Contract No:883 TO: MIS. EHAF Consulting Engineers TRANS. NO: 853-4-204-W042.C-CNI2.RCCECE-TRNSI6II4 | Ruwad Civil Construction (RCC) | DATE: 16-April-16 ATTN: Mr.Hesham El-Gendy (CRE) GIREF: TRN-SI-3087,Rev-00, Code-B IBMITTED FOR: _ ACTION TAKEN: el Rope THE 2) B -Approved as noted, o Review & Comments B “Approved os noid. oO - Approved with Comments, a Revise & Re-submit | | | -E | tavoice | Boarspecitication 1 | other: Sampies {889-4-204-W042-C-CN12-RCC- Revised ITP Inspection Test Plan for 1 A SBT no feo Te OF AE-APFI-E! piastering Work & Block Work (CMU) fe [ As Per Attached 1 soft ‘Received By Recipient Date Tile Copy Distribution (Jabal Omar Development Co Hill International o oa ‘Legends: A- Approved B- Approved As Noted, Incorporate Comments - Approved With Comments, Revise & Resubmit D- Rejected [Re Reviewed As Compliant _S-Reviewed As Noted, incorporate Comments T-Reviewed with comments, Revise & Resubmit N« Noted. Page 1 of 1 ‘Doe /Form No: PSA-883-PP-02-05-FM Rev.0 Revision Date: 29-Sep-10 Hill eerradonal JABAL OMAR DEVELOPMENT PROJECT DOCUMENT SUBMITTAL FORM — CONSTRUCTION CONTRA\ Contract No: 883 Work Package: CN12 TITLE: ITP PLAN SUBMITTAL NO: 883-4-204-W047-C-CN12.RCC-SBT-AO-1920 (TO: _ EHAF Consulting Engineers REV.NO.: Ot | FROM: Ruwad Civil Construction (RCC) DATE: 16-Apri-16 | LATIN: Mr Hesham ElGondy(CRE) ——CORIG.REF:- TRING | IST 0 P00 Pre cstcain CASDS - Shop Drawing Schedule [] SMP - Samples. (COMM - Operating & Maintenance Manuals CISCE - Program / Schedule CO SHD - Shop Drawings (QPP - Quality Plans & Procedures - QQITP - inspection & Test Plan] MUP - Mock Ups & QC Panels. CJINC - Insurance Certificates (CMPD - Product & Materials Data [] TST - Test reports (1 PBW - Bonds, Guarantees, Warranties C1 Method Statement ABD - As Bult Oranings CI OTH- mix Design Oc-civi (1) $-Structural_[J A-Architectural [] E-Electrical []M-Mechanical [] G-General [] O- [] Hinterior | Design []T-Sections [J U-Urban / Master Planning | | Revised ITP Inspection Test Plan for Plastering Work & Block Work (CMU) Ba=cmenueneeias LOCATION / USE STE LB a-approvai L] R-Review & Comments [_]@-As Requested [_] tinformation / Records Only [_] N-Action [_] 0-others ‘Syed Irfanullah Hussainy Submitted By Contractor's Rep: (ee Gente” Geen [OMENS RON SENSE Name: Signature: Date; Sone | Name: Signature: Date: SUES eee eS (Lo A-Approves [_] B -Approves As Notes, Work May [_] C- Approved with Comments, [_] D- Rejected L_] N-Notes Proceed «Incorporate Comments Wiork May Not Proceed, Resubmit wihin-.. Days Revise & Resuimt LAR -Reviewed As Compliant [7] $- Reviewed As Noted, Inco. Comments [] T- Reviewed Wih Comments, Revise / Resutmit CEIVED: DATE RETURNED: SSS SEN ee For & On behalf Name: Mr. Hesham El-Gendy CRE ‘Signature: —_—_ Date: Page tof 1 Doc Form No: PSA-883-PP-02.06.FM Rev2 Revision Date: 15-Mar-2011 |

You might also like