Risk Assessment Title: Scaffolding System

R/A Number: - Revision: B


Risk Assessment
Current Risk Final Risk
Item Task (Steps) Potential Hazard Potential Incident Existing Control Additional Control Remarks
Seve Freq. Risk Seve. Freq. Risk

Attachment #1. Risk Assessment.

Travel path is free of - To place safety signage at work place.


Slipping and Tripping
Preparation - Personnel injury obstruction. - Clearance area from Obstacles
1 Terpeleset dan 2 2 4 2 1 2
Persiapan - Pekerja terluka Jalur jalan bebas dari - Tempatkan rambu ditempat kerja
tersandung
hambatan - Bersihkan area dari kendala
- Brief tool box talk with all involved personnel
prior to commence works.
Using mandatory PPE including - Spray road by water if needed
Dust hazard - Personnel injury 1 4 4 1 1 1
ear plug and dust mask. - Lakukan TBM singkat dengan semua personel
yang terlibat sebelum mulai bekerja.
- Semprotkan jalan dengan air jika perlu
-

- Strengthen foundation by
- Strengthen foundation by using ground compaction,
using ground compaction, deck, and steel material
deck, and steel material - Maintain distance
- Maintain distance between between columns
columns 1.5~1.8m toward 1.5~1.8m toward ledger
ledger direction, and 1.5m direction, and 1.5m toward
toward putlog direction putlog direction
- Make a plan for scaffolding, - Make a plan for
and train on work procedure scaffolding, and train on
- Manager stays at the site work procedure
- Manager stays at the site Check on gound condition, and measures to
Scaffold - Perkuat pondasi dengan prevent columns from sinking
installation and Column installation menggunakan pemadatan - Perkuat pondasi dengan 3 2 6 Periksa kondisi gound, dan langkah-langkah 3 1 3
dismantling tanah, dek, dan material menggunakan pemadatan untuk mencegah kolom tidak tenggelam
tanah, dek, dan material baja
baja - Pertahankan jarak
antara kolom 1,5 ~ 1,8m ke - Pertahankan jarak antara
arah buku besar, dan 1,5m kolom 1,5 ~ 1,8m ke arah

ke arah putlog - Buat buku besar, dan 1,5m ke


arah putlog - Buat rencana
rencana untuk perancah,
untuk perancah, dan latih
dan latih prosedur kerja -
Manajer tetap dilapangan prosedur kerja - Manajer
tetap dilapangan
Work platform - Fall through space in the - Space needs to be 3cm 3 2 6 - Check on lifeline and blocks during installation 3 1 3
Risk Assessment Title: Scaffolding System

R/A Number: - Revision: B


Risk Assessment
Current Risk Final Risk
Item Task (Steps) Potential Hazard Potential Incident Existing Control Additional Control Remarks
Seve Freq. Risk Seve. Freq. Risk

or less
- Install upper platform
work platform after installing wale or
- Fall due to losing balance safety railing
during work platform (Ban installing work
installation platform stepping on
- Fall caused by poorly fixed horizontal struts)
work platform during Check work platform is fixed
and dismantling
scaffold dismantling and before dismantling or repairing
- Check manager is assigned to confirm fall arrest
repair work scaffold
safety equipment is used during work
- Ruang harus 3cm atau
-
installation - Jatuh melalui ruang di kurang - Periksa garis hidup dan blok selama instalasi
platform kerja - Pasang platform atas dan pembongkaran - Periksa manajer
- Jatuh karena kehilangan setelah menginstal wale atau ditugaskan untuk mengkonfirmasi peralatan
keseimbangan selama pagar pengaman keselamatan penangkapan jatuh digunakan
instalasi platform kerja - (Larangan menginstal selama bekerja
Jatuh disebabkan oleh platform kerja menginjak
platform kerja yang tidak struts horizontal)
diperbaiki dengan baik saat Periksa platform kerja sudah
pembongkaran perancah diperbaiki sebelum
dan perbaikan membongkar atau
memperbaiki perancah

