A SCC1500D Crawler Crane Series
Basic Dimensions of the Whole Machine
03
04
Main Technical Features 05
Main Performance Data 06
Transport Dimensions 07
Assembly Diagram 11
B Specifications
Superworks
14
15
SCC1500D
Lowerworks 18
Operation Devices 19
Safety Devices 20
C Operating Combination
Table of Main Mechanism Data
26
24
Operating Condition Combination 25
HL Operating Condition of Light-duty Boom 26
LJ Operating Condition of Luffing Jib 31
H Operating Condition of Heavy-duty Boom 37
FJ Operating Condition of Fixed Jib 39
A
04 Basic Dimensions of the Whole Machine
05 Main Technical Features
06 Main Performance Data
07 Transport Dimensions
11 Assembly Diagram
A SCC1500D crawler crane
Basic Dimensions of the Whole Machine
4 SCC1500D
SCC1500D crawler crane
Main Technical Features A
1. Safety control system: The two operating 6. Efficient self assembly and disassembly
modes of working and installation are convenient technology: The whole machine can be assembled
and reliable; the crane is equipped with the functions and disassembled by itself, and the assembly
of real-time display of levelness, off-line stop action, of basic machine only requires 3h; the patented
emergency electric control, lightning protection, synchronic control technology of one-key lifted mast
automatic traveling direction adjustment, CCTV has independent intellectual property right;
monitoring, etc., and the safety and monitoring
7. Optimized transportation scheme: The
devices are complete;
transportation width of basic machine is only 3m,
2. Outstanding operating performance: Load with a transportation weight of 41t, so it can be
sensing, limit load adjustment and electro-hydraulic transported around the world without limitation;
proportion dead slow control offer the perfect inching
8. Large-chassis design: The chassis designed
performance of actions, and more stable operation;
with 6m gauge ensures excellent operation stability
3. Reliable function assurance: The designed within 360° slewing range;
safety margin of structures and members are
9. Automatic traveling direction: The crane may
A
sufficient; the control system can operate stably
travel forward through automatic adjustment after
under the harsh environments like extreme cold,
slewing 180o;
high temperature, plateau or sand wind
10. Fuel heater (optional): Start the crane under
4. Convenient maintenance technology: the
low temperature in extremely cold areas;
adjustment access time of a position is no more
than 10min/person, that of a position requiring 11. Two-stage filter of engine: Enable the use of
daily care is no more than 30min/person, and the home-made diesel engine;
maximum maintenance access time is no more 12. Detection switch for on/off state of butterfly
than 2h/person. The machine is equipped with GPS valve: it is used for preventing the main pump from
remote monitoring system to facilitate maintenance being sucked off and facilitating maintenance;
and management of equipment; standard light-duty
13. 100% load travel: Powerful tracking force and
non-metal anti-slipping pedals are equipped on all
travel smoothness bring the advantages of crawler
arm supports to make installation easier;
crane into full play;
5. Powerful lifting capacity: The maximum lifting
14. Broad adaptability: Meet certification
capacity of boom is 112.5t×8m=900t.m, and the
requirements of CE, North America, Australia,
fully extended boom is 52m; the maximum lifting
Russia and Taiwan; the engine emission complies
capacity of luffing jib is 45.7t×12m =548.4t.m,
with the European and U.S. Non-highway Stage 3
and the fully extended boom support combination
Standards.
is 53m+52m; it has 7 operating condition
combinations;
SCC1500D 5
A SCC1500D crawler crane
Main Performance Data
6 SCC1500D
SCC1500D crawler crane
Transport Dimensions A
Transport Dimensions
3.20m
Width 3.00m
Height 3.20m
Weight 41t 10.13m
Crawler assembly x2
Length 8.22m
1.29m
Width 1.46m
Height 1.29m 8.22m
Weight 20t
Boom tip ×1
Length 10.91m
2.35m
Width 2.21m
Height 2.35m 10.91m A
Weight 2.4t
Boom base ×1
Length 8.07m
2.91m
Width 2.23m
Height 2.91m
Weight 4.4t 8.07m
Boom base (including winch) x1
Length 8.07m
2.91m
Width 2.23m
Height 2.91m
Weight 6.3t
8.07m
3m boom insert ×1
Length 3.13m
2.01m
Width 2.23m
Height 2.01m
Weight 0.67t 3.13m
6m boom insert ×2
Length 6.14m
2.01m
Width 2.30m
Height 2.01m
Weight 1.1t 6.14m
SCC1500D 7
A SCC1500D crawler crane
Transport Dimensions
Transport Dimensions
2.01m
Width 2.30m
12.14m
Height 2.01m
Weight 1.8t
Transitional boom ×1
2.55m
Length 6.13m
Width 2.23m
Height 2.55m 6.13m
Weight 1.3t
Fixed jib tip ×1
1.17m
Length 5.41m
Width 1.01m
Height 1.17m 5.41m
A Weight 0.32t
Fixed jib base ×1
Length 5.11m
0.83m
Width 1.03m
Height 0.83m 5.11m
Weight 0.28t
3m fixed jib insert ×1
Length 3.08m
0.83m
Width 1.01m
Height 0.83m
Weight 0.13t 3.08m
6m fixed jib insert ×3
Length 6.08m
Width 1.01m
0.83m
Height 0.83m
Weight 0.30t 6.08m
Extension arm x1
Length 2.15m
Width 1.04m
1.04m
1.12m
Height 1.12m
Weight 0.32 t 2.05m
8 SCC1500D
SCC1500D crawler crane
Transport Dimensions A
Transport Dimensions
1.14m
Width 1.14m
Height 0.21m 5.44m
Weight 0.58t
Tower condition combination x1
Length 10.81m
2.87m
Width 1.79m
Height 2.87m
Weight 6.7t 10.81m
14.2m
Height 1.42m A
Weight 1.4t 7.02m
6m luffing jib insert ×2
Length 6.11m
1.36m
Width 1.56m
Height 1.36m
6.11m
Weight 0.55t
12 m luffing jib insert ×2
Length 12.08m
1.36m
Width 1.56m
12.08m
Height 1.36m
Weight 1.3t
Counterweight tray ×1
1.84m
Length 4.58m
Width 1.84m
Height 0.62m
4.58m 0.62m
Weight 12t
6t counterweight ×6
Length 1.60m
1.19m
Width 1.19m
Height 0.69m
Weight 6.0t 1.60m 0.69m
SCC1500D 9
A SCC1500D crawler crane
Transport Dimensions
Transport Dimensions
3t counterweight ×2
Length 1.60m
Width 1.19m
1.19m
Height 0.29m
Weight 3.0t
1.60m 0.29m
Central counterweight x2
Length 3.95m
1.29m
Width 1.29m
Height 0.79m
Weight 8.0t 3.95m
150t lifting hook x1
Length 0.89m
2.23m
Width 1.03m
Height 2.23m
1.03m 0.89m
Weight 2.57t
100t lifting hook x1
A Length 0.89m
2.17m
Width 0.81m
Height 2.17m
Weight 1.84t
0.81m 0.89m
50t lifting hook x1
Length 0.89m m
1.97m
Width 0.46m
Height 1.97m
Weight 0.96t
0.46m 0.89m
25t lifting hook x1
Length 0.89m
Width 0.36m
1.8m
Height 1.80m
Weight 0.75 t
13.5t lifting hook x1 0.36m 0.89m
Length 0.47m
Width 0.47m
0.93m
Height 0.93m
Weight 0.52 t
0.47m 0.47m
Notes:
(1) The transport dimensions of the parts are marked
on schematic diagrams, but not drawn by scale; the
dimensions indicated are the design values excluding
package.
