3. Subduct Installation
• Marking & cutting subduct
• Subduct line inspection & cleaning
• Subduct pulling
ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman
3 FUEL PUMP 1. Placement of electrical panels and • Wrong measurement • Coordinate with supervisors
ROOM instruments • Wrong installation • Use PPE according to the work
• Marking position of electrical panels and • Scratched hands and feet being done
instruments • Sprain • Keep flammable materials out of
• Cleaning area • Stumble reach of sparks
PT. TRAKINDO UTAMA
ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman
• Positioning panels and instruments • Electric shocked • Make sure the fire blanket is
according to layout drawings • Fire available in the hot work area
• Eyes exposed to gram flakes • Provide fire extinguishers in hot
2. Cable Tray Installation • Noise work areas
• Marking & cutting support cable tray • Broken equipment • Check equipment regularly
• Cable tray support fabrication • Respiratory disorders • Install safety signs
• Cable tray support installation
• Cable tray support painting
• Install Cable tray
ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman
4 ROOFTOP AREA 1. Placement of electrical panels and • Wrong measurement • Coordinate with supervisors
instruments • Wrong installation • Use PPE according to the work
• Marking position of electrical panels and • Scratched hands and feet being done
instruments • Sprain • Keep flammable materials out of
• Cleaning area • Stumble reach of sparks
• Positioning panels and instruments • Electric shocked • Make sure the fire blanket is
according to layout drawings • Fire available in the hot work area
• Eyes exposed to gram flakes • Provide fire extinguishers in hot
2. Cable Tray Installation • Noise work areas
• Marking & cutting support cable tray • Broken equipment • Check equipment regularly
• Cable tray support fabrication • Respiratory disorders • Use PPE full body harness
• Cable tray support installation • Use lifeline on height work
• Cable tray support painting • Install safety signs
• Install Cable tray
ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman
5. Genset Testing
• Cleaning area
• Safety device test
• Start up genset
• Running Genset
PT. TRAKINDO UTAMA
ELECTRICAL INSTALLATION
Pure DC
Jl. Raya Kaliabang, Medan Satria, Kota Bekasi, Jawa Barat
No. Dok
SISTEM Tanggal 06/11/2021
METHOD OF PROCEDURE
MANAJEMEN K3 Revisi
Halaman