You are on page 1of 2
u/s JABAL OMAR DEVELOPMENT PROJECT D | DOCUMENT TRANSMITTAL FORM (DTF) | | Contract No:883 ee ea | Work Package:CN12 aS ‘TO: MIS. EHAF Consulting Engineers | TRANS. NO:883-4-204-W04Z-C-CN12-RCC-ECE-TRN-NA-1062 FROM: Ruwad Civil Construction (RCC) | DATE: 29-Nov-2014 pe = ATTN: Mr. Ahmed Atta (CRE) CIREF: | WEARE SENDING: | SUBMITTEDFOR: ——=«| ACTION TAKEN: BZ Documents | OA-Approved 0 a o 1 B-Approved as noted, | Drawings/Sketch Review & Comments iL {Ey Information / Records Only | Forneceseary Action QO 1 Boarspecitcation i [D1 Reviewed as Compliant S- Reviewed as Noted, O | oer: | 7 o Incorporate comments 1 with comments, | C1| Separate Cover [Ol iecee ose Item | Submittal or Document No. | Rev. | Date Description of Submittal or Copies No. ryan Nas Document Title | ""883-4-204.W042-C-CN12- ] Method statement for Block Works 1 | Resopramasee 09 29-Nov-14 3 Hara : [As per attached 280k | ; =a = a Se. ” | ae 2) | co aeons Hs Approval Stettel | insite | [SES EEES | is Description of Submital or Document Tine (24 P MUNYA 20 | Sender Neme: _ Engr. Nabil Abdel Samad | | Designation: _ Sr. Construction Manager | ZA Received By Recipiont Date Tite copy Distribution “Jabal Omar Development Co Hill International [ Approved As Noted, Incorporate Comments ‘S-Reviewed As Noted, Incorporate Comments. T-Reviewed with comments, Revise & Resubmit N- Noted = Approved With Comments, Revise & Resubmit D- Rejected Page tof 1 ‘Doc JForm No: PSA-863-PP-02-05-FM Rev.0 eee eee Revision Date: 28:Sep-10_ Hi vations JABAL OMAR DEVELOPMENT PROJECT ae DOCUMENT SUBMITTAL FORM - CONSTRUCTION CONTRACTORS Contract No: 883 Work Package: CN12 TITLE: Method Statement ‘SUBMITTAL NO: 883-4-204.WO4Z -C-CN12-RCC-SBT-A0-0585 TO: _ EHAF Consulting Engineers | REV.NO.: 00 Z ma | FROM: Ruwad Civil Construction (RCC) DATE: ATTN: Mr. Ahmed Atta (CRE) ORIG. REI asa rap CSD - shop Drawing Schedule [] SMP - Samples COMM - Operating & Maintenance Manuals |_| OSCE - Program Schedule [] SHD ~ Shop Drawings Caer - Quality Pians & Procedures - COMP - Inspection & Test Plan] MUP - Mock Ups & QC Panels CJINC_- Insurance Certificates EST - Method Statement DTST - Test reports CIPBW- Bonds, Guarantees, Warranties v CIABD - As Buitt Drawings CAMP - Product & Materials Data CIOTH ~others- AU oer eso Oc-civil [] $-Structural [J A-Architectural [] E-Electrical [JM-Mechanical [] G-General [] 0-Coordination (CO Hinterior Design [1 T-Sections ~[] U-Urban / Master Planning Method Statement for Block Works Rien kaa ee Sto EK] Approval [_] R-Reviow & Comments [_] Q-As Requested [_] |-information / Records Only [_] N-Action [_] 0-Others: Engr. Nabil Abdel Samad Submited By Contractor Rep (¢, Construction Manager) Signature: Eoiscm uaa men ae en a Name: i ‘Signature: Date: CLIENT'S COMMENTS (optional) Name: Signature: __ Date: | STERN een UNS Ll Arpmoves L]B—Asproved as te, vin tay]: Aopoves win Comments, L_]D-reecee [] N-vctes Procood ncrperate Commons Wor ay Not Proceed, Recut hin Daye Rove Reswont (F] RReviewed As Compliant [_] S- Reviewed As Noted. Incorp. Comments [_] T- Reviewed With Comments, Revise / Resubmit DATE RECEIVED: DATE RETURNED: | ST Ua | For & On behalf Name: Signature: Page tof 1 oc Form No: PSA-883-PP-02-06-FM Rev.2 evision Date: 15-M

You might also like