LESSON 1
Site investigation
3-
4-
5-
LESSON 2
Reba Plan of work
Feasibility study
Site investigation Flooding
Site Reconnai!ance
In-situ testing
Sands Clay
Vane test
Why?
How?
Construction types
WEEK 3
Construction types
Masonry
External walls
Thermal
Conclusion
Timber frame
Historical context
Advantages
Disadvantages
Fire prevention
Construction types
WEEK 3
Sip - why
Benefits
Construction types
WEEK 3
Oak frame
Steel frame
Cob
Uses
Introduction to Construction materials
Material properties
Physical properties
Physical properties
Hardness
Mechanical Mechanical
properties properties
Introduction to Construction materials
Chemical properties
Chemical
properties
Dimensional coordination
Measurements
Measurements
Wastage
Product certification
How to check material & product properties?
Testing Standards
CE Markings
Agrément Certification
Kite mark
Foundations
TERMINOLOGY
Soil classification
Triangular chart
LECTURE 6 Week 5
Contaminated Land
Foundations
Archaeological Remains
Principles of design
DRAINAGE
Above ground drainage
Two pipe system Single stack system
Traps
Siphonage
DRAINAGE
Underground Drainage Sustainable Urban Drainage
Drains
Formats
Sewers
Materials
Building Fabric & Thermal
Performance
Why do we build? Functional Requirements 1:-
Structural Stability
Passivhaus
Building Regulations
Functional Requirement 6
Foundation
Footing
Wall footings
Conventional Strip
Foundations
Deep strip
Pad Foundation
Ground & intermediate Floor construction
Functional Requirements
Floor types
Ground Floor
Solid ground floor Suspended Timber Ground Floor
Construction sequence
Upper floors
Functional requirements Upper floor structural materials
Lesson 2 Technology 1 Drawing