7/19/2020

7/19/2020 6/4/2020 7/19/2020

12/6/2020 7/10/2020 12/6/2020

5/9/2021 1/23/2021 5/9/2021

12/22/2020 11/7/2020 12/22/2020

12/22/2020 11/7/2020 12/22/2020

12/22/2020 11/7/2020 12/22/2020

12/22/2020 11/7/2020 12/22/2020

1/22/2021 12/23/2020 1/22/2021

1/22/2021 12/23/2020 1/22/2021

1/22/2021 12/23/2020 1/22/2021

1/22/2021 12/23/2020 1/22/2021

12/15/2020 10/17/2020 12/15/2020

4/7/2021 12/16/2020 4/7/2021

6/8/2021 2/9/2021 6/8/2021

8/16/2020 5/19/2020 8/16/2020

1/5/2021 8/23/2020 1/5/2021

8/18/2020 2/21/2020 8/18/2020

7/4/2020 4/21/2020 7/4/2020

4/20/2020 2/21/2020 4/20/2020

4/20/2020 2/21/2020 4/20/2020

4/20/2020 2/21/2020 4/20/2020

4/20/2020 2/21/2020 4/20/2020