You are on page 1of 11
uJ ‘« , gy a & m0 8 JABAL OMAR DEVELOPMENT PROJECT fay. OT é ES) DOCUMENT TRANSMITTAL FORM (DTF) RCC. _ Contract No:883 Work Package:CN12 | TO: M/S. EHAF Consulting Engineers TRANS. NO: 883-4-704-W04Z-C-CN12-RCC-ECE-TRN-SI-1 14 Ruwad Civil Construction (RCC) | DATE: 16-April-16 Mr.Hesham El-Gendy (CRE) CIREF: TRN-SI-3057,Rev-00, Code-B WE ARE SENDING: —_| SUBMITTED FOR: | ACTION TAKEN: | Bd | Documents | 82 | Approval 1 | s-Approved ; rr “TFB -Approved as noted, C1 Drawings!Sketch Gi Review & comments aa | | Report {LAs Requested “LC Approved with Comments, | Change Order “C2 | Information /Records Only ___| Revise & Re-submit | oO __| [| For Necessary Action I a | oth R-Reviewed as Compliant | | O) [in ae | Boarspecification Qa . Reviewed Other: Samples Attached ry erent comment TT Reviewed with comments, O| Seperate Gover Revise & Re-submit 883-4-204-W04Z-C-CN12-RCC- Revised ITP Inspection Test Plan for 1 7 01 I SBT-A0-1920 16-Apr-16) piastering Work & Block Work (CMU) itil Pee As Per Attached eo 1 Sof Received By Recipient Baie Copy Distribution el8 167 CO Jabal Omar Development Co HilldaternatGhal C7 RECEIVED | 25 APR 2018 | ROG “Legends: A- Approved B- Approved As Noted, Incorporate Commonis C- Approved With Comments, Revise & Resubmit D- Rejected R: Reviewed As Compliant _S-Reviewed As Noted, Incoorate Comments T-Reviewed with comments, Revise & Resubmit N- Noted Page tof DDoc./Ferm No: PSA-883-PP-02.05.FM Revd Revision Date: 20-Sep-10, Hill Intemational JABAL OMAR DEVELOPMENT PROJECT Sapp8.C& DOCUMENT SUBMITTAL FORM — CONSTRUCTION CONTRA‘ % Contract No: 883 Work Package: CN12 ara TITLE: ITP PLAN SUBMITTAL NO: 883-4-204.W04Z-C-CN12-RCC-SBT-AD-1920 (TO: _ EHAF Consulting Engineers REV.NO.: 01 FROM: Ruwad Civil Construction (RCC) DATE: _16-Apri-16 | ATTN: Mr. Hesham El-Gendy (CRE) ORIG. REF: - — TRN-SI-6114 [I instore rap (SDS - shop Drawing Schedule. L] SMP - Samples LOM - operating & Maintenance Manuals (CSCE - Program / Schedule (1 SHD - Shop Drawings Capp - Quality Plans & Procedures - BAIITP. - inspection & Test Plan [] MUP - Mock Ups & QC Panels [INC - Insurance Certificates (CMPD - Product & Materials Data [] TST - Test reports [COPBW - Bonds, Guarantees, Warranties ABD - As Built Drawings: Ci Method Statement OTH. tx design TE Ses eiee estas Oc-civi (1) $-Siructurat_ [J A-Architectural Design C]T-Sectons [J U-Urban / Master Panning | Revised ITP inspection Test Plan for Plastering Work & Block Work (CMU) Recah BIE ‘Syed Irfanullah Hussainy Submitted By Contractor's Rep: et eect Gticen) Signature: Signature: Date: D1 Acrporoves [EB -Arproved As Noted LE Approves with coms Cp-rejectes 1] Proceed - Incorporate Comments ‘Work May Not Proceed, | & Resubmit Within... Days Revise & Resubmit LARReviewed As Compliant [_] S- Reviewed As Noted, Incorp. Comments [_] T- Reviewed With Comments, Revise / Resubmit ke REFER To ComMENTS IN PLASKR IT? nit 6 DATE RECEIVED DATE RETURNED. SUES Nona y For & On behalf \ HO) Name: Mr. Hesham El-Gendy CRE Signature WV \_/ _ Date: a ly Jnol> Page tot Doc Fo No: PSA-289-PP.02-06-M Rev.2 Revision Date: 15-Mar-2011 “ pic ential Omar Dev. | PMC: Hil