Kelle Carpet and Trim installs carpet in commercial offices. Peter Kelle has been very concerned
with the amount of time it took to complete several recent jobs. Some of his workers are very
unreliable. A list of activities and their optimistic completion time, the most likely completion time, Continue to post
and the pessimistic completion time (all in days) for a new contract are given in the following
20 questions remaining
table:
TIME (DAYS)
Snap a photo from you
phone to post a questio
ACTIVITY a m b IMMEDIATE PREDECESSOR(S) We'll send you a one-tim
download link
A 3 6 8 —
888-888-8888 Text
By providing your phone number, you agre
B 2 4 4 — a one-time automated text message with a
the app. Standard messaging rates may ap
C 1 2 3 —
My Textbook Solutions
D 6 7 8 C
E 2 4 6 B, D
H 3 6 9 F
Chegg tutors who can
right now
I 10 11 12 G
Maria
MSU-IIT
J 14 16 20 C
Brian
K 2 8 10 H,I Brown University
a) Determine the expected completion time and variance for each activity. Hardik
Punjabi University
b) Determine the total project completion time and the critical path for the project. Find me a tutor
c) Determine ES, EF, LS, LF, and slack for each activity.
d) What is the probability that Kelle Carpet and Trim will finish the project in 40 days or less?
Step-by-step solution
https://www.chegg.com/homework-help/kelle-carpet-trim-installs-carpet-commercial-offices-peter-k-chapter-3-problem-14p-solution-97801328633… 1/5
9/19/2020 Solved: Kelle Carpet and Trim installs carpet in commercial off... | Chegg.com
NEW!
Textbook Solutions Expert Q&A Study Pack Practice
Step 1 of 6
Consider the following data showing the activities involved in a project along with its optimistic,
most likely, and pessimistic completion time.
Comment
Step 2 of 6
a.
Calculate the expected completion time and variance for each activity using given
formulas:
…… (1)
…… (2)
Where ‘a’ is the optimistic time estimate, ‘m’ is the most likely time estimate and ‘b’ is the
pessimistic time estimate.
Comments (1)
https://www.chegg.com/homework-help/kelle-carpet-trim-installs-carpet-commercial-offices-peter-k-chapter-3-problem-14p-solution-97801328633… 2/5
9/19/2020 Solved: Kelle Carpet and Trim installs carpet in commercial off... | Chegg.com
Step 3 of 6
NEW!
Textbook Solutions Expert Q&A Study Pack Practice
b.
Initially prepare a network diagram using the mentioned data. The network diagram is
shown below:
Comment
Step 4 of 6
Calculate the length of each path by adding the expected time required for completion of each
activity present in a path. Calcualtiosn are shown below:
2+7+4+10+6+7.33 36.33*
C+D+E+F+H+K A+F+H+K
5.83+10+6+7.33 29.17
A+G+I+K
5.83+2.17+11+7.33 26.33
B+E+F+H+K
3.67+4+10+6+7.33 31
B+E+G+I+K
3.67+4+2.17+11+7.33 28.17
C+D+E+G+I+K
2+7+4+2.17+11+7.33 33.5
C-J
2+16.33 18.33
The path that takes the longest duration is called the critical path. The duration of this path is
called the project duration. Hence, the critical path is
Comment
Step 5 of 6
c.
ES and EF are calculated from the left side of a network diagram and proceeds towards the right
side.
ES of beginning activity = 0
LS and LF are calculated from the right side of a network diagram and proceeds towards the left
side.
LS = LF – activity time
ST = LS-ES
https://www.chegg.com/homework-help/kelle-carpet-trim-installs-carpet-commercial-offices-peter-k-chapter-3-problem-14p-solution-97801328633… 3/5
9/19/2020 Solved: Kelle Carpet and Trim installs carpet in commercial off... | Chegg.com
The ES, EF, LS, LF and Slack time of the activities present on the critical path are given below:
NEW!
Textbook Solutions Expert Q&A Study Pack Practice
Hence, the ES, EF, LS, LF, and slack of each activity present in the project are determined.
Activities having 0 slack is considered to be present in the critical path.
Comments (2)
Step 6 of 6
d.
Calculate the acitivity variance along critical path by adding the variance of each activity present
in the path.
Variance =
= 5.22
Determine the probability of completion of the project on or before week 40 days as shown
below:
Calculate the standard deviation of the critical path using given formula:
Initially calculate the z value for given data using given formula:
Now, determine the probability for given z value using =NORMSDIST (1.61) formula in excel
sheet. The probability comes out to be 0.9463 or 95% (approximately). Thus, the probability of
completion of the project on or before week 40 is 95%.
Please note that values might differ due to rounded figures taken in calculations.
Comment
https://www.chegg.com/homework-help/kelle-carpet-trim-installs-carpet-commercial-offices-peter-k-chapter-3-problem-14p-solution-97801328633… 4/5
9/19/2020 Solved: Kelle Carpet and Trim installs carpet in commercial off... | Chegg.com
NEW!
Textbook Solutions Expert Q&A Study Pack Practice
ABOUT CHEGG
CHEGG NETWORK
CUSTOMER SERVICE
https://www.chegg.com/homework-help/kelle-carpet-trim-installs-carpet-commercial-offices-peter-k-chapter-3-problem-14p-solution-97801328633… 5/5