See nee nce itd INSPECTION AND TEST PLAN
PROJECT- PHASE IV
ZONE S09, $10 & S11
WORK SCOPE
BLOCK WORK (CMU)
PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS
ttem | Description of Operationinspection, Test | Frequency of inspection | Records Hold, or Witness Point
No. | and Approval & Test Plan Generated“ Supcon [ROG | ERAF
1 | Shop Drawings and Detais once Removed | swt |e [Raa
2 _| Materials Submital Once Material Submits | Sub | R | R&A
3__| inspection & Test Plan Once iP Sub | R [REA
4__| Work Notification to Start New Activity Once Approvalofwork | Sub | R | R&A
'Note*- All deviation from the approved drawings/documents to be recorded and discussed wih the Main Consultant prior
to proceeding. * Other subcontractor/sub consultant engaged by RCC. ** By RCC
PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS
Frequency of Hold, or Wiiness Port
ttom | Description of Operation/nspection, Test and | ,, frequency Of Records old, or Witness Poin
No. ‘Approval Plan Generated |"Subcon [ RCC | EHAF
by
MATERIAL INSPECTION
1 | MATERIAL INSPECT! en MIR H | H | Rea
By
2 | MORTAR MIX preatsiertatiayas,| VISUAL Ho] nf rea
‘SURFACE PREPARATION, LAYOUT AND
3 SET UT CMU Ey IR H H s
Area/Stages/Layout
LINTEL REINFORCEMENT AND POURING By
4 | COORDINATION WITH MEP & STRUCTURAL | Area/Stages/Layout INES # ne ae
By
ULL HEIGHT MASONRY INSPECTION
e Area/Stages/Layout i a a Lees
“Abbreviations: Sub- SUBMIT, H- HOLD, RBA- REVIEW & APPROVE, RC- RANDOM CHECK, I8A- INSPECT & APPROVE, S-
'SURVEILANCE, CL= CHECKLIST, IR- INSPECTION REQUEST, I- INSPECT
Inspect Heek-wWork (EMA