(2) The weight is the designed value and there may be a
weight error of ±2% due to the manufacturing error.
10 SCC1500D
SCC1500D crawler crane
Assembly Diagram B
Assembly Diagram
The crane is provided with functions of self-assembly/disassembly, e.g. crawler traveling tracks, central counterweight,
rear counterweight of basic machine (optional) and base can all be self-assembled/disassembled. In the process of
assembly, the crawler traveling tracks shall be first assembled, then central counterweight, rear counterweight of basic
machine and base. Reverse the order in the process of disassembly, and see the figure below for specific operation
process (as for disassembly, reverse the procedure).
Assembly of crawler
Step 1 Unloading
B
Assembly of counterweight
Step 1 Assemble central counterweight Step 2 Assemble rear counterweight of basic machine
SCC1500D 11
B SCC1500D crawler crane
Assembly Diagram
Assembly Diagram
12 SCC1500D
SCC1500D crawler crane
Assembly Diagram B
Assembly Diagram
Assembly of crawler
SCC1500D 13
B
B SCC1500D crawler crane
Superworks 15
Lowerworks 18
Operation Devices 19
Safety Devices 20
14 SCC1500D
SCC1500D crawler crane
Specifications B
Superworks
SCC1500D 15
B SCC1500D crawler crane
Specifications
16 SCC1500D
SCC1500D crawler crane
Specifications B
Four head lights provide illumination for far and near handles on the left armrest box. To the right front
distances. of seat is the auxiliary control box, on the control
panel of which all switches are operated manually to
Large glass window with rearview mirror makes the
realize corresponding functions.
field of vision broader.
The operation of traveling pedal (control lever)
Armrest box may be adjusted forward and
has the function of automatic direction adjustment,
backward with the seat, comfortable to operate,
that is, the operation direction is always the front
and it complies with ergonomic principle in a more
direction of the operator.
desirable way.
The driver’s cab can be adjusted according to the
operating needs, capable of realizing 20° pitching
upward or downward, and it can be rotated to the
right front of platform.
The pitching cab broadens the operation vision of B
the driver, thus improving the safety in operation; it
can be rotated and thus reduces the transportation
width.
■ Control Operation
All actions of the crawler travel unit are controlled by
the traveling pedal (control lever). The left traveling
pedal (control lever) drives the left crawler while
the right traveling pedal (control lever) drives the
right crawler. The engine speed is controlled by the
foot throttle or hand throttle and the start switch
is located on the right armrest box. The control
handles of main luffing and main winch are located
on the right armrest box while the control handles
of auxiliary winch, auxiliary luffing/slewing control
SCC1500D 17
B SCC1500D crawler crane
Lowerworks
Lowerworks
■ Crawler Travel Unit The large chassis design obviously improves the
All crawler frames are equipped with independent stability of the whole machine.
traveling drive. The hydraulic traveling motor Counterweights of lowerworks weigh 16t, 8t
drives planet gear reducer to achieve independent respectively at the front and back, and they can be
traveling through the transmission of the driving self assembled/disassembled.
wheel.
■ Travel Speed
■ Travel Brake
Low speed: 0.6 km/h
The travel brake is a disk brake normally engaged in
High speed: 1.2 km/h
the reducer, that is, the brake is in the braking state
when the operation pedal valve is not pushed down;
and it is capable of automatic compensation, free
B of adjustment. When the operation pedal valve is
pushed down, the brake will be released to realize
traveling.
■ Crawler Shoe
The crawler units at the left and right have 112
crawler shoes totally, each 1,100mm wide. The
tensity of crawler shoe can be adjusted via the
hydraulic jack, and an ideal tensity can be achieved
through adjusting the position of adjusting gasket.
■ Base
The hydraulic cylinder drives the power pin to
connect with crawler frame, easy for assembly and
disassembly. A frame structure welded with high-
strength steel
is connected with the crawler frame by hydraulic
power pin under the control of remote wired
controller, safe, convenient and reliable.
18 SCC1500D
SCC1500D crawler crane
Operation Device B
Operation Device
SCC1500D 19
B SCC1500D crawler crane
Safety Devices
Safety Devices
■ Load Moment Limiter While under the operating mode, all these safety
devices are functioning.
As an independent safety operation system
controlled by computer, the load moment limiter may ■ One-key Lifted Main and Auxiliary Luffing
automatically detect the weight hoisted by the crane, Masts
operating radius and angle of boom, and compare The main and auxiliary luffing masts are lifted and
the rated loading capacity with the actual load, dropped in synchronization with the rolling-out and
operating radius and angle of lifting arm; In normal rolling-in of main and auxiliary luffing winches.
operation, it may automatically judge the direction of
■ Boom Limit Device
dangerous action of the crane in an intelligent way,
and may also record the information on overload as Under different operating condition, the operation of
it is equipped with a black box. Main components: crane boom or jib is controlled within the safe angle
display, host box, angle sensor, and force sensor. through mechanical limit detection and detection of
arm support angle signal of the load limiter.
