Name of Project : Khaharea khola muhan gari brabotea amlea phat irrigation project

Location : Surygadhi-5,Nuwakot
Various Dates Name of Consultants and Authorised Representatives

Approval of Estimates 28/9/2077 Greentech consultant pvt.ltd


RFP Issue ,2077/09/29 Hints Consult Pvt. Ltd.
Submission of Proposals 1 2/10/2077 Kaustuv Engineering Consultancy Pvt. Ltd.
Submission of Proposals 2 2/10/2077
Submission of Proposals 3 2/10/2077
Approval of Proposal 21/9/2073
LOA issue 21/9/2073 Simrik Consultants (P)Ltd
Request for Agreement 5/10/2077
Date of Agreement 5/10/2077
Work Order
esentatives

Basundhara , kathmandu Rajesh Ghimire Managing Director


Tokha-3,Kathmandu Pankaj neupane Managing Director
Maharajgunj, Kathmandu Mahesh neupane Managing Director

Exhibition Road, Kathmandu-31 Deepa Shrestha Managing Director

mangsir 1,2,3,5,6,7,8,12,16 77.333333333333


1,2,3,5,6,7,13,14,15,16
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
Ref :

Date :
To:
Hints Consult Pvt. Ltd.
Tokha-3,Kathmandu

Subject : Work Order

Dear Sir,

As per the mutual agreement established between your firm and the Water resources and irrigation development
division,Nuwakot for the Consulting Services for Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat
irrigation project (44 ha.) in Surygadhi-5,Nuwakot, it is hereby issued this work order to proceed the work and complete by the
date as mentioned in the agreement.

Thanking for your kind cooperation.

Yours Sincerely

Hari Prasad Guagai


Division Chief
Date : 5/10/2077
To:
Division Chief
Water Resources and Irrigation Development Division Office
Nuwakot

Subject : Letter for Agreement


Dear Sir,

We are contented to inform you that we agree to provide the consulting services for Detailed Feasibility Study of
Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.) within stipulated time as per TOR, as we
were selected for the above.

We are looking for your helpful response in this regard.

Thanking You,

Yours sincerely,

...............................
Pankaj neupane
Managing Director
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

Date :
To:
Hints Consult Pvt. Ltd.
Tokha-3,Kathmandu

Subject : Letter of Acceptance

Dear Sir,

We would like to notify you that your financial proposal submitted for Consulting Services for 'Detailed Feasibility
Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)' in Surygadhi-5,Nuwakot for the
contract price of NRs.= 282500.00 including Value Added Tax @13%, is hereby accepted.

Pursuant to the Section 38 (3) of Public Procurement Act 2063, we would like to invite you to sign the contract
agreement within 15 days.

Yours Sincerely

Hari Prasad Guagai


Division Chief
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

COMPARATIVE CHART OF FINANCIAL PROPOSALS


Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)
Location : Surygadhi-5,Nuwakot

Greentech consultant Kaustuv Engineering


Estimated Hints Consult Pvt. Ltd.
S.N. Particulars Unit Quantity pvt.ltd Consultancy Pvt. Ltd. Remarks

Rate Amount Rate Amount Rate Amount Rate Amount

Consulting Services for Detailed


Feasibility Study of Khaharea khola
muhan gari brabotea amlea phat
irrigation project (44 ha.) in Surygadhi-
5,Nuwakot
1 Job 1 364,000.00 364,000.00 360,000.0 360,000.00 250,000.0 250,000.00 325,000.0 325,000.00

(including remuneration for experts,


support staffs, report preparation, rental
charges for field works, equipments,
transportation costs etc all complete)

Total 311,807.00 360,000.00 250,000.00 325,000.00


VAT @ 13% 40,534.91 46,800.00 32,500.00 42,250.00
GRAND TOTAL 352,341.00 406,800.00 282,500.00 367,250.00
Difference 54459.00 -69841.00 14909.00
Above(+) or Below (-) % 15.46% -19.82% 4.23%

Prepared By Checked By Approved By


Date : 2/10/2077
To:
Division Chief
Water Resources and Irrigation Development Division Office
Nuwakot

Subject : Submission of Financial Proposal


Dear Sir,

We, the undersigned, offer to provide the consulting services for Detailed Feasibility Study of Khaharea khola muhan gari
brabotea amlea phat irrigation project (44 ha.) in accordance with your Request for Proposal and Terms of Reference and
hereby submit our Financial Proposal as per the BOQ provided to us.