Corp | tnzernationat ‘Main Consultant: Consulting Ehaf | Contractor: ROC JABAL OMAR DEVELOPMENT PROJECT- PHASE IV ZONE S09, $10 & S11 INSPECTION AND TEST PLAN WORK SCOPE FOR PLASTERING WORK PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS Item | Description of Operation/Inspection, Test Frequency of Inspection Records Hold, or Witness Point Now | and Approval [eee Fast Pan Generstsd—[Siboon [ROO [EF 1 _| Shop Drawings and Dots once Repoves 7 supe | | RAR 2 _| Mateale Submits Once Materal Sutmials|_swb_| R [R&A 3_| Inspection & Test Plan ‘Once iP ‘Sub | R_ [R&A 4 | Work Notfeaton to Sian New Acy once Approval ofwok | sub | R [R&A Note*- All deviation from the approved drawingsidocuments to be recorded and discussed with {0 proceeding, * Other subcontractorisub consultant engaged by RCC. “* By RCC ‘the Main Consultant prior PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS ttem | Description of Operationtnspection, Test and | ,, Frequency of | Records Hold, or Witness Point bad Appr Plan Generated ‘Subcon | RCC | EHAF By MATERIAL INSPECTION 1 _| mareriat inspection ise araed wR n |u| Rea By 2 || FINAL COAT OF PLASTER IR H H 18A TER ArwarStagesLayout NEP RELEASE TOR AIT He | pRe CONSTRUCTION TEST (Compressive By 3! | Test, Water Retention, & Air Content Test] Area/Stages/Layout test Report " u 2: uF By PULLOUTTESTAT2BOAYS> Nm — | pevc Maroy | TestRepon | oH | H | 188 ‘Abbreviations: Sub. SUBMIT, H- HOLD, R&A- REVIEW & APPROVE, RC. RANDOM CHECK I&A- INSPECT & APPROVE, S- SURVEILANCE, CL= CHECKLIST, IR- INSPECTION REQUEST, I- INSPECT L PERPRENTIO / PLASTER Dcceepo8 6S To Be wawesse> Inspection Test Plan Plastering Work ————————— oho | | HAE ep (SEEK Corp International | Consulting Client: Jabal Omar Dev. PMC: Hill Main Consultant: Ehaf_| Contractor: RCC | JABAL OMAR DEVELOPMENT PROJECT- PHASE IV ! eT XT PLAN ZONE $09, $10 & S11 WORK SCOPE BLOCK WORK (CMU) PART 4- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS } tem | Description of Operation/Inspection, Test | Frequency of Inspection Records | Hold, or Witness Point No._| and Approval Test Plan Genereted _[Subson [ROG [ EHAF Approved . 1._| shop Drawings and Detais Ones fpmoved | sue | R | Raa 2 | Materials Submitais Once Wateral Suomitiae | Sub | R | R&A 3_| Inspection & Test Pian Once: TTP Sub | R_[ RA 4 _| Work Notfcaton to Start New Activity Once Approval ofwork | Sus | R | R&A Note Al deviation om the approved dawingaldocuments tobe recorded and discussed with the Main Consultant prior to proceeding, * Other subcontracorsub consultant engaged by RCC." By RCC PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS ttem | Description of Operationiinspection, Test and |, ,areauency of Records Hold, or Witness Point inspection & Test No. ‘Approval ous Generated Subcon | RCC | EHAF By MATERIAL INSPECTION 1 | MATERIAL INSPECTION healietietacea mir 4 | H | Raa 8y 2 | MORTAR MIX réafSxagysicajout VISUAL 4 H | 18a SURFACE PREPARATION. LAYOUT AND | 5 ‘SETTINGOUT FOR FISRT LAYER-CMU 3 TINGOUT FOR FISRT LAYER-CMU ene eee R H ja} os LINTEL REINFORCEMENT AND POURING 8y | COORDINATION WITH MEP & STRUCTURAL —_Area/Stages/Layout en " Ha by FULL