B ■ Tri-color Load Alarming Light
■ Boom Back-stop Device
It may basically give indication in correspondence to
the load progress bar of the display for load moment The boom back-stop support is made of steel pipe
limiter, reflecting the load safety situation of hoisting to prevent the boom from tipping back with the
tools. support from spring compression.
■ Over Hoist Limit Device for Main and Auxiliary The rear mast of luffing jib is equipped with a pair of
Hooks cylinder back-stop devices capable of automatic oil
When the lifting hook is elevated to the upper height supplementation to prevent the mast from leaning
limit, an alarm will be given and meanwhile, the back and to tighten the mast draw plate.
lifting action of the lifting hook will be shut off. When the jib and boom extension form an included
■ Over Roll-out Limit Device for Main and angle of 10°, the mechanical back-stop device will
Auxiliary Hooks prevent it from tipping backward.
When the steel rope is rolled out near the last three ■ Winch Mechanism Brake
circles, an alarm will be given and meanwhile, the All winch brakes are spring-loaded normal-engaged
electric control system will automatically shut off the disk brakes, which provide a big braking force and
dropping action. are safe, reliable, free of maintenance, and durable.
■ Changeover Switch for Assembling Mode/ ■ CCTV Monitoring System
Operating Mode
With high-definition camera, the operator in the
Under the assembling mode, the over roll-out limit driver’s cab may have detection the real-time state
device, boom limit device and load moment limiter of luffing reel, hoisting winch reel and crane tail.
do not function to facilitate installation of crane.
20 SCC1500D
SCC1500D crawler crane
Safety Devices B
SCC1500D 21
B SCC1500D crawler crane
Safety Devices
22 SCC1500D
C
SCC1500D crawler crane
C
SCC1500D 23
B SCC1500D crawler crane
Table of Main Mechanism Data
Counterweight Parameters
Name Q’ty Length(m) Width (m) Height (m) Single piece weight (t)
Counterweight
6 1.6 1.19 0.69 6
block
Counterweight
2 1.6 1.19 0.29 3
block
Counterweight
1 4.58 1.84 0.62 12
tray
Central
2 3.95 1.29 0.79 8
counterweight
B
Hook Parameters
13.5t lifting
13.5t 1 0 1 0.52
hook
24 SCC1500D
SCC1500D crawler crane
Operating Condition Combination B
SCC1500D 25
C SCC1500D crawler crane
HL Operating Condition of Light-duty Boom
C 39 1 1 1
42 - 2 1
45 1 2 1
48 - 1 2
51 1 1 2
54 - 2 2
57 1 2 2
60 - 1 3
63 1 1 3
Boom 12m arm (4)
66 - 2 3
69 1 2 3
72 - 1 4
75 1 1 4
78 - 2 4 Boom 6m arm (2)
81 1 2 4
Boom 3m arm
26 SCC1500D
SCC1500D crawler crane
HL Operating Condition of Light-duty Boom C
Operating Range Diagram for HL Operating Condition of Light-duty Boom and HLC Operating
Condition of Light-duty Boom
SCC1500D 27
C SCC1500D crawler crane
Load Charts of HL Operating Condition of Light-duty Boom
Description:
1) The rated load indicated in the table is the max. permissible value for objects hoisted slowly and stably on
a level and hard ground when the crane does not travel.
2. The rated load indicated in the table is the value computed by taking 75% of the tipover load when the
wind speed is below 9.8m/s. The value of load indicated is in the unit of ton. The actual lifting capacity is the
value obtained by deducting the weight of hoisting tools (e.g. main and auxiliary lifting hooks) from the rated
lifting capacity indicated in the table.
The weight of lifting hook is shown as below:
150t lifting hook – 2.57t
100t lifting hook – 1.84t
50t lifting hook – 0.96t
25t lifting hook – 0.75t
C 13.5t lifting hook – 0.52t
3. All values in the load chart are suitable for 360o slewing.
28 SCC1500D
SCC1500D Crawler Crane – Load Chart of HL Operating Condition of Light-duty Boom 1/2 Unit: t
Arm length/m
Radius/m
18 21 24 27 30 33 36 39 42 45 48
4 — — — — — — — — — — —
5 150/4.94m 147.5/5.46m — — — — — — — — —
6 147.0 142.1 134.3/5.95m 124.6/6.5m — — — — — — —
7 128.5 126.0 123.5 119.7 115.8 112/7.54m — — — — —