- Install stairs and ladder


(along with work platform)
'- Fall due to no passage
Install lifeline and wear safety - Check installation of passage
during installation and
harness to move around during
dismantling - (When dismantling passage, keep one for
scaffold installation and
- Fall due to not wearing safety workers, and when assembly is done, check
dismantling
harness stepping on scaffold installed state of passage)
Passage installation 3 2 6 - 3 1 3
- Pasang tangga dan tangga
Jatuh karena tidak ada bagian - Periksa pemasangan bagian - (Ketika
(bersama dengan platform
selama instalasi dan membongkar bagian, simpan satu untuk pekerja,
kerja)  Pasang tali pengaman
pembongkaran - Jatuh karena dan ketika perakitan dilakukan, periksa keadaan
dan pakailah safety harness
tidak memakai safety harness bagian terpasang)
untuk bergerak selama
menginjak perancah
pemasangan dan
pembongkaran perancah
- Fall and collapse due to
- Check installed and fixed state of work platform
poor safety railing, work
and safety railing
platform, wall joint, and
Fall and collapse due to poorly - Check standards of wall joint installation and
brace
installed scaffold dismantling are complied with
Jatuh dan runtuh karena pagar
End of work Jatuh dan runtuh karena 3 2 6 - Periksa keadaan platform kerja dan pagar 3 1 3
perancah yang diinstal buruk pengaman yang buruk, pengaman yang diinstal dan diperbaiki
- Periksa standar pemasangan dan pembongkaran
platform kerja, sambungan
sambungan dinding telah dipenuhi
dinding, dan brace
-
-
2 Loading/ Lifting gear failure - Personnel injury - Competent crane operator. 3 2 6 - Rigger to be trained and competent. 3 1 3
Risk Assessment Title: Scaffolding System

R/A Number: - Revision: B


Risk Assessment
Current Risk Final Risk
Item Task (Steps) Potential Hazard Potential Incident Existing Control Additional Control Remarks
Seve Freq. Risk Seve. Freq. Risk

- Check Crane registration and Crane operator’s


license are current.
- Use correct slings / lifting equipment with current
tag.
- Place Slings and supports only at the designated
lifting points marked on the sheet pile.
- Use tag line on the load to control the swing.
- Use correct slings / lifting - All workers to stand clear of sheet piles during
equipment with current tag. lifting.
Unloading, using - Rigger untuk dilatih dan kompeten.
- Operator crane yang
mobile crane - Property damage - Periksa pendaftaran Crane dan lisensi operator
Lifting gear yang kompeten
Loading/unloading - Pekerja terluka Crane masih berlaku.
rusak - Gunakan sling yng
menggunakan - Kerusakan alat - Gunakan sling / alat pengangkat yang benar
mobil crane sesuai/alat lifting
dengan tag saat ini.
- Tempatkan Sling dan penyangga hanya pada titik
pengangkatan yang ditunjuk yang ditandai pada
tumpukan lembar.
- Gunakan garis tag pada beban untuk mengontrol
ayunan.
- Semua pekerja harus menjauhi tumpukan
lembaran selama pengangkatan.
-

- Personnel injury - To check all lifting gear on daily basis prior to


- Valid certificates by 3rd
- Fatality start work
party,
falling objects - Property damage - Clearance area under lifting area
- Monthly colour coding 3 2 6 3 1 3
Benda jatuh Pekerja terluka - Cek semua lifting gear harian sebelum
- Sertifikat masih berlaku
Fatality pekerjaan dimulai
- Colour coding bulanan
Kerusakan alat - Area kerja harus clear
- Personnel injury - Barricade work area with
- Fatality warning signs posted.
Hit by swinging load
- Property damage - Flagman must be stay in - Use double tag lines to control the swinging
Terkena beban 3 2 6 3 1 3
Pekerja terluka site - Gunakan TAGline ganda utk control swing.
swing
Fatality - Barikade area kerja dan
- Kerusakan alat pasang sign
- Crane operator to observe - Brief tool box talk with all involved personnel
- Personnel injury soft ground when prior to commence works.
- Fatality reposition. - Check the lifting plan, safe lifting radius
Crane Collapse - Property damage - Certified operator - Lakukan TBM singkat dengan utk semua
3 2 6 3 1 3
Pekerja terluka - Operator haru observasi personel yang terlibat sebelum mulai
Fatality tanah yang lunak ketika bekerja. - Periksa rencana pengangkatan,
- Kerusakan alat mengubah posisi crane radius pengangkatan yang aman..
- Sertifikat operator -
- Brief tool box talk with all involved personnel
- Personnel injury Only designated person to
prior to commence works.
Communication error - Property damage communicate during activity.
2 2 4 - Ensure Handy Talky Works if needed 2 1 2
Error komunikasi Pekerja terluka Hanya orang yang di tunjuk utk
- Lakukan TBM utk semua personel yang terlibat
- Kerusakan alat melakukan komunikasi
sebelum pekerjaan dimulai
Risk Assessment Title: Scaffolding System

R/A Number: - Revision: B


Risk Assessment
Current Risk Final Risk
Item Task (Steps) Potential Hazard Potential Incident Existing Control Additional Control Remarks
Seve Freq. Risk Seve. Freq. Risk