Our Financial Proposal shall be binding upon us subject to the modifications resulting from Contract negotiations.

We understand you are not bound to accept any Proposal you receive.
We remain,

Yours sincerely,

...............................
Rajesh Ghimire
Managing Director
Date : 2/10/2077
To:
Division Chief
Water Resources and Irrigation Development Division Office
Nuwakot

Subject : Submission of Financial Proposal


Dear Sir,

It is our pleasure to inform you that we offer to provide the consulting services for Detailed Feasibility Study of
Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.) in accordance with your Request for
Proposal and Terms of Reference and hereby submit our Financial Proposal as per the BOQ provided to us.

We understand you are not bound to accept any Proposal you receive.

Yours sincerely,

...............................
Pankaj neupane
Managing Director
Date : 2/10/2077
To:
Division Chief
Water Resources and Irrigation Development Division Office
Nuwakot

Subject : Financial Proposal


Dear Sir,
We are contented to inform you that we offer to provide the consulting services for Detailed Feasibility
Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.) in accordance with
your Request for Proposal and Terms of Reference and hereby submit our Financial Proposal as per the
BOQ provided to us.
We understand you are not bound to accept any Proposal you receive.
We are looking for your helpful response in this regard.

Yours sincerely,

...............................
Mahesh neupane
Managing Director
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
Ref :

Date : ,2077/09/29
To:
Greentech consultant pvt.ltd
Basundhara , kathmandu

Hints Consult Pvt. Ltd.


Tokha-3,Kathmandu

Kaustuv Engineering Consultancy Pvt. Ltd.


Maharajgunj, Kathmandu

Subject : Request for Proposal

Dear Sir,

You are requested to submit the Financial Proposal as per the attached Bill of Quantities for the Consulting Services for
Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.) in Surygadhi-
5,Nuwakot. The Terms of Reference (TOR) for the consulting service is attached herewith.

Yours Sincerely

Hari Prasad Guragai


Division Chief
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
Ref :

Date : ,2077/09/29
To:
Greentech consultant pvt.ltd
Basundhara , kathmandu

Subject : Request for Proposal

Dear Sir,

You are requested to submit the Financial Proposal as per the attached Bill of Quantities for the Consulting Services for
Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.) in Surygadhi-
5,Nuwakot. The Terms of Reference (TOR) for the consulting service is attached herewith.

Yours Sincerely

Hari Prasad Guragai


Division Chief
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
Ref :

Date : ,2077/09/29
To:
Hints Consult Pvt. Ltd.
Tokha-3,Kathmandu

Subject : Request for Proposal

Dear Sir,

You are requested to submit the Financial Proposal as per the attached Bill of Quantities for the Consulting
Services for Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project
(44 ha.) in Surygadhi-5,Nuwakot. The Terms of Reference (TOR) for the consulting service is attached
herewith.

Yours Sincerely

Hari Prasad Guragai


Division Chief
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
Ref :

Date : ,2077/09/29
To:
Kaustuv Engineering Consultancy Pvt. Ltd.
Maharajgunj, Kathmandu

Subject : Request for Proposal

Dear Sir,

You are requested to submit the Financial Proposal as per the attached Bill of Quantities for the Consulting Services for
Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.) in Surygadhi-
5,Nuwakot. The Terms of Reference (TOR) for the consulting service is attached herewith.

Yours Sincerely

Hari Prasad Guragai


Division Chief
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

BILL OF QUANTITIES
Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)
Location : Surygadhi-5,Nuwakot
Unit Rate in NRs
Total Amount in
S.N. Particulars Unit Quantity
NRs
In Figures In Words

Consulting Services for Detailed Feasibility Study of


Khaharea khola muhan gari brabotea amlea phat
irrigation project (44 ha.) in Surygadhi-5,Nuwakot
A Job 1

(including remuneration for experts, support staffs,


report preparation, rental charges for field works,
equipments, transportation costs etc all complete)

B Total

C VAT @ 13% of C

D GRAND TOTAL

Sign and Seal of the Consultant Sign and Seal of the Client
Remarks

Sign and Seal of the Consultant Sign and Seal of the Client
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
FY : 2077/78

ESTIMATE SANCTION FORM


FORM FOR FORWARDING COST ESTIMATES

Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat
1 Description of work :
irrigation project (44 ha.)
2 Location : Surygadhi-5,Nuwakot
3 Estimated Amount : 364,000.00

4 Certified:
a. The drawings and measurements of the proposed work are based on field verification.
b. The design and estimate of the proposed work is based on departmental norms and general engineering
principles in practice.
c. The proposed estimate is prepared on the basis of approved rate and rate analysis norms.
d. All the numbers and arithmetical calculations carried out in this estimate are correct.