8 112.5 111.4 110.3 109.2 107.0 104.0 100/8.07m 88/8.58m — — —
9 98.0 98.0 98.0 96.4 93.5 90.8 88.4 85.8 82.6/9.1m 75.7/9.63m —
10 85.7 85.7 85.7 84.7 82.4 80.2 78.3 76.2 74.3 72.4 70.7/10.1m
12 65.6 65.6 65.6 65.6 65.6 64.8 63.5 62.0 60.6 59.2 58.0
14 52.8 52.8 52.8 52.8 52.8 52.8 52.8 52.0 50.9 49.8 48.9
16 43.9 43.9 43.9 43.9 43.9 43.9 43.9 43.9 43.7 42.8 42.1
18 39.7/17.19m 37.5 37.5 37.5 37.5 37.4 37.4 37.4 37.2 37.1 36.8
20 — 32.9/19.8m 32.6 32.6 32.6 32.4 32.4 32.4 32.2 32.0 32.0
22 — — 27.9/22.4m 28.6 28.6 28.5 28.5 28.4 28.3 28.1 28.1
24 — — — 25.4 25.4 25.3 25.3 25.2 25.1 24.9 24.8
26 — — — 24.2/25m 22.7 22.6 22.6 22.5 22.4 22.2 22.2
28 — — — — 20.9/27.6m 20.4 20.4 20.3 20.2 20.0 20.0
30 — — — — — 18.2/30.2m 18.5 18.4 18.3 18.1 18.1
32 — — — — — — 16.3/32.8m 16.7 16.6 16.4 16.4
34 — — — — — — — 15.3 15.2 15.0 15.0
36 — — — — — — — 14.4/35.38m 13.9 13.7 13.7
38 — — — — — — — — 12.8/37.95m 12.6 12.6
40 — — — — — — — — — 11.3/40.58m 11.6
42 — — — — — — — — — — 10.7
44 — — — — — — — — — — 10.1/43.2m
46 — — — — — — — — — — —
48 — — — — — — — — — — —
50 — — — — — — — — — — —
Counterweight
54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16
(t)
Multiplying
13 12 11 10 10 9 8 7 7 6 6
SCC1500D crawler crane
Load Charts of HL Operating Condition of Light-duty Boom
factor
SCC1500D
C
29
C
C
30
SCC1500D Crawler Crane – Load Chart of HL Operating Condition of Light-duty Boom 1/2 Unit: t
C
Arm length/m
Radius/m
SCC1500D
51 54 57 60 63 66 69 72 75 78 81
10 63.6/10.6m — — — — — — — — — —
12 56.7 62.5/11.2m 50.0/11.7m 50.0/12.2m 48.8/12.75m 47.5/13.2m — — — — —
14 47.9 46.9 45.9 45.0 44.1 43.1 42.9/13.8m 38.5/14.3m 38.2/14.8m 36.1/15.3m —
16 41.2 40.4 39.6 38.9 38.1 37.3 36.5 35.8 35.1 34.3 33.6
18 36.1 35.3 34.6 34.0 33.3 32.7 32.0 31.4 30.7 30.1 29.4
20 31.8 31.3 30.6 30.1 29.5 28.9 28.3 27.8 27.2 26.6 26.0
SCC1500D crawler crane
22 27.9 27.7 27.3 26.9 26.3 25.8 25.2 24.8 24.2 23.7 23.1
24 24.7 24.5 24.3 24.2 23.6 23.1 22.6 22.2 21.7 21.2 20.7
26 22.0 21.8 21.6 21.5 21.3 20.9 20.4 20.0 19.5 19.1 18.6
28 19.8 19.6 19.4 19.3 19.1 18.9 18.5 18.1 17.7 17.2 16.8
30 17.9 17.7 17.5 17.4 17.2 17.0 16.8 16.5 16.0 15.6 15.2
32 16.2 16.0 15.8 15.7 15.5 15.3 15.1 15.0 14.6 14.2 13.8
34 14.8 14.6 14.4 14.3 14.1 13.9 13.7 13.6 13.3 12.9 12.5
36 13.5 13.3 13.1 13.0 12.8 12.6 12.4 12.3 12.1 11.8 11.4
38 12.4 12.2 12.0 11.9 11.7 11.5 11.3 11.2 10.9 10.7 10.4
40 11.4 11.2 11.0 10.9 10.7 10.5 10.3 10.2 9.9 9.7 9.5
42 10.5 10.3 10.1 10.0 9.8 9.6 9.4 9.3 9.0 8.8 8.6
44 9.6 9.5 9.3 9.2 9.0 8.8 8.5 8.4 8.2 8.0 7.8
46 9/45.75m 8.7 8.5 8.4 8.2 8.0 7.8 7.7 7.5 7.3 7.0
48 — 7.9/48.38m 7.8 7.8 7.6 7.4 7.1 7.0 6.8 6.6 6.3
50 — — 7.2 7.1 6.9 6.7 6.5 6.4 6.2 6.0 5.7
52 — — 6.9/50.97m 6.6 6.4 6.2 5.9 5.8 5.6 5.4 5.2
54 — — — 6.1/53.57m 5.8 5.6 5.4 5.3 5.1 4.9 4.6
Load Charts of HL Operating Condition of Light-duty Boom
Insert
Length Length of Angle of
of jib (m) boom (m) boom Jib tip 6.5m
3m 6 m 12m
22 1 1 - 23~53 65°~85°
25 - 2 - 23~53 65°~85°
31 - 1 1 23~53 65°~85°
Jib 6m insert
C
34 1 1 1 23~53 65°~85°
43 - 1 2 23~53 65°~85°
46 1 1 2 23~53 65°~85°
49 - 2 2 23~53 65°~85°
52 1 2 2 23~53 65°~85°
boom 23~53m
SCC1500D 31
C SCC1500D crawler crane
LJ Operating Condition of Luffing Jib
53m boom
50m boom
47m boom
44m boom
41m boom
38m boom
35m boom
32m boom
29m boom
26m boom
23m boom
32 SCC1500D
SCC1500D crawler crane
LJ Operating Condition of Luffing Jib C
Description:
1) The rated load indicated in the table is the max. permissible value for objects hoisted slowly and stably on
a level and hard ground when the crane does not travel.
2. The rated load indicated in the table is the value computed by taking 75% of the tipover load when the
wind speed is below 9.8m/s. The value of load indicated is in the unit of t. The actual lifting capacity is the
value obtained by deducting the weight of hoisting tools (e.g. main and auxiliary lifting hooks) from the rated
lifting capacity indicated in the table.
The weight of lifting hook is shown as below:
