0 19-07-2018 IFI AF IW SG
REVISION SHEET
CONTENTS
1. Purpose...................................................................................................................... 4
2. Scope.......................................................................................................................... 4
3. Terms of implementation..........................................................................................4
6. Housekeeping............................................................................................................7
METHOD STATEMENT OF
ROOF PLATFORM INSTALLATION
1. Purpose 1. Tujuan
This method statement is made for Method statement ini dibuat bertujuan untuk
Engineering, Procurement & Construction pelaksanaan pekerjaan pada proyek Pekerjaan
(EPC) Projects Construction of Terminals LPG Engineering, Procurement & Construction (EPC)
Refrigerated by following of safe and secure Proyek Pembangunan Terminal LPG Refrigerated
working steps on the work of Roof Platform dengan mengikuti langkah-langkah kerja yang aman
Installation. dan selamat pada pekerjaan Roof Platform
2. Scope Installation.
This method statement is cover all scope of 2. Ruang Lingkup
work directly or indirectly performed on the Method statement ini mencakup pada semua lingkup
Roof Platform Installation. pekerjaan yang dilakukan pada proses pekerjaan Roof
3. Terms of implementation Platform Installation. Baik pekerjaan yang
Requirements to be fulfilled for the execution berhubungan secara langsung maupun tidak langsung
of the work in this method statement are : yang dilakukan dipekerjaan Roof Platform
a. Permission to work Installation.
Before starting this work, first must obtain 3. Syarat-syarat Pelaksanaan
a work permit from Personnel from Syarat-syarat yang harus dipenuhi untuk pelaksanaan
Operation Construction (EPC) Refrigerated pekerjaan yang ada pada Prosedur Operasi Standar ini
LPG Terminal adalah:
Construction Project, such as: a. Ijin untuk pekerjaan
General work permit Sebelum memulai pekerjaan ini terlebih dahulu
Job safety analysis harus mendapatkan ijin kerja dari Personnel dari
Meetings to discuss of the work to be Operation Construction (EPC) Proyek
done and the impact of safety in the Pembangunan Terminal LPG Refrigerated, seperti :
workplace. General Work Permit (GWP).
b. Tools & Equipment JSA (Job Safety Analysis).
Kinds of equipment that used to support Mengadakan Pertemuan / Meeting untuk
the work of Roof Platform Installation membahas pekerjaan yang akan dilakukan dan
are: dampak keselamatan pada pekerjaan tersebut.
Crawler Crane 100T. b. Peralatan kerja
Shackle. Jenis-jenis peralatan yang digunakan untuk
Webing Sling / Wire Sling.
METHOD STATEMENT OF
ROOF PLATFORM INSTALLATION
Subcontractor