You are on page 1of 10
EPESOL PVT LTD ProjectName | P346 Relay Commissioning Customer Attock Refinary (ARL) Service Dates _ | 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Tested By: Mr. Muhammad Usman ‘Witnessed By: Mr. Aamir Ali Khan 1. Relay Test Set Information Test Set Make Doble Model F6150 Testing Date (01.01.2021, 2, Protection Relay data Relay Designation P346 ‘Model P346811A2MO360M Make GE Alstom, Serial No. '35060817/06/20 “Terminal Side CT Ratio 250/50 Neutral Side CT Ratio 250/5.A Ground CT Ratio 100/54 Phase VT Ratio 21.0 KV/T10V, 3. Current Metering 1_| tinesidecr | 2.60 | 2.60 120 | 129.8 | 367.2 | 366.9 | -180.0 | 60.0 | -s99 ‘Neutral Side cr. 2.60 | 2.60 120 | 1298] 1299] 1298] 0 | -1200| 1200 4. Voltage Meteri 1 | 63s | 635 | 63s 6342 | 6339 | 6326] 0 | -1200 | 1200 Stator Differential (876) 5.1 Trip Settings A[Page Partner GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD Customer “Attock Refinary (ARL) Service Dates | 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Witnessed By: Mr. Aat Tested By: Mr. Muhammad Usman 5.2 Stability Test 5.3 Pickup Accuracy 0. O74 0 O75: 0.0 00) oo | o | 00 ‘00 [0 | 00 o74 | 240 | 0.74 | 120 075 | 240 | 075 | 120 oo | 0. 00 [0 o74 [0 07s [0 54 Time Accuracy ‘No Picky Picky; No Picky Picky 240] 0.74 | 120 240 | 0.75 | 120 of 00 | 0 o [oo | 0 6, Phase Under voltage (27P) 61 Stage 1 Settings Note: Phase angle difference was also checked and the relay tripped at difference of 10 degree. ‘90.0V ph-ph (51.96 ph-n-90/1.732) 02 a_| Pickup’ TMS 3_[ Curve DMT ‘Note: Operating time = K / (M- 1) Where: K= Time multiplier setting )perating time in seconds M = Measured voltage/relay setting voltage (V< Voltage Set) 6.2 Pickup Accuracy 2[Page Partner GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD Customer ‘Attock Refinary (ARL) Service Dates | 28.12.2020 9 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Tested Byt Mr. Muhammed Usman Witnessed By: Mr Aamir Ahan EB Time hearaey 1] a0 | 70 | «0 | 0 | 20 | 10 | 209 | 207 2] #0 | «0 | «so | 0 | a | x20] a9 | 50 7. Phase Overvoltage (59P) 7A Trip Settings pusiags: 120V ph-ph (69.28 ph-n->120/1.732) IDMT 0.550 Note: Operating time = K /(M- 1) Where: K=Time multiplier setting )perating time in seconds M-= Measured voltage/relay setting voltage (V> Voltage Set) 7.2 Pickup Accuracy z 69.2 69.2 69.2 0 240 120 No Pickup 2 63 693 693 0 240 120 Pickup 2 75.0 75.0 75.0 0 240 120 66 684 8. Under Frequency (81U) B.A Settings Partner 31Page GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD Customer Attock Refinary (ARL) Service Dates | 28.12.2020 9 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Witnessed By: Mr. Aamir All Khan 8.2 Pickup Accuracy 1 635 635, 635 ° 240 120 No Pickup 2 635 63.5 635) 0 240 120 8.3 Time Accuracy 9. Over frequency (810) 9.4 Settings Pickup 2 [Delay I 20s ‘9:2 Pickup Accuracy No Pickup Plelkup 10. Loss of Excitation (40) 10.1 Field Failure 1 Settings 4[Pa Partner GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD. Customer “Attock Refinary (ARL) Service Dates _| 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Tested By: Mr. Muhammad Usman Witnessed By R Alarm angle Note: L.73*VAItsing0° a equ Xalexb1 254309 33.4 ohm = 635/334 1.901 amp Srenane 10.2 Pickup Accuracy 1_[ 635 | 0 | 635 | 240 | 635 | 120 | 1.902 | 90 | 1902 | 330 | 1.902 | 210 | NoPickup 635 | 0 | 635 | 240 | 635 | 120 | 1903) 90 | 1.903 | 330 | 1903 | 210 | Picky 10.3 Time Accuracy T Applied current ( [a 10.4 Field Failure 2 Settings 3_| Delay 60.0 ms Partner s|Page wee GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD Customer ‘Attock Refinary (ARL) Service Dates | 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Tested