Submitted by :

........................................
Sub Engineer

5 Checked and Recommended


The submitted cost estimates, drawings are correct in accordance with the approved departmental norms
and follow the general engineering principles in practice; hence is recommended for approval.

………………..……….
Engineer
6 Approved
The Cost Estimate of the work / services with total cost NRs. ………………………………………

…….………………….…………………………………………….……is approved for Implementation.

...................................
Division Chief
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

ABSTRACT OF COST
Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)
Location : Surygadhi-5,Nuwakot

Unit Rate in Total Amount in


S.N. Particulars Unit Quantity Remarks
NRs NRs

A Remuneration
I Professional Staff

1 Irrigation / Hydraulic Engineer P-month 0.75 169,000.00 126,750.00

2 Agriculturist P-month 0.17 169,000.00 28,730.00


3 Surveyor P-month 0.19 54,000.00 10,260.00

4 GIS Expert P-month 0.20 54,000.00 10,800.00

Sub Total of I 1.31 176,540.00

II Support Staff

1 Sub-Engineer P-month 0.88 54,000.00 47,520.00

2 Auto CAD Expert P-month 0.40 54,000.00 21,600.00

3 Assistant (Sub-Engineer Level) P-month 0.50 39,000.00 19,500.00

4 Office Assistant P-month 0.85 21,900.00 18,615.00

5 Labour P-month 1.28 21,900.00 28,032.00

Sub Total of II 2.63 135,267.00

B Total (A ) 311,807.00
C Contingencies @ 4% of B 12,472.28

D VAT @ 13% of C 40,534.91

E GRAND TOTAL 364,814.19


Say 364,000.00
Note: The monthly renmuneration includes the Consultant's Overhead.

Prepared By Checked By Approved By


Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

Summary of Manpower Required for Field and Office Works and Remuneration
Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)
Location : Surygadhi-5,Nuwakot

Unit rate in Field Works Office Works Total


S.N. Position
NRs. M-days P-Month Amount M-days P-Month Amount M-days P-Month
1 Irrigation / Hydraulic Engineer 169,000.00 - - - 22.38 0.75 126,750.00 22.38 0.75
2 Agriculturist 169,000.00 2.00 0.07 11,830.00 3.00 0.10 16,900.00 5.00 0.17
3 Engineer / Surveyor 54,000.00 5.60 0.19 10,260.00 0.00 - 5.60 0.19
4 GIS Expert 54,000.00 - - - 6.00 0.20 10,800.00 6.00 0.20
5 Sub Engineer 54,000.00 6.60 0.22 11,880.00 19.76 0.66 35,640.00 26.36 0.88
6 AutoCAD Expert 54,000.00 - - - 12.00 0.40 21,600.00 12.00 0.40
7 Assistant 39,000.00 2.00 0.07 2,730.00 13.00 0.43 16,770.00 15.00 0.50
8 Office Assistant 21,900.00 25.38 0.85 18,615.00 25.38 0.85
9 Labour 21,900.00 38.50 1.28 28,032.00 38.50 1.28
TOTAL 64,732.00 247,075.00

Prepared By Checked By Approved By


Provincial Government
Bagmati Province
Physical Infrastructure Development
nd Irrigation Development Division Office
Nuwakot

red for Field and Office Works and Remuneration


ola muhan gari brabotea amlea phat irrigation project (44 ha.)

Total
Amount
126,750.00
28,730.00
10,260.00
10,800.00
47,520.00
21,600.00
19,500.00
18,615.00
28,032.00
311,807.00

Prepared By Checked By Approved By


Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

DETAILED QUANTITY ESTIMATE


Calculation of Manpower required for Office work
Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)
Location : Surygadhi-5,Nuwakot
1 Project Area 4 Drainage Canal Length
Project Location = Hills Major Drains = - km
Project Type = Minor Drains = - km
Command Area = 44 ha 5 Canal length for Geological study = 1.00 km
2 Headwork Site 6 CD works
River Width = 20 m Total numbers of CD = 4 nos
River Type = Medium Span > 10 m = 4 nos
3 Canal Length Span <=10 m = 0 nos
Major Canal = 1.00 km nos 7 Other Canal Structures
Minor Canal = 0.50 km 3 nos Major structures = 3 nos
Minor structures = 8 nos
Small structures = 0 nos
Office Work

