You are on page 1of 7
j i Ress JABAL OMAR DEVELOPMENT PROJECT | Contract No:883 — ots US. EHAF Consulting Engineers | FROM: Ruwad Civil Construction (RCC) ATTN: Mr-Hesham ElGendy (CRE) 7 ___WEARE SENDING: | ACTION TAKE B_ Documents D1 A-approves | [Bs:Approved as noted, JET | Oratinoerene Review &Comments ___| "Tincorporate Comments O) | Revot | CAs Requested C1 Approved with Comments, 1 Change Order | D Information / Records Only Revice & Reeubmit OD teter BF _ForNeceesry Action “CD D-Rejected i OD invoice | 1 other: eae | D Boaispeciticat SENT Via i iewed as Compliant : ie ©) S- Reviewed as Noted, | O_oer: sampies [Banas [77 crprts ma “Reviewed with comments, | [| spn cover OU pcetemne em | Submittal or Document No. | Rev. | Date Description of Submittal or Copies | No. No. Document Title 883-4-204-W042-C-CN12-RCC- Revised inspection and testing plan (ITP) | 1 | set-a0-1820 |_ 00 [80-May-15 tor Block, Pastor, sereed, Paint work alert | See eee | As par attached eee * cieeees 2 eee | Zasormas I Response: * OG 2 Aaroral Sep B f ‘aaa: : — S| ‘om 5 ioranueas Sa eae AS eive’ | Sender Name: _ Syed Irfanullah Hussainy See Destnaten: (Chief Operating Ofer) taghd by Sender ‘ Received By Recipient Date Title Copy Distribution () Jabal Omar Development Co & Hill International ag eee aoe Romi Nad reaps Conan 6s Win Coors Rost OR | |_ReRevione As Compiant “S-Reviewed As Noted, Incorporate Comments T-Revoned min corner ee 3 Page tof Doo om No PSA-052--02-05-FN Rew 0 eviston Date 28-Sep-10 Intemational JABAL OMAR DEVELOPMENT PROJECT poe | DOCUMENT SUBMITTAL FORM - CONSTRUCTION CONTRACTORS | Contract No: 883 Technical Submittal ‘SUBMITTAL NO: 883-4.204:W/042-C-CN12-RCC-SBT-A0-1920 TO: _EHAF Consulting Engineers | REV.NO: 00 FROM: Ruwad Civil Construction (RCC) | DATE: 30-May-15 ATTN: Mr. Hesham El-Gendy (CRE) ORIG. REF: - _TRN-SI-3057 ate re-Qualifcation CSDS- shop Drawing Schedule [] SMP - ‘Samples (COMM - Operating & Maintenance Manuals OSCE - Program / Schedule CSHD - Shop Drawings Capp - Quality Plans & Procedures - QIITP - inspection & Test Pian [1] MUP - Mock Ups & QC Panels CONC .- insurance Certificates (CMPD - Product & Materials Data COOTST - Test reports (1 PBW- Bonds, Guarantees, Warranties 1 Method Statement Fo Sap-s omomangn SU een ie tesa Occ) O)S-structurat BJ A-Architectural [] E-Electical CIM-Mechanical O6-General F] 0-Coordination O)interior Design) T-Sections [] U-Urban / Master Planning Revised inspection and testing plan (ITP) for Block, Plaster, screed, Paint work Basements STE ‘Submitted By Contractor's Rep.: Gaon, meat Signature: Nose SRE Lene ed Name: Signature: Date CMe eee) Name: Signature: Date: SUPA eae oes D1 Arrsproves [EE Approves ts Noted, Work Mey] C- Approved with Comments, [_] Proceed Incorporate Commons Wor ay Not Prove Recut Wihin =< Daye Revise & Resubmit tL} Li Reviewed As Conptant [] S-Revewed As Noted, corp. Comments _] T- Reviewed Wih Comments, Reser Rant | ReFer To Comments Ja IPs fh-§. DATE RECEIVED: ‘DATE RETURNED: SUPERVISION CONSULTANT'S SIGNATURE For & On behalf Name: Mr. Hesham El-Gendy CRE _ Poge tof 1 Doc. /Form No: PSA-883-PP-02-06-FM Rev Revision Date: 16-Mar 2011 | >= |HELE iHar e Roc a l Corp [international Consulting INSPECTION, TEST & PLAN: JABAL OMAR DEVELOPMENT | PROJECT. PHASE Iv INSPECTION AND TEST PLAN | ZONE S09 | 7 WORK SCOPE l Block Works PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS [item] Dessition of Operatontnspecon. Test | Frequency ofinspectin | Records _|_Hols, or Wines Pon Na and Approval ares Pan Generated | “KE RS TEMA 1 Shop Drawings and Deas Once Bopreved | suns RaA 2 Materials Submitals Once Material Submitas | Sub | R | RBA 3__| Method Statement, Inspection & Test Plan Once wsaiTe | sub | R[R&A Approved Survey reference and Bench Marks i: ay em once Drawing Conta | sub" | R | REA cin 5 | Werk Noticaton to Sta New Activity Once Approval ofwork | Sub™ | R | RBA Note" Al