NO DATE ACTIVITY
Learning about ultrasonic thickness measurement
procedure (RBT-P-04)
Learning about mindset of engineering towards
client expectation
Monday Operating thickness testing equipment type 38 DL
1
14/12/2020 and probe type E790 (High-Temp) on the step weight
for calibration
Operating thickness testing equipment type 38 DL
and probe type E790 (High-Temp) on pipe material to
thickness measurement
Learning about input data logger to computer from
38 DL
Learning about calibration of ultrasonic bore oxide
Tuesday use Olympus type epoch 650 and probe 20 Mhz type
2
15/12/2020 M2091
Learning about Radiographic examination procedure
(RBT-P-05) and discussion about content of the
report for radiographic examination
Safety induction from PT.Cargill in the meeting
room second floor of PT. ROBUTECH
Wednesday
3
16/12/2020 Learning about direct Visual Examination procedure
(RBT-P-16) than discuss about visual defect and
measurement instrument for measure defect
4 Thursday Reading remote visual examination procedure (RBT-P-
17/12/2020
17)
Discuss about hardness test procedure(RBT-P-09) and
empirical similarity with tensile strength
Learning about operate hardness testing equipment
type equotip 550 with rebound method and type
novotest T-UD3 with Ultrasonic Contact Impedance
method.
Learning about transfer data logger from proceeq
equotip 550 to computer and convert data to excel
document
Safety induction from PT.Cargill about Elevated
work, Confined space, Hot work, and electrical
work.
Friday
5
18/12/2020 Learning about ultrasonic examination
Procedure(RBT-P-01)
Draw Indication Mapping Eddy Current testing for LP
FEEDWATER No.1-4 PT.YTL.