50t lifting hook – 0.96t
25t lifting hook – 0.75t
13.5t lifting hook – 0.52t
C
3. All values in the load chart are suitable for 360o slewing.
SCC1500D 33
C
34
C
SCC 1500D Crawler Crane – Load Chart of LJ Operating Condition of Luffing Jib Unit: t
Boom 23m Angle of boom 85o Jib length 22~52m Rear counterweight 54t Central counterweight 16t
SCC1500D
Arm length/m
Radius/m
22 25 28 31 34 37 40 43 46 49 52
11 50.0/10.3m 44.0/11.1m
12 45.7 44.0 39.0/11.9m
13 42.1 41.2 37.7 33.1/12.6m
14 39.0 38.2 37.2 32.8 28.4/13.4m
15 36.3 35.6 34.9 31.9 27.9 24.7/14.2m 21.5
16 34.0 33.4 32.7 31.5 27.8 23.8 21.2 18.8/15.8m
17 31.9 31.3 30.7 30.2 26.8 23.7 21.2 18.7 16.0/16.5m
SCC1500D crawler crane
18 30.1 29.6 29.0 28.5 26.5 23.4 20.2 17.8 16.0 14.3/17.3m
19 28.1 27.9 27.4 26.9 25.7 22.5 20.1 17.7 15.1 13.2 12.4
20 26.3 26.3 26.0 25.6 25.1 22.3 19.2 17.6 14.9 13.2 11.5
21 24.3 24.7 24.6 24.3 23.9 21.3 19.0 16.6 14.9 13.2 11.4
22 22.2 23.4 23.3 23.2 22.8 21.3 18.9 16.5 14.1 12.2 11.3
23 20.1 21.8 22.0 21.9 21.7 20.4 18.1 15.6 14.0 12.2 10.5
24 18.2 20.1 20.9 20.8 20.7 20.2 18.0 15.6 13.9 12.2 10.5
25 16.1 18.4 19.6 19.8 19.7 19.4 17.1 15.4 13.1 11.3 10.4
26 16.9 18.2 18.9 18.7 18.5 17.0 14.6 12.9 11.3 10.4
27 15.4 16.9 17.8 17.9 17.8 16.1 14.5 12.9 11.3 9.6
LJ Operating Condition of Luffing Jib
28 13.8 15.7 16.6 17.1 17.0 15.3 13.7 12.1 10.4 9.4
29 14.4 15.5 16.2 16.3 15.1 13.7 12.1 10.4 9.4
30 13.2 14.5 15.2 15.7 14.4 12.8 11.1 10.3 8.7
31 11.9 13.5 14.3 14.8 13.5 12.8 11.1 9.4 8.5
32 12.5 13.4 14.0 13.4 11.9 10.3 9.4 8.4
33 11.5 12.5 13.1 12.7 11.1 10.1 8.5 7.6
34 10.4 11.7 12.4 11.9 11.0 9.4 8.5 7.5
35 10.9 11.6 11.7 10.1 9.3 8.5 6.8
36 10.0 11.0 11.0 10.1 8.5 7.6 6.8
37 9.1 10.3 10.1 9.3 8.4 7.5 6.7
38 9.6 10.1 8.5 7.6 6.7 5.7
39 8.8 9.3 8.4 7.6 6.7 5.7
40 8.1 8.5 7.6 6.7 6.7 5.7
41 7.7 7.6 6.7 5.8 5.0
42 6.9 6.8 6.0 5.8 4.9
43 6.8 6.7 5.8 5.0 4.9
44 5.9 5.0 4.9 4.0
45 5.1 5.0 4.2 4.0
46 4.1 4.1 4.0
47 4.1 4.1 3.1
48 3.3 3.3 3.1
49 3.2 3.1
50 2.3 2.3
51 2.3 2.3
52 2.2
53 1.3
54 1.3
Multiplying
4 4 3 3 3 2 2 2 2 2 1
factor
Counterweight
54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16
(t)
SCC 1500D Crawler Crane – Load Chart of LJ Operating Condition of Luffing Jib Unit: t
Boom 23m Angle of boom 85o Jib length 22~52m Rear counterweight 54t Central counterweight 16t
Arm length/m
Radius/m
22 25 28 31 34 37 40 43 46 49 52
12
13 24.3/12.9m 21.5/13.7m
14 23.1 21.5 19.8/14.5m
15 22.3 20.7 19.8 17.8/15.3m
16 20.7 19.8 18.9 17.8 16.0 15.0/16.8m
17 20.4 18.9 17.8 17.0 16.0 15.0 13.4/17.6m
18 19.7 18.7 17.7 16.0 15.1 14.2 13.4 12.3/18.4m
19 18.6 17.8 16.8 15.9 15.1 14.2 13.3 12.3 10.5/19.1m 9.6/19.9m
20 17.7 16.9 16.0 15.1 14.3 13.4 12.3 11.3 10.5 9.6 8.4/20.7
21 16.9 16.0 15.0 15.0 14.1 13.3 12.3 11.3 10.4 9.5 8.4
22 15.9 15.9 15.1 14.2 13.3 12.4 11.5 10.4 10.4 9.5 8.4
23 15.9 15.0 14.3 14.1 13.2 12.4 11.3 10.4 9.5 8.6 8.4
24 15.0 14.1 14.1 13.2 12.2 11.4 11.3 10.4 9.5 8.5 7.6
25 14.9 14.0 13.2 12.5 12.2 11.4 10.4 9.6 9.4 8.5 7.6
26 14.0 13.3 13.2 12.3 11.4 11.3 10.4 9.6 8.7 8.5 7.6
27 13.2 13.2 12.3 12.2 11.3 10.4 10.4 9.6 8.5 7.6 7.6
28 13.2 12.3 12.2 11.4 11.3 10.4 9.6 9.6 8.5 7.6 6.7
29 12.2 11.4 11.4 10.4 10.4 9.5 8.7 8.5 7.6 6.7
30 12.2 11.3 10.5 10.4 9.5 9.5 8.6 7.7 7.6 6.6
31 11.3 10.5 10.5 9.6 9.5 8.6 8.6 7.7 6.8 6.6
32 10.4 10.4 9.6 9.5 8.6 7.8 7.6 6.6 5.7
33 10.4 9.6 9.5 8.7 8.6 7.7 7.5 6.7 5.7
34 10.3 9.6 8.7 8.6 7.7 7.6 6.7 6.7 5.7
35 9.5 8.7 8.6 7.7 7.6 6.7 5.8 5.7
36 8.7 8.6 7.8 7.7 6.8 6.7 5.8 5.7
37 8.6 8.6 7.8 7.7 6.7 5.8 5.7 4.9
38 7.7 7.7 6.8 6.7 5.8 5.7 4.8
39 7.6 7.6 6.7 6.6 5.8 4.9 4.8
40 6.8 6.7 5.9 5.8 4.9 4.8