deviation from te approved drawings/documenis to be recorded and discussed win te Wain Coreulant por to proceeding * Other subconvactorsub consultant angaged by ROG. "= By RCC PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS Frequency of Hold, or Witness Point tem | Desergton of Operatontnspecton, Test and Revords | Hold or Witness Po No ‘Approval Imepecion Test | Genereted (Ke ROO | EHAF tion By [2 [newt eters MIR 4 [| Rea 8) 2 | Mortar mi er falls suai x a Tift and up to Line or Inerdiate Baath 3 4 | Level block work ArealStagesayout_ | WinessForm | H | H | RC 5 _| Seotdnaton wih ME an ee eatsentsuson | ROH | H | H | tea 8 _| FuilHelghtorMasonninspecion —~. | prearsapbercayout R 8 | 4 | wa 7 7 Tesing of Grout material Compressive Stengjh | Random Test TestRepor | sub | H | s 2. Testing of Blocks tor Compressive Srengif” | eveyasasqm | TestRepon | sb | H | 8 ‘Abbreviations. Sub: SUBMIT, FOLD, RBA. REVIEW & APPROVE, RC- RANDOM CHECK, I@A INSPECT §| APPROVE, §- SURVEILANCE/Cl= CHECKLIST IR- NSPECTION REQUEST, | NSPECT | WITHACESPRIES AU SEALANT Log Te RESUBMATED Revised Inspection and Test Plan Page 1ofS i |——- o~— | HELE ——— EHAF | St |= intial Omar Dev. | PM Hl Main Consultant: Ehaf | Corp | international __ Consulting Contractor: RCC | INSPECTION, TEST & PLAN: fs BAL OMAR DEVELOPMENT PROJECT- PHASE IV INSPECT AND TEST PLAN ZONE S09 WORK erope Cutting the Services opening in CMU 7 Masonry Block Wall PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS of tem | Descripton of Operationiinspection, Test | Frequency of inpectn | Records | Hold, or Winess Point No. and Approval & Test Plan Generated Ke aco | Ear 18a ils of ce ‘Approved ub 1._| Shop Drawings and Details of block works | on peeroved | sur | R [R&A 2__| Method Statement inspection & Test Plan Once MS &ip | Sub | _R_| RBA ‘Approved 3 | Eleciical and Mechanic shop arenirg for once Drawings, Corto! | sub | R | REA —— Point 4 | Work Notification to Stan New Activiy Once Approval ofwork | Sub" | R | REA Note’ All deviation fem the approved drawings/documents to be recorded and discussed wih the Man Coneullant por to proceeding. * Other subcontactorsub consuitant engaged by CC. By RCC PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS: lem | Description of Operaontnspestion, Test and | ,jequerey Records [Hold or Witness Poin No. ‘Approval nea Generated “Taco | ERA 1 | NEP Opaning-sz5, locaton as per MEP shop By CeamessFom | yy |g sawings and layout ArealStagesiLayout | from MEP A nelSapseLayut # re ‘Abbreviations: Sub- SUBMIT, H- HOLD, RBA. REVIEW & APPROVE, RC- RANDOM GHEGK, aA. NGPECT APPROVE, S- SURVEILANCE, CL= CHECKLIST. IR: INSPECTION REQUEST. I: INSPECT Revised Inspection and Test Plan Page 2 of S Contractor: RCC >~= HELE [ev a I: ‘Ghent Tabal Omar Gav. | PMC-I Wain Consultant Ehat comp International | Consuting INSPECTION, TEST & PLAI "JABAL OMAR DEVELOPMENT BROJECTLPHISE 17 INSPECTION AND TEST PLAN ZONE S09 WORK SCOPE Plastering Work PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS von | Osseton of Operaioninspecton. Test | Freauenay of Records [Hold or Witness Pit is ond Approval eet Generted REP ROe TERA 1 Shop Drawings and Deas Once Remsved eur | R [Raa 2 ators Submis Once NoiealSubmitas| Sib _R_| RBA 3 Method Statement, Inspection & Test Plan Once MS & ITP ‘Sub R | R&A 4 | Work Noticaton Sia New Actviy Once Aoprovalofwore | Sub™ | R | R&A Note*- All deviation from the approved drawingsidocuments to be recorded and discussed with the Main Consultant prior to proceeding, * Other subcontractor/sub consultant engaged by RCC. "* By RCC PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS Frequency of a | Item | Description of Operation/Inspection, Test and Records Hold, or Witness Point Inspection & Test No. ‘Approval arr Generated Ke [Rec | EHAF By 1 | Matera inspection Loan MIR H | 4 [Raa 2 R 4 [4 | 1a 3 R a [a | a Pre-construction tests (Compressive