Environmental

Sub Engineer
Hydraulic Er.
Performance

Hydrologist /

Agriculturist

GESI Expert
No. of days

TL / Senior

Sociologist
Economist

GIS Expert

Assistant /
Irrigation /

Structural

Geologist

Sediment

Assistant
AutoCAD
Irrigation

Engineer

Analyst

Labour
Expert
Expert

Expert
S.N. Particulars

citeria

Office
1 Desk Study
Data collection, compilation and report
a 5.0 days for Project 1.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.0 1.0 0.0 1.0
presentation
per day 1.0 1.0 1.0 1.0 1.0
2 Headwork Site
a Contour, L-Section and X-Section 5.0 days for Project 1.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.0 1.0 0.0 1.0
per day 1.0 1.0 1.0 1.0 1.0
3 Canal Alignment
a Layout 1.0 days 3.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 3.0 3.0 0.0 3.0
per day 1.0 1.0 1.0 1.0 1.0
b Contour, L-section & X-section 2.0 days 6.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.0 12.0 0.0 6.0
per day 1.0 1.0 2.0 1.0
c Design and Drawing
Design and Drawing (major) 6.0 days 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
per day 1.0 1.0 1.0 2.0 1.0
Design and drawing (minor) 3.0 days 1.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 1.0 2.0 0.0 1.0
per day 1.0 1.0 1.0 2.0 1.0
d Estimate (minor / major) 4.0 km/day 0.38 0.0 0.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.76 0.00 0.38
per day 1.0 2.0 1.0
4 Command Area
a Traverse Line 2.0 days 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
per day 1.0 1.0 1.0 2.0 1.0
b Topography 25.0 ha/day 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
per day 1.0 1.0 1.0 2.0 1.0
c Agricultural Study 3.0 days 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 3.0 3.0
per day 1.0 1.0 1.0
5 Miscellaneous

Report Preparation including Rate


a Analysis, Planning and Management for 10.0 days 10.0 0.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 10.0 10.0
Construction and Economical Analysis

per day 1.0 1.0 1.0

Total 0 22.38 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 6.00 12.00 19.76 13.00 25.38

Prepared By Checked By Approved By


Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

DETAILED QUANTITY ESTIMATE


Calculation of Manpower Required for Field Works
Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)
Location : Surygadhi-5,Nuwakot
1 Project Area 5 CD works
Project Location = Hills Total numbers of CD = 4.00 nos
Project Type = Span > 100 m = - nos
Command area = 44 ha Span <100 m and >50 m = - nos
2 Headwork Site Span <50 m and <20 m = 2.00 nos
River Width = 20 m Span <20 m and >10 m = 2.00 nos
River Type = Medium Span < 10 m = - nos
3 Canal Length 6 Canal length for Geological study = 1.00 km
Major Canal = 1.00 km 7 Drainage Canal Length
Minor Canal = 0.50 km Major Drains = - km
4 Canal Structures Minor Drains = - km
Major structures = 3 nos 8 Drainage Structures
Minor structures = 8 nos Major structures = - nos
Small structures = 0 nos Minor structures = - nos
Field Work

Environmenta

Engineer / Sr.

Sub Engineer
Hydraulic Er.

Hydrologist /
Performance

Agriculturist

GESI Expert
No. of days

TL / Senior

Economist

Sociologist
Irrigation /

Geologist

Sediment

Assistant
Irrigation

Surveyor
l Expert
Analyst

Labour
Expert
S.N. Particulars

citeria
1 Head Work Site
a Site Selection 6.0 km/day 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.4
per day 1 1 4
b L-Section and X-Section Survey 1.5 days for Medium river 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 1.5 0.0 10.5
per day 1 1 7
2 Canal Alignment
a Layout Survey 1.0 day 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 2.0 0.0 5.0
per day 1 2 5
b L-Section Survey 3.0 km/day 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5 0.0 4.0
per day 1 1 8
c X-Section Survey 1.5 km/day 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.3 0.0 2.4
per day 1 1 8
d Bench Mark Survey 10.0 BM/day 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 1.0
0.5 km c/c per day 1 1 10
3 Command Area Survey

a Traverse Line Survey 2.0 days for 44 ha 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.0 0.0 12.0
per day 1 1 6
b Topographic Survey 20.0 ha/day 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
per day 1 1 6
c Bench Mark Survey 10.0 BM/day (1BM/50 ha) 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 1.2
per day 1 1 12
d Agricultural Study 2.0 days for 44 ha 2.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0 2.0 2.0
per day 1 1 1

Total 0.00 0.00 0.00 0.00 0.00 0.00 2.00 0.00 0.00 5.60 6.60 2.00 38.50

Prepared By Checked By Approved By


Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot

Canal and Structure Data


Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project (44 ha.)