HEIGHT MASONRY INSPECTION 5 | BULL HEIGHT MASONRY INSPECTH | marsugbt aya IR HoH | tea ‘Abbreviations: Sub- SUBMIT, H- HOLD, R&A. REVIEW & APPROVE, RC- RANDOM CHECK, I8A- INSPECT & APPROVE, S- SURVEILANCE, CL= CHECKLIST, IR- INSPECTION REQUEST. INSPECT c lock Work ( DOCUMENT TRANSMITTAL FORM (DYF) Contract No:883 Work Package:cNig 5 TO: MIS. EHAF Consulting Engineers TRANS. NO: 883.4.204-Woaz.c-oN12.RO FROM: Ruwad Civil Construction (RCC) DATE: 30-May-2015 ATTN: Mr-Hesham El-Gendy (CRE) CIREF: ____WE ARE SENDING: | SUBMITTED FOR: _ACTION TAKEN: | BB | Documents "Aoproval Ta -approves proved as noted, 1 Srawingsistten DF eview & Comments fee ccs Contras | Report C1 As Requested | C1) ©-Approved with Comments, change order o | | Revise & Re-submit totter ol C1) D- Rejected O tnvoiee oO oO | BoaiSeeciteton RI $ Cor Lidl fnsonsbeenaae zt [eee Z d saat T- Reviewed with comments, = | Revise & Re-submit Revised inspection and testing plan (ITP) {or Biock, Plaster, screed, Paint work [| as emacs ise Sencer Name: _ Syed Irfanullah Hussainy a Designation: (Chief Operating Officer) by Sender Received By Recipient Date Tite Copy Distribution (Jabal Omar Development Co 5 Hill International ao Page 1 oft oc Form No: PSA-B83-PP-02-05-FM Rev.0 B Revision Date: 20-509. 10 DOCUMENT SUBMITTAL FORM — CONSTRUCTION CONTRACTORS Contract No: 883 Work Package: CN12 TITLE: Technical Submittal SUBMITTAL NO: 883-4-704.W047.C-CN12-RCC-SBI-A0-1820 TO: EHAF Consulting Engineers REV.NO: 00 FROM: Ruwad Civil Construction (RCC) DATE: 30-May-15 ATTN: Mr. Hesham El-Gendy (CRE) ORIG. REF: - _ TRN-SI-3057 RESET CIP QD - Pre-cuaitication OISDS- shop Drawing Schedule [] SMP - Samples TLOMM - operating & Maintenence Manuals QISCE Program, Schedule) SHD ~ Shop Drawings Darr. Quality Plans & Procedures - BAITP inspection & Test Plan CIMUP ‘Nock Ups 8 OC Panels JING - Insurance Certificates CMPD - Product & Materials Data C] TST - Test reports CIPBW- Bonds, Guarantees, Warranties |_| CLABD - As Buitt Drawings | Ci method Statement Hom. STEW ST Sense ssonieuten De-cui O)S-structurat Bl A-Architectural C)E-Electical CIM-Mechorical [] G-General [1] 0-Coordination OlFinterir Design] T-Sectons ] U-Urban / Master Planning Revised inspection and testing plan (ITP) for Block, Plaster, screed, Paint work Bisco were eS SU Dx) A-rvproval [] R-Review & Comments, [_]a.As Requested [_] information / Records Only] N-Action looters: Syed Irfanullah Hussainy : (Chiet Operating Oficer) Sinaie Page tof Doe Form No: PSA-883-PP.02.06 FM Rev.2 Revision Date: 15.Mar2011__| a Hale LIAL 1 F.C Client: Jabal Omar De PRC: il Main Consultant Ehaf national Consulting INSPECTION, TEST & PLAN: NRO RASC INSPECTION AND TEST PLAN ___ ZONE $08 [ te — WORK SCOPE ql Block Works PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS. DescrptonetOpsatoninapesin Text | Freuaryctispecion | Recor | Hk or Wines Po and Approval Seat Plan | Genetaled [KET RCS TERAF ___ Shop Drawings and Details Aaproved . Shop bigs and tals | Once fered | ow | [Ral L Materials Submitals Once [Material Submitais | Sub | R | R&A Method Statement, inspection & Test Plan Once ‘MS & ITP ‘Sub R_| R&A) Survey reference