Admin Manhours Estmation Template

Enter values at Green Colour

Proj Name T5296-Engineering Service- Flare package-IOCL Baruani


Date 31-Dec-20
Sl no Qty of Description

1 Duration in Months 6
2 Hrs per month 90
3 Noof shifts per day 1
T5296-Engineering Service- Flare package-IOCL
Baruani

Document Title Date 31/Dec/20

Document No Rev No 1

Activity / Document Description Total Man hours

PDMS Administration and team support 585

Total Manpower Required 0.50


T
Discipline: PIPING
Document Title: Manpower Loading Chart
Document No:

Detail Engineering in M
SL NO. Man-Power
M1 M2 M3 M4 M5 M6

1 PDMS Administrator 0.5 0.5 0.5 0.5 0.5 0.5

2 SP PID Administrator

SP Instrumentation
3
Administrator

TOTAL 0.5 0.5 0.5 0.5 0.5 0.5


T5296-Engineering Service- Flare package-IOCL Baruani

Detail Engineering in Months Follow up Engineering Servi

M7 M8 M9 M10 M11 M12 M13 M14 M5 M6

0 0 0 0 0 0 0 0 0 0
Date: 31/Dec/20
Revision No.: 1

ow up Engineering Services As-built in Months


TOTAL Remarks
M7 M8 M-1 M-2

0 0 0 0 3
Discipline: PIPING

Document Title: Software & Hardware Estimation

Document No:

Det
SL NO. SOFTWARE / HARDWARE Software Version
M1 M2 M3 M4

1 AutoCAD

2 HYSYS

3 FLARENET

4 OLGA

5 PHAST

6 FLARESIM

7 PIPENET

8 PDMS 0.5 0.5 0.5 0.5

9 CAESAR

10 MDS

11 PV ELITE

12 SACS

13 GRLWEAP

14 ETAP

15 AGI32

16 SP P&ID

17 SP INSTRUMENTATION
18 NAVISWORK MANAGE 0.5 0.5 0.5 0.5

19 NAVISWORKS SIMULATE

SQL SERVER FOR SP-PID ,


20
SP-INST
T5296-Engineering Service- Flare package-IOCL Baruani

Detail Engineering in Months

M5 M6 M7 M8 M9 M10 M11 M12 M13 M14

0.5 0.5
0.5 0.5
ni

Date: 12/31/2020

Revision No.: 1

Follow up Engineering Services As-built in Months


TOTAL
M5 M6 M7 M8 M-1 M-2

0.25 3.25

0
0.25 3.25

0
Remarks