Location : Surygadhi-5,Nuwakot
1 Project Area
Project Location Hills
Command area 44 ha
2 Headwork / Intake Site
2.1 River Width 20 m
2.2 River Type Medium
2.3 Project Type
3 Irrigation Canal / Pipe Network
1.1 Main Canal
Nos. of primary level canals 1 nos
Total length Primary Level Canals 1 km
1.2 Secondary Canals
Nos. of secondary canals 2 nos.
Total length of Secondary Canals 0.5 km
1.3 Tertiary Canals
Nos. of Tertiary Canals 0 nos.
Average length of Secondary Distribution Mains km/ha
Total length of Secondary Distribution Mains - km
4 Structures
4.1 Main Canal
Major Structures
Intake 1 nos
Road Crossing 2 nos
CD works 2 nos
Total nos. of primary level major structures 5 nos
Minor Structures
Intake 1 nos
Road Crossing nos
CD works 2 nos
Miscelleneous (outlets, footbridges, escapes etc) 5 nos
Total nos. of primary level minor structures 8 nos
4.2 Secondary Canals
Road Crossing nos
CD works nos
Total nos. of primary level major structures 0 nos
4.3 Tertiary Canals
Road Crossing 0 nos
CD works 0 nos
Unit outlets 0 nos
Total nos. of secondary level minor structures 0 nos
7 Summary of Quantities
1 Canal length
Major canal 1.00 km
Minor canal 0.50 km
2 CD Structures
Span > 100 m 0 nos
Span <= 100 m and > 50 m 0 nos
Span <= 50 m and > 20 m 2 nos
Span <= 20 m and > 10 m 2 nos
Span <= 10 m 0 nos
2 Canal structures
Major structures (Main Canal level) 3 nos
Minor structures (Seocndary level) 8 nos
Small structures (Tertiary level) 0 nos
3 Drainage length
Major drain 0.00 km
Minor drain 0.00 km
4 Drainage structures
Major structures (Secondary Drain level) 0 nos
Minor structures (Tertiary and Collector Drain level) 0 nos
C25: RAJ KUMAR:
0.04 km/ha for tertiary canals
Provincial Government
Bagmati Province
Ministry of Physical Infrastructure Development
Water Resources and Irrigation Development Division Office
Nuwakot
Calculation of Rates of Manpower
Name of Work : Detailed Feasibility Study of Khaharea khola muhan gari brabotea amlea phat irrigation project
(44 ha.)
Location : Surygadhi-5,Nuwakot

DOI Rate for Rate to be


S.N. Manpower SCAEF Rate Unit
076/077 adopted

1 TL / Senior Irrigation Expert. 203,000.00 203,000.00 man-month


2 Irrigation / Hydraulic Engineer 169,000.00 169,000.00 man-month
3 Structural Engineer 169,000.00 169,000.00 man-month
4 Mechanical Engineer 169,000.00 169,000.00 man-month
5 Electrical Engineer 169,000.00 169,000.00 man-month
6 Water Management Engineer 169,000.00 169,000.00 man-month
7 Hydro-Geologist 169,000.00 169,000.00 man-month
8 Hydrologist / Sediment Analyst 169,000.00 169,000.00 man-month
9 Environmental Expert 169,000.00 169,000.00 man-month
10 Economist 169,000.00 169,000.00 man-month
11 Agriculturist 169,000.00 169,000.00 man-month
12 Sociologist 169,000.00 169,000.00 man-month
13 GESI Expert 169,000.00 169,000.00 man-month
14 Senior Surveyor / Engineer 169,000.00 169,000.00 man-month
15 Surveyor 54,000.00 54,000.00 man-month
16 GIS Expert 54,000.00 54,000.00 man-month
17 Sub Engineer 54,000.00 54,000.00 man-month
18 Auto CAD Expert 54,000.00 54,000.00 man-month
19 Assistant (Sub Engineer Level ) 39,000.00 39,000.00 man-month
20 Office Assistant 21,900.00 21,900.00 man-month
20 Labor 21,900.00 21,900.00 man-month

Prepared By Checked By Approved By