You are on page 1of 2
DOCUMENT Contract No:883 | TO: M/S. EHAF Consulting Engineers ATTN: Mr. Hesham El-Gendy (CRE) | | FROM: Ruwad Civil Construction (RCC) | DATE: 16-Apri-16 TRANSMITTAL FORM (DTF) Work Package:CN12 TRANS. NO: 883-4-204-W042-C-CN12-RCC-ECE-TRN-SI-6114 | Revise & Re-submit “D-Rejected Ae Noted Reviewed as Compliant sean TIS: Reviewed as Noted, i finches. 4 Incorporate comments T Reviewed with comment, C1 serrate cover fevee Rosubrst ‘883-4-204-W04Z-C-ON12-RCC- SBT-A0-1920 Revised ITP inspection Test Plan for Plastering Work & Block Work (CMU) 01 |16-Aprit-16| 2 Hard I : : As Per Attached 1 Sot Received By Recipiont Copy Distribution O Jabal Omar Development Co “Legends: A- Approved B- Approved As Noted, Incorporate Cor Rejacied Ri Reviewed As Complant_$-Reviewed As Noted, Incorporate Comments T-Reviewed wih comments; Revise & Rescbeot. Ne Nese Date Bi Hill international — er PY receWven 7 APR 2315 =f 4 la 4 Hiti internation’ JOD Project > "C= Approved With Comments, Revise & Resibmit D. (Doc.JForm No: PSA-683-PP-02-05-FM Rev.0 Page tof Revision Date: 26-Sep-10 DOCUMENT SUBMITTAL FORM ~ CONSTRUCTION CONTRA Contract No: 883 Work Package: CN12 TITLE: ITP PLAN SUBMITTAL NO: 883.4.204-w042. 2-ROC-S | TO: _EHAF Consulting Engineers REV.NO. 01 FROM: Ruwad Civil Construction (RCC) DATE: _16-Apri-16 ORIG. REF: = TRN-S-6114_ C1Pap - Pre-duaiification j hop Drawing Schedule] SMP - Sempies TOM - operating & Maintenance Manuals CISCE Program schedule] SHD — Shop Drawings Garr - Quality Plans & Procedures - QRITP. - inspection & Test Plan COMUP - Mock Ups & ac Panels OIUNC - insurance Certificates COMP - Product & Materials Data [] TST - Test reports (C1PBW- Bonds, Guarantees, Warranties Ll Method Statement (ABD - As But Drawings CLOTH. Mix Design SEE gene Pon OC-cWil [7 S-Siructurat BQ A-Architectural DJ E-Electrical [M-Mechanical [] G-General -} 0- ] Finterior Design —[] T-Sections [1] U-Urban / Master Planning Revised ITP Inspection Test Plan for Plastering Work & Block Work (CMU) Beans LOCATION / USE SIEM ‘Submitted By Contractor's Rep.: ae ooae Hussar NS TERT SEE ae Name: Signature: Seen) Name: Signature: SUPSAVSI ey EO NES DA -serves []8 Approved As nota Wor tay L_] C- Approved wih Comment, LD Rejectes [J Noted Proceed - Incorporate Comments Work Nay Not Proceed, & Resubmit Within... Daye Revise & Resubmit AR Reviewed As compliant [] S- Reviewed As Noted, corp, Comments [_] T- Reviewed With Comm Revise / Resubmit DATE RECEIVED: STIS aU For & On behalf Name: Mr. Hesham El-Gendy CRE DATE RETURNED. Es Signature: Date: Page tof Doe JForm No: PSA-883-PP-02.06-FM Rev 2 Revision Date: 15:Mar-2011

You might also like