strength a ii 4 | Test, Water Retention and air Content test) OF ‘Test Report Sub. | R | ReA 5 Pull out Test at 28 days > 5 N/mm2_ Random Test Report ‘Sub. R RBA “Abbreviations: Sub- SUBMIT, H- HOLD, R&A. REVIEW & APPROVE, RC- RANDOM CHECK, I8A- INSPECT & APPROVE, S- 'SURVEILANCE, CL= CHECKLIST, IR- INSPECTION REQUEST, |- INSPECT Revised Inspection and Test Plan Page 3 of | EHAE ep ‘Client: Jabal Omar Dev. PMC: Hill | ‘Main Consultant: Ehat Contractor: RCC | corm International Consulting | INSPECTION, TEST & PLAN: JABAL OMAR DEVELOPMENT PROJECT. PHASE IV INSPECTION AND TEST PLAN ZONE $09) WORK SCOPE Cement based Screed PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS | Item | Descriotion of Operationiinspection, Test | Frequency of Inspection Records Hold, or Witness Point No, and Approval & Test Plan Generated KE_[ ROC | EHAF 7 ee ndbekib. a | Approved 7 A 1 | Shop Drawings and Details Once Cranes | Sub) R&A 2 Materials Submitials ‘Once Material Submittals | Sub R&A 3___| Method Statement, Inspection & Test Plan Once MS & ITP Sub_|R [R&A fere enc Approved 4 Sinvet reference and Boneh Marks: Once Drawings, Control | Sub | R | R&A (drawings) o int 5 Work Notification to Start New Activity Once Approval of work | Sub“ | R | R&A | Note*- All deviation from the approved dravings/documents to be recorded and discussed witht to proceeding, * Other subcontractor/sub consultant engaged by RCC. ** PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS ByRCC fe Main Constant por Frequency of item | Deserption of Operation/inspection, Test and Records | Hold, or iness Point in No. ‘Approval specion & Tea Generated KE_[ ROC | EWAF 1 _ | Nateral inspection peaietetan |__MR n | [Rea era 2 Design Mix ArealSt es/Layout Material Submittals. H H R&A La R a [4 | wa 4 R # | 18a é R 4 | 4 | twa ‘Ona set for 6 | Testing of Screed Compressive Strength ‘90m2, + each TestRepot | sub | H | RaA asom2 Abb L SURVEILANCE, CL= CHECKLIST, IR- INSPECTION REGUEST INSPECT ions, Sub- SUBMIT. H- HOLD, R&A. REVIEW & APPROVE, RO- RANDOM CHECK, IGA- INSPECT & APPROVES. id Inspection and Test Plan Page 4 of 5 Client Jabal Omar Dev. | PMHIT | Main Consutant:€hat’ | Contractor ace | cor | interntionat | Consuting INSPECTION, TEST & PLA JABAL OMAR DEVELOPMENT Peamerruase ht INSPECTION AND TEST PLAN ZONE SOS ‘il Ie WORK SCOPE Interior Painting PART 4- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS _ 'tem | Description of Operation/inspection, Test | Frequency of inspection | Records Hold, or Witness Point wo, and Approval & Test Pian Generated Ke) Reor ee ‘Approved . 1 Shop Drawings and Details Once eae sur | R | R&A 2 Materials Submittals ‘Once Material Submitiais | Sub | R | R&A __3_| Method Statement, Inspection & Test Pian ‘Once MS & ITP Sub [| R | R&A 4 Work Notification to Start New Activity Once ‘Approvalofwork | Sub | R | R&A Note" Ail ceviaion rom the approved crawingsldocuments to be recorded and discussed withthe Main Consutan | proceeding = Other subcontractorsub consultant engaged by RSC. "" By RCC. i prior PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS item | Descrption of Operationtnspaction, Test and | ,,f/2QUaney OF Records Hold, or Witness Point No. Approval ci Generated KET RCO] BHA : By 1._| Materalinspection Re eeeeen MIR a | # | Raa CC : aon By 3._| 1 coat of Putty application onsite AreaisteYenayout | _WinessFom | H | H | RO rs fon on i y 4 _| 2 coatot Paty aplication on site Aeastetenayout | WinessFom | H | H | RC 5 _| Primer Coat for putty protection IR 4H | A | tea 8 _| 1 coat ot aaintansication on site IR 4 [4 | ea 7__| 2 Pf cost of paint appicaton on site R a | 4 | tea “Abbreviations. Sub. SUBMIT, H- HOLD, RBA- REVIEW & APPROVE, RC- RANDOM CHECK, I8A. INSPECT & APPROVE, S- 'SURVEILANCE, CL= CHECKLIST, IR- INSPECTION REQUEST, |- INSPECT “Final is subject to the Consultant Approval Revised Inspection and Test Plan Page Sof

You might also like