41 6.8 5.9 5.8 5.7 4.9 4.0
42 6.8 5.9 5.8 4.9 4.9 4.0
43 5.9 5.0 4.9 4.9 4.0
44 5.7 4.9 4.9 4.0 3.9
45 4.9 4.9 4.9 4.0 3.9
46 4.9 4.0 4.0 3.1
47 4.1 4.0 4.0 3.0
48 4.0 4.0 3.1 3.0
49 3.1 3.1 3.0
50 3.1 3.1 2.2
51 3.1 2.2 2.2
52 2.2 2.2
53 2.2 2.1
54 2.2 1.3
55 1.3
56 1.3
57 1.3
Multiplying
SCC1500D crawler crane
LJ Operating Condition of Luffing Jib
2 2 2 2 2 2 2 1 1 1 1
factor
SCC1500D
Counterweight
54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16
(t)
C
35
C
C SCC1500D crawler crane
H Operating Condition of Heavy-duty Boom
Insert
Length of boom (m)
3m 6m 12m Arm head 0.5m
23 1 1 -
Reducing arm 6.5m
26 - 2 -
29 1 2 -
32 - 1 1
35 1 1 1
C 38 - 2 1
41 1 2 1
44 - 1 2
Boom 12m arm (2)
47 1 1 2
50 - 2 2
53 1 2 2
Boom 3m arm
36 SCC1500D
SCC1500D crawler crane
H Operating Condition of Heavy-duty Boom C
53 m boom
50 m boom
47 m boom
44 m boom
41 m boom
38 m boom
35 m boom
32 m boom
29 m boom
26 m boom
23 m boom
Operating rang
e (m)
Slewing center
SCC1500D 37
C SCC1500D crawler crane
H Operating Condition of Heavy-duty Boom
C 17
18
19
39.5
36.5
33.8
39.6
36.6
33.9
39.5
36.5
33.8
39.7
36.6
34
39.5
36.5
33.8
39.4
36.4
33.7
39.3
36.2
33.6
39.2
36.2
33.6
38.4
35.9
33.4
37.6
35.1
32.9
36.8
34.4
32.2
20 31.5 31.5 31.5 31.6 31.5 31.4 31.2 31.2 31.1 30.9 30.3
21 29.3 29.4 29.4 29.5 29.4 29.3 29.1 29.1 29 28.8 28.5
22 27.6 27.5 27.7 27.5 27.4 27.3 27.3 27.1 26.9 26.7
23 25.9 25.8 26 25.9 25.8 25.6 25.6 25.4 25.2 25
24 24.3 24.3 24.5 24.3 24.2 24.1 24.1 23.9 23.7 23.5
25 22.9 23.1 22.9 22.8 22.7 22.7 22.5 22.3 22.1
26 21.6 21.8 21.7 21.6 21.4 21.4 21.2 21.1 20.8
27 20.4 20.6 20.5 20.4 20.2 20.2 20 19.9 19.7
28 19.5 19.4 19.3 19.2 19.2 19 18.8 18.6
29 18.5 18.4 18.3 18.2 18.2 18 17.8 17.6
30 17.5 17.4 17.2 17.3 17.1 16.9 16.7
31 16.6 16.6 16.4 16.4 16.2 16.1 15.8
32 15.8 15.8 15.6 15.6 15.4 15.3 15
33 15 14.8 14.9 14.7 14.5 14.3
34 14.3 14.1 14.2 14 13.8 13.6
35 13.5 13.5 13.3 13.2 13
36 12.9 12.9 12.7 12.5 12.3
37 12.3 12.3 12.1 12 11.8
38 11.8 11.6 11.4 11.2
39 11.2 11.1 10.9 10.7
40 10.7 10.6 10.4 10.2
41 10.1 9.9 9.7
42 9.6 9.5 9.3
43 9.1 8.9
44 8.7 8.5
45 8.3 8.1
46 7.7
47 7.4
Counterweight 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16 54+16
Multiplying factor 8 8 8 8 8 8 8 8 7 6 6
38 SCC1500D
SCC1500D crawler crane
FJ Operating Condition of Fixed Jib C
19 1 1 27~69 15°,30°
25 1 2 33~69 15°,30°
31 1 3 39~69 15°,30°
C
Boom 27~75m
SCC1500D 39
C SCC1500D crawler crane
FJ Operating Condition of Fixed Jib
75m boom
27m boom
27m boom + 19m jib
+ 19m jib
27m boom 27m boom
+ 13m jib
+ 13m jib
Slewing center
40 SCC1500D
SCC1500D crawler crane
FJ Operating Condition of Fixed Jib C
Description:
1. The rated load indicated in the table is the max. permissible value for objects hoisted slowly and stably on
a level and hard ground when the crane does not travel.
2. The rated load indicated in the table is the value computed by taking 75% of the tipover load when the
wind speed is below 9.8m/s. The value of load indicated is in the unit of t. The actual lifting capacity is the
value obtained by deducting the weight of hoisting tools (e.g. main and auxiliary lifting hooks) from the rated
lifting capacity indicated in the table.
The weight of lifting hook is shown as below:
13.5t lifting hook – 0.52t;
3. All values in the load chart are suitable for 360o slewing.
SCC1500D 41
C
42
C
SCC 1500D Crawler Crane – Load Chart of FJ Operating Condition of Fixed Jib 1/5 Unit: t
SCC1500D
Boom length
27 30 33
(m)
Jib length (m) 13 19 13 19 13 19
Installation
angle of jib
15° 30° 15° 30° 15° 30° 15° 30° 15° 30° 15° 30°
Operating
range (m)
12 13.0/12.3m 13.0/12.9m 13.0/13.4m