Using mandatory PPE and - Brief tool box talk with all involved personnel
Scaffolding - Personnel injury
Pinch gloves prior to commence works.
3 erection/ Pekerja terluka 2 2 4 2 1 2
Terjepit Gunakn wajid APD dan sarung - Lakukan TBM utk semua personel yang terlibat
dismantling -
tangan sebelum pekerjaan dimulai
- Brief tool box talk with all involved personnel
- Clean area from water or prior to commence works.
oil spill on the platform/ - Watch stepping on.
- Personnel injury walking deck. - Clearance area from small part and small tool on
Slipping/Trip
Pekerja terluka - Bersihkan area dari air 2 2 4 the platform/ walking deck. 2 1 2
Terpeleset
- atau tumpahan oli di - Lakukan TBM utk semua personel yang terlibat
platform sebelum pekerjaan dimulai
- Perhatikan langkah kaki
- Bersihkan area dari alat2 yang tidak digunakan
- Using mandatory PPE
- Brief tool box talk with all involved personnel
- Personnel injury - Competent work at height
prior to commence works.
- Fatality - Wear full body harness
Falls - Lakukan TBM utk semua personel yang terlibat
Pekerja terluka - Gunakan wajib APD 2 2 4 3 1 3
Jatuh sebelum pekerjaan dimulai
Fatality - Pekerja yang kompeten
- Mandatory work at height training for scaffolder
- - Gunakan pelindung
Wajib WAH training utk scaffolder
jatuh/bodyharness
- Brief tool box talk with all involved personnel
prior to commence works.
- Personnel injury
- Clear area from small part and small tool on the
Being struck by - Fatality
Using complete PPE working platform.
falling object Pekerja terluka 2 2 4 2 1 2
Gunakan APD lengkap - Lakukan TBM utk semua personel yang terlibat
Benda jatuh Fatality
sebelum pekerjaan dimulai
-
- Perhatikan langkah kaki
- Bersihkan area dari alat2 yang tidak digunakan
Scaffolding Collapse - Personnel injury - Design should be allow for 3 4 12 - Inspection should be undertaken by qualified 3 1 3
- Fatality loads during construction person.
- Property damage (such as workers, - Selected material/ equipment, using good
Pekerja terluka materials, wind, false condition and separated the broken material/
Fatality decks, rain, water runoff), equipment.
- Kerusakan alat strength, stability and - Inspeksi harus dilakukan oleh orang yang
stiffness of system berkualifikasi. - Material / peralatan terpilih,
- Built scaffolding should be menggunakan kondisi baik dan memisahkan
according the shop
material / peralatan yang rusak.
drawing
- Tagging scaffolding system
- Desain harus
memungkinkan muatan
selama konstruksi
(seperti pekerja, bahan,
angin, geladak palsu,
Risk Assessment Title: Scaffolding System

R/A Number: - Revision: B


Risk Assessment
Current Risk Final Risk
Item Task (Steps) Potential Hazard Potential Incident Existing Control Additional Control Remarks
Seve Freq. Risk Seve. Freq. Risk

hujan, limpasan air),


kekuatan, stabilitas dan
kekakuan sistem -
Perancah yang
dibangun harus sesuai
dengan gambar toko -
Menandai sistem
perancah

Prepared By:  Severity (S) Frequency (F) Risk Rating (RR) Very High High Medium Low
A - Architect (Architect engaged by Samsung C&T) R=SxF 15-25 8-12 4-6 1-3
PM – Project Manager 1 Minor Injury 1 Improbable
CM – Construction Manager 2 Major Single Injury 2 Possible Unacceptability Limits S 5 4 3 2 1 F
LM – Logistics Manager 3 Major Multiple Injuries 3 Occasional More than 5 is unacceptable re-assess task 5 25 20 15 10 5
PLM – Plant Manager 4 Single Death 4 Frequent and preventative actions. 4 20 16 12 8 4
HSEM – HSE Manager 5 Multiple Deaths 5 Regular 3 15 12 9 6 3
PS – Project Supervisor (Samsung C&T / Subcontractor) S = 0 is deemed to be the limit of practicability 2 10 8 6 4 2
SC – Subcontractor of control measures. 1 5 4 3 2 1

Risk assessment complied by:

Risk Assessor

NAME Position Signature Date


Risk Assessment Title: Scaffolding System

R/A Number: - Revision: B


Risk Assessment
Current Risk Final Risk
Item Task (Steps) Potential Hazard Potential Incident Existing Control Additional Control Remarks
Seve Freq. Risk Seve. Freq. Risk

Risk assessment approved by:

Construction

NAME Position Signature Date

HSE Department

NAME Position Signature Date

Management

NAME Position Signature Date


Risk Assessment

Title : Sheet Pile Works

R/A No. :

SCT Construction

Name : Position : Signature : Date :

SCT HSE

Name : Position : Signature : Date :

SCT Site Manager

Name : Position : Signature : Date :

You might also like