TITLE OF THE ACTIVITY: Installation of Handrails & Railings
RISK ASSESSMENT REF No.: RCC/RA/OL
ASSESSOR: | Safety & Project Departments ASSESSED DATE: 14/08/2016 REVIEWED DATE:
aa feed ‘RESIDUAL RISK
consequences; |_evatuarron | deve, pon
sw | acnviry HAzaRo CAUSES OF HAZARD [IMPLEMENTED CONTROL MEASURES ser
ae P s | wm ets [um |
3 | Nanas nding Troy em wear tent ES
: ands > rd ect handle
| Aare a coeruncn
|
| |
| Wermnget | Unstable working | Faure to flow sae procaine | In any >
ron pation ed nesegvate ssppertng
3 5 as | 5 5 .
Poae ofaRISK ASSESSMENT <<
Rc
‘TITLE OF THE ACTIVITY: Installation of Handrails & Railings
RISK ASSESSMENT REF No, ROC/RAOLL SSN Som
ASSESSOR: | Safety & Project Departments | ASSESSED DATE? [14/08/2016 _| REVIEWED DATE:
om bya RESIDUAL RISK
sw | acuvmy | nazano causes or nazano | CONSEgUENEES/ |_EVALURTION LEVEL sp euerep CONTROL MEASURES ——— *Use onyinustial socket for pugsing | =| oy
Page loaRISK ASSESSMENT Ne
is a =o
TITLE OF THE ACTIVITY: Installation of Handrails & Railings
Rowan Cyt Congruction
RISK ASSESSMENT REF No.: RCC/RA/OLL i
‘ABsESEOR: | Sulety& Proje Dparnens | ASSESSED DATE: ra7oero16 [REVIEWED BATE
orby workers round the mer re
Personal protective equipment
iret, Safety Snoes Covers, gout. Lather had loves, SoatyHomece
1+ Alipersonel inthe team ae tobe made anare of he sae sytem of werk
‘emergency procedures
to ope wih any sina inunes th
sid be mentored by Foreman and charge hand who are tained to ensure tht any adios precautions or eQuement required te
nto =a coe Sud. Uf,
Page 30F4‘TITLE OF THE ACTIVITY:
RISK ASSESSMENT
Installation of Handrails & Railings
RISK ASSESSMENT REF No.:
RCC/RA/OLL
assessor: | sofcy 8 rice dopanmens [ASSESSED oaTE ~~ vaouraoig
REVIEWED DATE:
RISK MATRIX
TIRETHOOD
Likely ai
fee sneregerceamonthor | “mld
‘pact °
Minor 2
Moderate 2
Siniicane ‘
RI it
RISK LEVEL [ACTION AND TIMESCALE
ry ‘Quick, easy controls should be implemented immediately and further action planned for when resources permik. Monitoring requ
ensuring contro’
report must be competed
5-12
Medium
{Stephane about the actions that shoulé be taken to reduce the risks. indent report must be completed. Inccert must be 26ded
to service risk register
15.25
High