14 13.0 9.0/15.1m 8.0/14.9m 13.0 9.0/15.7m 8.0/15.5m 13.0
SCC1500D crawler crane
38 11.1 9.0 8.0/37.9m 6.0/37.9m 5.0/37.9m 4.6/37.9m 3.0/37.9m 2.5/37.9m 10.2 9.0 8.0 6.0
SCC1500D
40 9.6/37.9m 9.0/37.9m 9.4 9.0 8.0 6.0
42 9.2/40.5m 9.0/40.5m 8.0/40.5m 6.0/40.5m
C
43
Counterweight 54+16
C
C
44
C
SCC1500D Crawler Crane – Load Chart of FJ Operating Condition of Fixed Jib 3/5 Unit: t
SCC1500D
Boom length (m) 45 48
Jib length (m) 25 31 13 19 25 31
Installation
angle of jib
15° 30° 15° 30° 15° 30° 15° 30° 15° 30° 15° 30°
Operating
range (m)
16 13.0/16.3m
18 13.0 9.0/19.1m 8.0/18.9m
SCC1500D crawler crane
36 5.0 4.6 3.0 2.4 10.6 9.0 8.0 6.0 5.0 4.6 3.0 2.6
38 5.0 4.6 3.0 2.4 9.8 9.0 8.0 6.0 5.0 4.6 3.0 2.6
40 5.0 4..6 3.0 2.4 9.0 9.0 8.0 6.0 5.0 4.6 3.0 2.6
42 5.0/40.5m 4.6/40.5m 3.0/40.5m 2.4/40.5m 8.4 8.6 8.0 6.0 5.0 4.6 3.0 2.6
44 8.1/43.1m 8.2/43.1m 8.0/43.1m 6.0/43.1m 5.0/43.1m 4.6/43.1m 3.0/43.1m 2.6/43.1m
Counterweight 54+16
Boom length (m) 51 54
Jib length (m) 13 19 25 31 13 19
Installation
angle of jib
15° 30° 15° 30° 15° 30° 15° 30° 15° 30° 15° 30°
Operating
range (m)
16 13.0/16.9m 13.0
18 13.0 9.0/19.7m 8.0/19.5m 13.0
20 13.0 9.0 8.0 13.0 9.0/20.3m 8.0/20.1m
22 13.0 9.0 8.0 6.0/23.6m 5.0/22.1m 13.0 9.0 8.0
24 13.0 9.0 8.0 6.0 5.0 3.0/24.8m 13.0 9.0 8.0 6.0/24.2m
26 13.0 9.0 8.0 6.0 5.0 4.6/27.6m 3.0 13.0 9.0 8.0 6.0
28 13.0 9.0 8.0 6.0 5.0 4.6 3.0 13.0 9.0 8.0 6.0
30 13.0/30.1m 9.0 8.0 6.0 5.0 4.6 3.0 2.6/31.5m 13.0 9.0 8.0 6.0
32 12.7 9.0 8.0 6.0 5.0 4.6 3.0 2.6 12.6 9.0 8.0 6.0
34 11.7 9.0 8.0 6.0 5.0 4.6 3.0 2.6 11.4 9.0 8.0 6.0
36 10.7 9.0 8.0 6.0 5.0 4.6 3.0 2.6 10.5 9.0 8.0 6.0
38 9.8 9.0 8.0 6.0 5.0 4.6 3.0 2.6 9.6 9.0 8.0 6.0
40 9.1 9.0 8.0 6.0 5.0 4.6 3.0 2.5 8.9 8.9 8.0 6.0
42 8.3 8.3 8.0 6.0 5.0 4.6 2.9 2.5 8.1 8.1 8.0 6.0
44 7.8 7.8 7.8 6.0 5.0 4.6 2.9 2.4 7.6 7.6 7.6 6.0
46 7.3/45.7m 7.3/45.7m 7.3/45.7m 6.0/45.7m 5.0/45.7m 4.6/45.7m 2.8/45.7m 2.35/45.7m 7.0 7.0 7.0 6.0
48 6.5 6.5 6.5 6.0
50 6.4/48.3m 6.4/48.3m 6.4/48.3m 6.0/48.3m
Counterweight 54+16
SCC1500D Crawler Crane – Load Chart of FJ Operating Condition of Fixed Jib 4/5 Unit: t
Boom length (m) 54 57
Jib length (m) 25 31 13 19 25 31
Installation
angle of jib
15° 30°
Operating
range (m)
16 13.0
18 13.0 9.0/20.9m 8.0/20.7m
20 13.0 9.0 8.0 5.0/23.3m
22 5.0/22.7m 13.0 9.0 8.0 6.0/24.8m 5.0 3.0/25.5m
24 5.0 3.0/25.3m 13.0 9.0 8.0 6.0 5.0 3.0
26 5.0 3.0 13.0 9.0 8.0 6.0 5.0 4.6/28.7m 3.0
28 5.0 4.6/28.2m 3.0 13.0 9.0 8.0 6.0 5.0 4.6 3.0
30 5.0 4.6 3.0 12.4 9.0 8.0 6.0 5.0 4.6 3.0 2.6/32.7m
32 5.0 4.6 3.0 2.6/32.1m 11.2 9.0 8.0 6.0 5.0 4.6 3.0 2.6
34 5.0 4.6 3.0 2.6 10.3 9.0 8.0 6.0 5.0 4.6 3.0 2.6
36 5.0 4.6 3.0 2.6 9.4 9.0 8.0 6.0 5.0 4.6 3.0 2.6
38 5.0 4.6 3.0 2.6 8.7 8.7 8.0 6.0 5.0 4.6 3.0 2.6
40 5.0 4.6 3.0 2.6 7.9 7.9 7.9 6.0 5.0 4.6 3.0 2.6
42 5.0 4.6 3.0 2.6 7.4 7.4 7.4 6.0 5.0 4.6 3.0 2.6
44 5.0 4.6 3.0 2.6 6.7 6.7 6.7 6.0 5.0 4.6 3.0 2.6
46 5.0 4.6 3.0 2.6 6.3 6.3 6.3 6.0 5.0 4.6 3.0 2.6
48 5.0 4.6 2.9 2.5 5.9 5.9 5.9 5.9 5.0 4.6 2.9 2.5
50 5.0/48.3m 4.6/48.3m 2.9/48.3m 2.5/48.3m 5.7/50.9m 5.7/50.9m 5.7/50.9m 5.7/50.9m 5.0/50.9m 4.6/50.9m 2.9/50.9m 2.5/50.9m
Counterweight 54+16
Boom length (m) 60 63
Jib length (m) 13 19 25 31 13 19
Installation
angle of jib
15° 30° 15° 30° 15° 30°
Operating
range (m)
18 13.0/18.6m 13.0/19.2m
20 13.0 9.0/21.4m 8.0/21.2m 13.0 8.0/21.8m
22 13.0 9.0 8.0 5.0/23.9m 13.0 9.0 8.0
24 13.0 9.0 8.0 6.0/25.4m 5.0 13.0 9.0 8.0 6.0/25.9m
26 13.0 9.0 8.0 6.0 5.0 3.0/26.5m 13.0 9.0 8.0 6.0
28 13.0 9.0 8.0 6.0 5.0 4.6/29.3m 3.0 13.0 9.0 8.0 6.0
30 13.0 9.0 8.0 6.0 5.0 4.6 3.0 13.0 9.0 8.0 6.0