juhammad Usman Witnessed By: Mr. Aamir Ali Khan Note: P= L73-VeI*sin90" voe a equi z Xa2+Xb2 z 25+190 z 215 ohm Us I = 635/215 I = 2953amp 10.5 Pickup Accuracy 1_| 635 | 0 | 635 | 240 | 635 | 120 | 2.954 2.954 | 330 | 2.954 | 210 | No Pickup 2_ [635 To [63s | 240 | 635 [120 [2.955 2.955 | 330 | 2955 | 210 | Pickup 3} | 10.6 Time Accuracy ° Note: P= ——_-3*V"I"eos1800 14.4 Pickup Accuracy a [| «3s | 0 | 63s | 240 | 635 | 120 | 0237 | 160 | 0237 | 60 | 0237 | 300 | NoPidup 2 [es [o| 43s | 240 | 63s | 120 | 0238 | 160 | 0298 | 60 [0238 [300 | Pidup 11.2 Time Accuracy 1 [| es | 0 | eas | 240 | 635 | 120 [o240| 100 | 0240 | 60 | 0240 | 300 | sos Partner 6|Page GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD Customer ‘Attock Refinary (ARL) Service Dates _ | 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 Tested By: Mr. Muhammad Usman Witnessed By: ‘Ali Khan 12, Reactive Power Settings 1_| Pickup 300.0 VAR 2_[ Delay 50s Note: Po = 3*V*I*sin90° 12 Pickup Accuracy 1 | 635 | o | 635 | 240 | 635 | 120 | 158 | 90 | 150 | 330] 15e | 210 | NoPickup (eTess To Tess [20 | 63s | 120 [a9 | 90 [159 [330] 159 [210 | Pidup 12.2 Time Accuracy 1 | 635 | o | 35 | 240 | 635 | 120 | 16 | 90 | 16 [330] 16 | 210 | 5.04 13, Phase Overcurrent (50/51) 13.1 Trip Settings 1 [bt 404 2 [Curve TEC Very Inverse 3 [Hs 06 4 [ba 20.08 5_|cune Dr 6_| Time Delay 00) Note: OperatingTime = ~—= (13.5 *TMS) /p)-1 Fault Current Pickup Current Time Dial i Partner Page eae GE Energy ProjectName | P346 Relay Commissioning EPESOL PVT LTD Customer Attock Refinary (ARL) Service Dates _ | 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 1 3.99 3.99 2 4.00 4.00 4.00 0 240 120 Pickup 13.3 I>1Time Accuracy 2 80 80 80 0 240 120 8.10 8.11 13.4 [>2 Pickup Accuracy 1 129 12.9 12.9 0 240 120 No Pickup 2 130 13.0 13.0 0 240 120 Pickup Note: For the Testing purpose the Pickup value was changed from 20A to 13A for testing purpose. 13.5 >2Time Accuracy 1 15.0 15.0 15.0 ° 240 120 39.10 14. Ground Overcurrent (50N/S1N) 14.1 Trip Settings 1_ [Nr 208 2_| Curve! TEC Very Inverse 3 TMS oa 4 [Inez 0.04, 5_| Curve! Dr 6_| Time Delay 00) Partner s|Page GE Energy EPESOL PVT LTD 346 Relay Commissioning ‘Attock Refinary (ARL) 28.12.2020 to 03.01.2021 Report Description: Test Report of Generator Protection Relay P346 for Engine-1 ‘Tested By: Mr. Muhammad Usman Witnessed By: Mr. Aamir Ali Khan 1.99 Note: Operating Time = Fault Current Pickup Current ‘Time Dial 0.00 (/Ip)-1 No Pickup 2.00 0.00 Pickup 14.3 IN>1Time Accuracy 1444 IN>2 Pickup Accuracy 1 10.0 0.00 0.00. 0 240 120 No Pickup 2 10.4 0.00 0.00 0 240 120 Picleup 14.5 IN>2Time Accuracy 1 105 0.00 0.00 0 240 120 37.70 15. Verification of LEDs: Reactive Power or ‘Configuration ‘Status 1 LEDT ‘Gen Differential (876) OK 2 LED2 Overcurrent (50/51) OK 3 ‘LEDS: Field Fail (40) OK 4 Reverse Power (32P) 5 [Page Partner GE Energy * EPESOL PVT LTD Report Descriptio ested By: Mr. Muhammad Usman Project Name Customer Service Dates Test Report af Generator Protection Relay P346 for Engine-1 Witnessed By: Mr. Aamir Ali Khan P346 Relay Commissioning, ‘Attock Refinary (ARL) 28.12.2020 10 03.01.2021, je Over/Under Frequency (81-0/81-U) oK | 7 Under Voltage (27P) oK || s Over Voltage (59P) OK i 9 Ground 0/C(51N/SON) 0K 16, Verification of Output Relays: sr ‘Out Relay Configuration | 1 RS Ground 0/C{S1N/SON) 2 Under Voltage (272). 3 zi ‘Over Voltage (59P) ele + Gon Ditferemuial (876) |e = ent (50/51) |e = \|7 Reverse Power (32) 8 Reactive Power (32) jo Over Hrequency (810) 10 Under Frequency (810) Performed By: FSU Engineer EPESOL Put Limited lo) NA Mr. Aamir Ali Khan E&I Engineer Attock Oil Refinary i Kl Partner GE Enerey

You might also like