- Strengthen foundation by
- Strengthen foundation by using ground compaction,
using ground compaction, deck, and steel material
deck, and steel material - Maintain distance
- Maintain distance between between columns
columns 1.5~1.8m toward 1.5~1.8m toward ledger
ledger direction, and 1.5m direction, and 1.5m toward
toward putlog direction putlog direction
- Make a plan for scaffolding, - Make a plan for
and train on work procedure scaffolding, and train on
- Manager stays at the site work procedure
- Manager stays at the site Check on gound condition, and measures to
Scaffold - Perkuat pondasi dengan prevent columns from sinking
installation and Column installation menggunakan pemadatan - Perkuat pondasi dengan 3 2 6 Periksa kondisi gound, dan langkah-langkah 3 1 3
dismantling tanah, dek, dan material menggunakan pemadatan untuk mencegah kolom tidak tenggelam
tanah, dek, dan material baja
baja - Pertahankan jarak
antara kolom 1,5 ~ 1,8m ke - Pertahankan jarak antara
arah buku besar, dan 1,5m kolom 1,5 ~ 1,8m ke arah
or less
- Install upper platform
work platform after installing wale or
- Fall due to losing balance safety railing
during work platform (Ban installing work
installation platform stepping on
- Fall caused by poorly fixed horizontal struts)
work platform during Check work platform is fixed
and dismantling
scaffold dismantling and before dismantling or repairing
- Check manager is assigned to confirm fall arrest
repair work scaffold
safety equipment is used during work
- Ruang harus 3cm atau
-
installation - Jatuh melalui ruang di kurang - Periksa garis hidup dan blok selama instalasi
platform kerja - Pasang platform atas dan pembongkaran - Periksa manajer
- Jatuh karena kehilangan setelah menginstal wale atau ditugaskan untuk mengkonfirmasi peralatan
keseimbangan selama pagar pengaman keselamatan penangkapan jatuh digunakan
instalasi platform kerja - (Larangan menginstal selama bekerja
Jatuh disebabkan oleh platform kerja menginjak
platform kerja yang tidak struts horizontal)
diperbaiki dengan baik saat Periksa platform kerja sudah
pembongkaran perancah diperbaiki sebelum
dan perbaikan membongkar atau
memperbaiki perancah
Using mandatory PPE and - Brief tool box talk with all involved personnel
Scaffolding - Personnel injury
Pinch gloves prior to commence works.
3 erection/ Pekerja terluka 2 2 4 2 1 2
Terjepit Gunakn wajid APD dan sarung - Lakukan TBM utk semua personel yang terlibat
dismantling -
tangan sebelum pekerjaan dimulai
- Brief tool box talk with all involved personnel
- Clean area from water or prior to commence works.
oil spill on the platform/ - Watch stepping on.
- Personnel injury walking deck. - Clearance area from small part and small tool on
Slipping/Trip
Pekerja terluka - Bersihkan area dari air 2 2 4 the platform/ walking deck. 2 1 2
Terpeleset
- atau tumpahan oli di - Lakukan TBM utk semua personel yang terlibat
platform sebelum pekerjaan dimulai
- Perhatikan langkah kaki
- Bersihkan area dari alat2 yang tidak digunakan
- Using mandatory PPE
- Brief tool box talk with all involved personnel
- Personnel injury - Competent work at height
prior to commence works.
- Fatality - Wear full body harness
Falls - Lakukan TBM utk semua personel yang terlibat
Pekerja terluka - Gunakan wajib APD 2 2 4 3 1 3
Jatuh sebelum pekerjaan dimulai
Fatality - Pekerja yang kompeten
- Mandatory work at height training for scaffolder
- - Gunakan pelindung
Wajib WAH training utk scaffolder
jatuh/bodyharness
- Brief tool box talk with all involved personnel
prior to commence works.
- Personnel injury
- Clear area from small part and small tool on the
Being struck by - Fatality
Using complete PPE working platform.
falling object Pekerja terluka 2 2 4 2 1 2
Gunakan APD lengkap - Lakukan TBM utk semua personel yang terlibat
Benda jatuh Fatality
sebelum pekerjaan dimulai
-
- Perhatikan langkah kaki
- Bersihkan area dari alat2 yang tidak digunakan
Scaffolding Collapse - Personnel injury - Design should be allow for 3 4 12 - Inspection should be undertaken by qualified 3 1 3
- Fatality loads during construction person.
- Property damage (such as workers, - Selected material/ equipment, using good
Pekerja terluka materials, wind, false condition and separated the broken material/
Fatality decks, rain, water runoff), equipment.
- Kerusakan alat strength, stability and - Inspeksi harus dilakukan oleh orang yang
stiffness of system berkualifikasi. - Material / peralatan terpilih,
- Built scaffolding should be menggunakan kondisi baik dan memisahkan
according the shop
material / peralatan yang rusak.
drawing
- Tagging scaffolding system
- Desain harus
memungkinkan muatan
selama konstruksi
(seperti pekerja, bahan,
angin, geladak palsu,
Risk Assessment Title: Scaffolding System
Prepared By: Severity (S) Frequency (F) Risk Rating (RR) Very High High Medium Low
A - Architect (Architect engaged by Samsung C&T) R=SxF 15-25 8-12 4-6 1-3
PM – Project Manager 1 Minor Injury 1 Improbable
CM – Construction Manager 2 Major Single Injury 2 Possible Unacceptability Limits S 5 4 3 2 1 F
LM – Logistics Manager 3 Major Multiple Injuries 3 Occasional More than 5 is unacceptable re-assess task 5 25 20 15 10 5
PLM – Plant Manager 4 Single Death 4 Frequent and preventative actions. 4 20 16 12 8 4
HSEM – HSE Manager 5 Multiple Deaths 5 Regular 3 15 12 9 6 3
PS – Project Supervisor (Samsung C&T / Subcontractor) S = 0 is deemed to be the limit of practicability 2 10 8 6 4 2
SC – Subcontractor of control measures. 1 5 4 3 2 1