32 12.6 9.0 8.0 6.0 5.0 4.6 3.0 2.6/33.2m 12.4 9.0 8.0 6.0
34 11.4 9.0 8.0 6.0 5.0 4.6 3.0 2.6 11.2 9.0 8.0 6.0
36 10.4 9.0 8.0 6.0 5.0 4.6 3.0 2.6 10.2 9.0 8.0 6.0
38 9.5 9.0 8.0 6.0 5.0 4.6 3.0 2.6 9.3 9.0 8.0 6.0
40 8.8 8.8 8.0 6.0 5.0 4.6 3.0 2.6 8.6 8.6 8.0 6.0
42 8.0 8.0 8.0 6.0 5.0 4.6 3.0 2.6 7.8 7.8 7.8 6.0
44 7.4 7.4 7.4 6.0 5.0 4.6 3.0 2.6 7.2 7.2 7.2 6.0
46 6.7 6.7 6.7 6.0 5.0 4.6 3.0 2.6 6.5 6.5 6.5 6.0
48 6.3 6.3 6.3 6.0 5.0 4.6 3.0 2.6 6.1 6.1 6.1 6.0
50 5.8 5.8 5.8 5.8 5.0 4.6 3.0 2.5 5.6 5.6 5.6 5.6
SCC1500D crawler crane
FJ Operating Condition of Fixed Jib
52 5.4 5.4 5.4 5.4 5.0 4.6 2.9 2.5 5.0 5.0 5.0 5.0
SCC1500D
54 5.0/53.5m 5.0/53.5m 5.0/53.5m 5.0/53.5m 5.0/53.5m 4.6/53.5m 2.9/53.5m 2.4/53.5m 4.6 4.6 4.6 4.6
56 4.2/56.1m 4.2/56.1m 4.2/56.1m 4.2/56.1m
Counterweight 54+16
C
45
C
C
46
SCC1500D Crawler Crane – Load Chart of FJ Operating Condition of Fixed Jib 5/5 Unit: t
C
Boom length (m) 63 66
Jib length (m) 25 31 13 19 25 31
SCC1500D
Installation
angle of jib
15° 30° 15° 30° 15° 30°
Operating
range (m)
18 13.0/19.2m
20 13.0
22 13.0 9.0/22.6m 8.0/22.4m
24 5.0/24.4m 13.0 9.0 8.0 5.0/25.0m
26 5.0 3.0/27.1m 13.0 9.0 8.0 6.0/26.5m 5.0 3.0/27.6m
28 5.0 4.6/29.9m 3.0 13.0 9.0 8.0 6.0 5.0 3.0
30 5.0 4.6 3.0 13.0 9.0 8.0 6.0 5.0 4.6/30.4m 3.0
SCC1500D crawler crane
32 5.0 4.6 3.0 2.6/33.8m 12.2 9.0 8.0 6.0 5.0 4.6 3.0
34 5.0 4.6 3.0 2.6 11.1 9.0 8.0 6.0 5.0 4.6 3.0 2.6/34.4m
36 5.0 4.6 3.0 2.6 10.1 9.0 8.0 6.0 5.0 4.6 3.0 2.6
38 5.0 4.6 3.0 2.6 9.2 9.0 8.0 6.0 5.0 4.6 3.0 2.6
40 5.0 4.6 3.0 2.6 8.3 8.3 8.0 6.0 5.0 4.6 3.0 2.6
42 5.0 4.6 3.0 2.6 7.6 7.6 7.6 6.0 5.0 4.6 3.0 2.6
44 5.0 4.6 3.0 2.6 7.0 7.0 7.0 6.0 5.0 4.6 3.0 2.6
46 5.0 4.6 3.0 2.6 6.4 6.4 6.4 6.0 5.0 4.6 3.0 2.6
48 5.0 4.6 3.0 2.6 5.9 5.9 5.9 5.9 5.0 4.6 3.0 2.6
50 5.0 4.6 3.0 2.5 5.4 5.4 5.4 5.4 5.0 4.6 3.0 2.5
FJ Operating Condition of Fixed Jib
52 5.0 4.6 3.0 2.5 4.8 4.8 4.8 4.8 4.8 4.6 3.0 2.5
54 4.6 4.6 2.9 2.4 4.4 4.4 4.4 4.4 4.4 4.4 2.9 2.4
56 4.2/56.1m 4.2/56.1m 2.9/56.1m 2.3/56.1m 4.0 4.0 4.0 4.0 4.0 4.0 2.9 2.4
58 3.5 3.5 3.5 3.5 3.5 3.5 2.8 2.3
60 3.4/58.7m 3.4/58.7m 3.4/58.7m 3.4/58.7m 3.4/58.7m 3.4/58.7m 2.8/58.7m 2.2/58.7m
Counterweight 54+16
Boom length (m) 69 75
Jib length (m) 13 19 25 31 13
Installation
angle of jib
15° 30° 15° 30° 15°
Operating
range (m)
18
20 13.0/20.3m 13.0/21.5m
22 13.0 9.0/23.1m 8.0/22.9m 13.0
24 13.0 9.0 8.0 5.0/25.6m 13.0 9.0/24.3m
26 13.0 9.0 8.0 6.0/27.1m 5.0 13.0 9.0
28 13.0 9.0 8.0 6.0 5.0 3.0/28.2m 13.0 9.0
30 13.0 9.0 8.0 6.0 5.0 4.6/31.0m 3.0 13.0 9.0
32 12.2 9.0 8.0 6.0 5.0 4.6 3.0 11.8 9.0
34 11.0 9.0 8.0 6.0 5.0 4.6 3.0 2.6/35.0m 10.6 9.0
36 10.0 9.0 8.0 6.0 5.0 4.6 3.0 2.6 9.5 9.0
38 9.1 9.0 8.0 6.0 5.0 4.6 3.0 2.6 8.7 8.7
40 8.2 8.2 8.0 6.0 5.0 4.6 3.0 2.6 7.8 7.8
42 7.6 7.6 7.6 6.0 5.0 4.6 3.0 2.6 7.1 7.1
44 7.0 7.0 7.0 6.0 5.0 4.6 3.0 2.6 6.4 6.4
46 6.3 6.3 6.3 6.0 5.0 4.6 3.0 2.6 5.8 5.8
48 5.8 5.8 5.8 5.8 5.0 4.6 3.0 2.6 5.1 5.1
50 5.2 5.2 5.2 5.2 5.0 4.6 3.0 2.5 4.6 4.6
52 4.7 4.7 4.7 4.7 4.7 4.6 3.0 2.5 4.1 4.1
54 4.2 4.2 4.2 4.2 4.2 4.2 2.9 2.4 3.6 3.6
56 3.7 3.7 3.7 3.7 3.7 3.7 2.9 2.4 3.2 3.2
58 3.4 3.4 3.4 3.4 3.4 3.4 2.8 2.3 2.8 2.8
60 3.0 3.0 3.0 3.0 3.0 3.0 2.8 2.2 2.4 2.4
Counterweight 54+16
Notes
Shanghai Sany Science&Technology Co.,Ltd.
No.319, Chuanda Rd, Chuansha Economic Park, Pudong District,Shanghai 201200.P.R.China
Tel:0086-021-58595081(Sales) 0086-021-58593139(Service)
Printed in China
Fax:0086-021-58595081
Website: www.sanygroup.com
Materials and specifications are subject to change without further notice in accordance with constant technical innovations.
Photos may include additional equipment.