You are on page 1of 1

SHEET TOTAL

NO. SHEETS
XX

xxxxxxxx CASE NUMBER

SYMBOLS MANNER OF COLLISION

REAR-END HEAD-ON

OVERTAKE LEFT-TURN

OUT OF CONTROL RIGHT-TURN

BREAKLINE - DWG. TR-4


SKIDDING RIGHT-ANGLE

SIDE-SWIPE SIDE-SWIPE

WILLOWDELL ARCH
(SAME DIRECTION) (OPPOSITE DIRECTION)

DR
ST
EA
CENTER DRIVE

PRELIMINARY
DR
S T
EA

E6
5T
H
ST
CITY OF NEW YORK
BREAKLINE - DWG. TR-2 DEPARTMENT OF TRANSPORTATION
DIVISION OF BRIDGES
PREPARED BY: ALTERED BY: NYS P.I.N. NO. XXX FED. AID PROJ. NO.

NYC P.I.N. NO. 84118MNBR191 N/A

CONTRACT NO. HBMA24613 CD NO. XX

PLAN REHABILITATION OF
WILLOWDELL ARCH BRIDGE
BOROUGH OF MANHATTAN B.I.N. 2-24613-0
PREPARED BY:

IN CHARGE SU DRAFTER MC
DESIGNER PC CHECKER SG

IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND DWG. NO. SCALE DATE SHEET NO.
SURVEYOR SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE
ALTERATION. TR-1 AS SHOWN APRIL 21, 2020 001

You might also like