and Bench Marks cored a | (erawings) Once Drawings, Conic) Sub" | | RBA Work Notfeaton to Star New Acuity Once Aeprovalofwok | sam | _R [REA | to proceeding * Other subcontractor/sub consultant engaged by RCC. *= By RCC | Note All deviation ram the approved arawinga/docurenis tobe recorded and discussed wih the Main Consultant por PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS Description of Operaontnspecton,Testand | ,,ffeaveney ef | Records | Hole or Witness Point ‘Approval on enemies |e] Ree | Ear Material Inspection AvoalSt By asi MIR HH [RBA fortar mix. By is Mer ae i Val [els mw | wee ‘it ang upto Lrtel hired Beam 3; | Level block work ‘Area/StagesiLayout | _“W/tness Form He SUSIE Re ea fw | Fullign ot Mason inspection | praise danayon ® 6 || ae Testing of Grout mataral Compressive Stengyt | RandomTest | TestRepor | aw | | S| | Testing of Blocks for Compressive Strang Every 464 sqm TestRepot =| sub | H | s | | ‘Abbreviations. Sub- SUBIAT, He APPROVE, S- SURVEILANC! ILO, RBA. REVIEW & APPROVE, RC. RANDOM CHECK, IBA. INSPECT & ‘CHECKLIST. IR- INSPECTION REQUEST, |. INSPECT WITHACCEFORIES RU SEALANT Log Te KESUBMITED Revised Inspection and Test Plan Page lof 5 Corp INSPECTION, TEST & PLAN: JABAL OMAR DEVELOPMENT | PROJECT- PHASE IV _ZONE $09 | WORK SCOPE LHL @ INSPECTION AND TEST PLAN Cutting the Services opening in CMU Masonry Block Wall [PART 4- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS tem | Description of Operation/Inspection, Test | Frequency of inspection | Records Hold, or Witness Point 2 Method Statement, Inspection & Test Plan Once MS&ITP ‘Sub R_ [R&A | lectrical anc frawir ‘Approved [3 | eecstonneaanalser somo | gna Patio. fants fons acl mm + | “Wes Notion anew dey | ns etter Poa pean] Note’ All deviation from the approved drawings/documents fo be recorded and discussed with the Main to proceeding, * Other subcontractor/sub consultant engaged by RCC.“ By RCC ‘Consultant prior PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS Frequency of | Abbreviations: Sub- SUBMIT, H- HOLD, RBA- REVIEW & APPROVE, RC- RANDOM CHECK IBA-INSPECT 8 APPROVE, §- SURVEILANCE, CL= CHECKLIST, IR. INSPECTION REQUEST. INSPECT Revised Inspection and Test Plan | Page 20fS | 2m | Description of Operation/inspection, Test and Records Hole, or Witness Point No. ‘Approval ane Tes Generated KE | RCC | EHAF =, vane | SSE | alu | |e fale | PMG: Hil INSPECTION, TEST & PLAN: ~~ JABAL OMAR DEVELOPMENT PROJECT- PHASE IV ZONE S09 WORK SCOPE PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS ] INSPECTION AND TEST PLAN | -Plaste g Work Hold, or Witness Point en | Description of Operatonnspeston, Tet | Frequeny of inspection | Records je" | order ees Pan Gererted [eT RCE ERA 1) __ShopDrawgsandDetis nee ese [sur |e [Raa | Materials Subtle Once Matera Submis | Sub | R | RAA 3_| Wetied Siaterent.Inspecion& Test Pan One sei [sw || RAA 1 [Wot Noten Sat New cy one Topentatwon | a | RT RAA ‘Note’. All deviation from the approved drawings/documents to be recorded and discussed with the Main Consultant prior to proceeding. * Other subcontractor/sub consultant engaged by RCC. ~* By RCC PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS: sumiec 'tem | Desenption of Operaton/nspection, Test and ] ,,rrequency 0 Records Hold, or Witness Point No. | ‘Approval eee Generated KE [ROC | EHAF Inst jon by | a = =e 7 " [es | 3_| Final coat of plaster application R H H | I8A fe Test, Water Retention and Air Content test) gd ‘Test Report S, £ Rass a iLL LAL Jabal Omar De PMC Hi corp International Consulting INSPECTION, TEST & PLAN: "JABAL OMAR DEVELOPMENT | OC INSPECTION AND TEST PLAN L ___ ZONE Sos Fe a HEC eee a z| { __WORK SCOPE _ | Cement based Screed PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS Item | Description of Operation/Inspection, Test | Frequency ofinspection | Records Hold, or Witness Point No. and Approval ‘8 Test Plan Generated KE RCC EMAF| i rawings and Detaits nce [<-> Aperowed ub" | 1 ‘Shop Drawings and Details Or | Drawings ‘Sub* R RBA | 2 z Materials Submittals _| Once | Material Submittals | Sub R [RBA ‘Survey reference and Bench Marks a eons ei cers | os footer | w fat PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS. i Frequency of) Hold, or Witness Point tiem Description of Operation/Inspection, Test and | Records told, of Witness: | prove! | impeaton Test | pcraeg aa 1 _ | Matra napeaten watinlatwoa |__wR ww [RaA 2 Design Mix Area/St out | Material Submittals H H REA : eens eet | [elo 4 _| Inspection for Screed Pouring IR H H | IBA 5 _| Final Inspection after Soreed Pouring R H HH IBA 460m2 1 Revised Inspection and Test Plan Page 4 ofS INSPECTION, TEST & PLAN: JABAL OMAR DEVELOPMENT — INSPECTION AND TEST PLAN PROJECT. PHASE IV ZONE S09 jo _| it WORK SCOPE I Interior Painting dt APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS: tjem | Description of Operationfnspection, Test. | Frequency of nspecton | Records Hold, or Witness Point xe and Approval ‘ATestPian | Generated KE [RCC | EHAF | i = Approved a a ‘Shop Drawings and Detais or nied st RA Zi Materials Submittals Once Material Submitals | Sub RaA 3_| Method Statement. Inspection & Test Pian Once MS-& ITP Sub) R | REA 4 | ___ Work Notficaton to Stat New Activity ‘Once Approvalofwork | Su | R | REA ~ | Note All deviation rom the approves drawingsidocuments i be recorded and discussed withthe Main Consultant prior to proceeding. * Other subcontactovisub consultant engaged by RCC. ** By RCC a L PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS lem | Description of Operationnspecton Test and | ,Freauency of | Records _|_Hold. or Witness Point Lx | Approval | Plan Generated Ke [RCO | EHAF | i . 1 By + | Matera inspection eee MIR H | H | Raa 3 eas R HO) A | tea | 3] 1% coat of Putty appication on site AveaStetanayou | WinessFom | H | H | RC | a ey 4 | 2 coator Putty appicaton on ste Arearstershayou | _Winessrom | H | H | RC 5 _| Primer Coat for putty protection Rr 4 H | 18a 6 R 4 H | IBA 7_| 2%. ial coat of pant appkcation on site R 4H | tea ‘Abbreviations Sub SUBMIT, Hc HOLD, R&A. REVIEW & APPROVE, RC. RANDOW CHECK, IBA INSPECT & APPROVE, S- SURVEILANCE, CL> CHECKLIST, IR: INSPECTION REQUEST, | INSPECT “Final is subject to the Consultant Approval Revised Inspection and Test Plan Page S ofS

You might also like