NO WORKPLACE ACTIVITY RISK MITIGATION


1 STORAGE TANK 1. Placement of electrical panels and • Wrong measurement • Coordinate with supervisors
AREA & instruments • Wrong installation • Use PPE according to the work
UNDERGROUND • Marking position of electrical panels and • Scratched hands and feet being done
PATCH instruments • Sprain • Keep flammable materials out of
• Cleaning area • Stumble reach of sparks
• Positioning panels and instruments • Electric shocked • Make sure the fire blanket is
according to layout drawings • Fire available in the hot work area
• Eyes exposed to gram flakes • Provide fire extinguishers in hot
2. Cable Tray Installation • Noise work areas
• Marking & cutting support cable tray • Broken equipment • Check equipment regularly
• Cable tray support fabrication • Respiratory disorders • Install safety signs
• Cable tray support installation
• Cable tray support painting
• Install Cable tray

3. Subduct Installation
• Marking & cutting subduct
• Subduct line inspection & cleaning
• Subduct pulling

4. Cable Installation & Termination


• Marking & cutting cable
• Cable pulling
• Continuity cable
• Cable termination
PT. TRAKINDO UTAMA

ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman

5. Electrical instrument testing


• Cleaning area
• Continuity cable
• Electrical instrument inspection
• Check power supply/control from panel
• Electrical instrument test
2 RISER AREA 1. Cable Tray Installation • Wrong measurement • Coordinate with supervisors
• Marking & cutting support cable tray • Wrong installation • Use PPE according to the work
• Cable tray support fabrication • Scratched hands and feet being done
• Cable tray support installation • Electric shocked • Keep flammable materials out of
• Cable tray support painting • Fire reach of sparks
• Install Cable tray • Eyes exposed to gram flakes • Make sure the fire blanket is
• Noise available in the hot work area
2. Cable Installation • Broken equipment • Provide fire extinguishers in hot
• Marking & cutting cable • Respiratory disorders work areas
• Cable pulling • Falling from a height • Check equipment regularly
• Use PPE full body harness
• Use lifeline on height work
• Install safety signs

3 FUEL PUMP 1. Placement of electrical panels and • Wrong measurement • Coordinate with supervisors
ROOM instruments • Wrong installation • Use PPE according to the work
• Marking position of electrical panels and • Scratched hands and feet being done
instruments • Sprain • Keep flammable materials out of
• Cleaning area • Stumble reach of sparks
PT. TRAKINDO UTAMA

ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman

• Positioning panels and instruments • Electric shocked • Make sure the fire blanket is
according to layout drawings • Fire available in the hot work area
• Eyes exposed to gram flakes • Provide fire extinguishers in hot
2. Cable Tray Installation • Noise work areas
• Marking & cutting support cable tray • Broken equipment • Check equipment regularly
• Cable tray support fabrication • Respiratory disorders • Install safety signs
• Cable tray support installation
• Cable tray support painting
• Install Cable tray

3. Cable Installation & Termination


• Marking & cutting cable
• Cable pulling
• Continuity cable
• Cable termination

4. Electrical instrument testing


• Cleaning area
• Continuity cable
• Electrical instrument inspection
• Check power supply/control from panel
• Electrical instrument test
PT. TRAKINDO UTAMA

ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman

4 ROOFTOP AREA 1. Placement of electrical panels and • Wrong measurement • Coordinate with supervisors
instruments • Wrong installation • Use PPE according to the work
• Marking position of electrical panels and • Scratched hands and feet being done
instruments • Sprain • Keep flammable materials out of
• Cleaning area • Stumble reach of sparks
• Positioning panels and instruments • Electric shocked • Make sure the fire blanket is
according to layout drawings • Fire available in the hot work area
• Eyes exposed to gram flakes • Provide fire extinguishers in hot
2. Cable Tray Installation • Noise work areas
• Marking & cutting support cable tray • Broken equipment • Check equipment regularly
• Cable tray support fabrication • Respiratory disorders • Use PPE full body harness
• Cable tray support installation • Use lifeline on height work
• Cable tray support painting • Install safety signs
• Install Cable tray

3. Cable Installation & Termination


• Marking & cutting cable
• Cable pulling
• Continuity cable
• Cable termination

4. Electrical instrument testing


• Cleaning area
• Continuity cable
• Electrical instrument inspection
• Check power supply/control from panel
PT. TRAKINDO UTAMA

ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman

• Electrical instrument test

5. Genset Testing
• Cleaning area
• Safety device test
• Start up genset
• Running Genset
PT. TRAKINDO UTAMA

ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman

You might also like