Project Charter ii
Error! Use the Home tab to apply Version Number to the text that you want to appear here.
MM/DD/YYYY<Pub Date>MM/DD/YYYY
Table of Contents
1. Introduction.................................................................................................................1
1.1 Project and Product Overview...........................................................................1
1.2 Purpose of Project Charter................................................................................1
2. Justification................................................................................................................1
2.1 Business Need..................................................................................................1
2.2 Business Impact................................................................................................1
2.3 Strategic Alignment...........................................................................................2
3. Scope...........................................................................................................................3
3.1 Objectives..........................................................................................................3
3.2 High-Level Requirements..................................................................................3
3.3 Major Deliverables.............................................................................................3
3.4 Boundaries.........................................................................................................4
4. Project Organization..................................................................................................4
4.1 Roles and Responsibilities................................................................................4
4.2 Stakeholders......................................................................................................8
5. Duration.......................................................................................................................9
5.1 Timeline.............................................................................................................9
5.2 Milestones..........................................................................................................9
6. Budget Estimate.........................................................................................................9
6.1 Funding Source.................................................................................................9
6.2 Estimate.............................................................................................................9
7. Assumptions, Constraints and Risks....................................................................10
7.1 Assumptions....................................................................................................10
7.2 Constraints.......................................................................................................10
7.3 Risks................................................................................................................10
Appendix A: Record of Changes..........................................................................12
Appendix B: Acronyms.........................................................................................13
Appendix C: Glossary............................................................................................14
Appendix D: Referenced Documents...................................................................15
Appendix E: Approvals.........................................................................................16
Appendix F: Notes to the Author / Template Instructions.................................17
List of Figures
Figure 1: Example of a High-Level Timeline....................................................................12
List of Tables
Table 1: Strategic Alignment..............................................................................................5
Table 2: High-Level Requirements....................................................................................6
Table 3: Major Deliverables...............................................................................................6
Table 4: Roles and Responsibilities..................................................................................7
Table 5: Milestones..........................................................................................................12
Table 6: Risks..................................................................................................................14
Table 7: Record of Changes............................................................................................15
Table 8: Acronyms...........................................................................................................16
Table 9: Glossary.............................................................................................................17
Table 10: Referenced Documents...................................................................................18
Table 11: XLC Template Revision History.......................................................................21
1. Introduction
ABC Corporation has been experiencing substantial backlogs in their new claim
requests based upon their antiquated processing system. They have contracted with
<Contractor’s Name> to create a robust processing system. The purpose of this project
is to create a system to more effectively handle ABC’s claims and decrease the turn-
around time for each claim by 2 hours. The project entails the analysis, development,
testing, implementation, and maintenance of the new claims processing system, as well
as subsequent training of the ABC staff. It should take 18 months to complete and cost
$1.5M.
The <Project Name> project charter formally authorizes a project, describes the
business need for the project and the product to be created by the project. It provides
the project manager with the authority to apply up to a certain level of organizational
resources to project activities. It is created during the Initiating Phase of the project.
The intended audience of the <Project Name> project charter is the Business Sponsor
and Critical Partners.
2. Justification
outcomes that will result directly from the project’s performance. Please note that
performance measures will be crafted in future deliverables related to these targeted
outcomes.
3. Scope
3.1 Objectives
The objectives of the <Project Name> are as follows:
Insert Objective 1
Insert Objective 2
Add additional bullets as necessary
3.4 Boundaries
Instructions: Describe the inclusive and exclusive boundaries of the project. Specifically
address items that are out of scope.
4. Project Organization
Project Estimated % of
Name & Organization Project Role
Responsibilities Effort
Project Estimated % of
Name & Organization Project Role
Responsibilities Effort
Project Estimated % of
Name & Organization Project Role
Responsibilities Effort
Project Estimated % of
Name & Organization Project Role
Responsibilities Effort
4.2 Stakeholders
Instructions: A stakeholder is a person or organization that is actively involved in the
project, or whose interests may be positively or negatively affected by execution or
completion of the project. A stakeholder may also exert influence over the project and
its deliverables.
5. Duration
5.1 Timeline
Instructions: An example of a high-level timeline is provided below.
5.2 Milestones
The table below lists the high-level Executive Milestones of the project and their
estimated completion timeframe.
Table 5: Milestones
Milestones Estimated Completion Timeframe
6. Budget Estimate
6.2 Estimate
This section provides a summary of estimated spending to meet the objectives of the
<<Project Name>> project as described in this project charter. This summary of
spending is preliminary, and should reflect costs for the entire investment lifecycle. It is
BY+4 &
PY* CY BY BY+1 BY+2 BY+3 Beyond Total
Planning 0
Acquisition 0
Maintenance 0
7. Sub Total 0 0 0 0 0 0 0 0 Assumptions,
# of Govt. FTE
Govt. FTE Costs 0
Constraints
Total Costs 0 0 0 0 0 0 0 0 and Risks
7.1 Assu
mptions
This section identifies the statements believed to be true and from which a conclusion
was drawn to define this project charter.
Insert description of the first assumption.
Insert description of the second assumption.
Add additional bullets as necessary
7.2 Constraints
This section identifies any limitation that must be taken into consideration prior to the
initiation of the project.
Insert description of the first constraint.
Insert description of the second constraint.
Add additional bullets as necessary
7.3 Risks
Instructions: List the risks that the Business Owner should be aware of before making a
decision on funding the project, including risks of not funding the project.
The table below presents the known risks which could have a major impact on the
outcome of the project and associated mitigation strategy that the business
owner/project team will take to manage them.
Table 6: Risks
Risk Mitigation
Appendix B: Acronyms
Instructions: Provide a list of acronyms and associated literal translations used within
the document. List the acronyms in alphabetical order using a tabular format as
depicted below.
Table 8: Acronyms
Acronym Literal Translation
Appendix C: Glossary
Instructions: Provide clear and concise definitions for terms used in this document that
may be unfamiliar to readers of the document. Terms are to be listed in alphabetical
order.
Table 9: Glossary
Term Definition
Appendix E: Approvals
The undersigned acknowledge that they have reviewed the Project Charter and agree
with the information presented within this document. Changes to this Project Charter will
be coordinated with, and approved by, the undersigned, or their designated
representatives.
Instructions: List the individuals whose signatures are desired. Examples of such
individuals are Business Owner, Project Manager (if identified), and any appropriate
stakeholders. Add additional lines for signature as necessary.
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Some text and tables are provided as boilerplate examples of wording and
formats that may be used or modified as appropriate.
5. Figure captions and descriptions are to be placed centered, below the figure.
All figures must have an associated tag providing appropriate alternative text
for Section 508 compliance.
6. Delete this “Notes to the Author / Template Instructions” page and all
instructions to the author before finalizing the initial draft of the document.