You are on page 1of 33

R

Know what'sbelow.
Call before you dig.

INSTALLATION ORDER NUMBER 17-0841883-00


ABANDONMENT ORDER NUMBER 17-0841884-00
PROJECT ID 17-48840 09/24/2049

HIDDEN RD, ANDOVER


JOB TYPE: REPLACEMENT (557/558)

PROJECT INFORMATION VICINITY MAP SHEET INDEX


DWG. DESCRIPTION
FIELD ENGINEER/TECHNICIAN: K MURRAY
T-1 TITLE SHEET
CONSTRUCTION FLL: K WELLS / J ANGELARI
GN-1 GENERAL NOTES
PERMITS: CITY PERMIT
STATE PERMIT ENV-1 ENVIRONMENTAL PLAN NARRATIVE PROPOSED
ENVIRONMENTAL PERMIT O-1 OVERVIEW SHEET
TCC/LOA: 8400 L-1 - L-2 LAYOUT PLANS
REVISIONS
COUNTY: ESSEX (009) D-1 CONSTRUCTION DETAILS
TAX DISTRICT/TOWNSHIP ID: 0000401
MAP/GRID NUMBER: AND-063
SYSTEM NUMBER(S): 80001012
24 HR. EMERGENCY LINE: COLUMBIA GAS OF MASSACHUSETTS
1-800-525-8222 PROJECT SUMMARY TABLE 0 7/5/19 INITIAL ISSUE - PERMIT COPY

PROPOSED INSTALLATION PROPOSED ABANDONMENT REV. # DATE DESCRIPTION

LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE DESIGNED BY K MURRAY 7/3/19 978-802-5728
DRAWN BY K MURRAY 7/3/19 978-802-5728
1,600' 6" PH 790' 8" CI X X X
CHECK'D BY
730' 4" PH 70' 6" CI AS-BUILT BY X X X
930' 4" CI NAME DATE PHONE #
55' 8" PL SITE NAME:
20' 6" PL
455' 6" ST INST# 17-0841883-00
N 2,330 TOTAL INSTALLATION (FEET) 2,320 TOTAL ABANDONMENT (FEET) ABAN# 17-0841884-00
PROPOSED GAS SERVICES PROJECT ID# 17-48840
HIDDEN RD, ANDOVER
REPLACEMENTS TIE OVERS TOTAL SERVICES METER OUTS ANDOVER
, ESSEX (009)
ESTIMATED GAS SERVICES 10 12 10 7

PROJECT DESCRIPTION DRAWING TITLE:

THIS PROJECT IS TO REPLACE APPROXIMATELY 2300' OF CAST IRON AND BARE STEEL GAS MAIN ON HIDDEN ROAD,
GARDNER AVE, AND FORBES LANE IN ANDOVER. THIS PROJECT IS PLANNED DUE TO A MUNICIPAL PAVING PROJECT ON TITLE SHEET
HIDDEN ROAD AND GARDNER AVE.

DRAWING NO:

T-1
2/27/19
General Notes

1. The proposed gas main shown is approximate and is subject to change. 6. Prior to beginning any excavation on site, the person responsible for earth moving shall notify utility owners of their intent to
excavate and to have the exact locations of the utility lines marked by contacting the one call center in their state subject to any
2. Property lines, structures, street lines, etc. were compiled using the NiSource GIS and are to be considered approximate. applicable state advance notification requirements.

3. Existing utilities, where shown, have been compiled from above ground evidence only and are to be considered approximate. 7. Proposed or completed gas facility installation location references may be indicated by a combination of the following codes:
NiSource does not guarantee the location of the underground utilities shown or that all existing utilities and/or subsurface
structures are shown. F - FRONT
BK - BACK
4. This project will adhere to all applicable federal, state or local permitting requirements for abandonment and installation of natural L - LEFT
gas pipelines. All Federal, State, and Local codes and standards will be adhered including, but not limited to, the following: R - RIGHT
Code of Federal Regulations (CFR) B - BUILDING EDGE
49 CFR 192 Pipeline Safety Regulations CLP - CENTER OF PAVEMENT 09/24/2049
29 CFR 1910 Occupational Safety and Health Administration (OSHA) CLR - CENTER OF RIGHT-OF-WAY
American Society of Mechanical Engineers (ASME) CEL - CENTER OF EASTBOUND LANE
ASME B31.8 Gas Transmission and Distribution Piping Systems CWL - CENTER OF WESTBOUND LANE
CNL - CENTER OF NORTHBOUND LANE
5. All NiSource design codes and standards will be adhered to as applicable. These standards include but are not limited to the CSL - CENTER OF SOUTHBOUND LANE
following (note state-specific designations where applicable): CU - CURB
GS 1100.010(IN, KY, MA, MD, OH, PA, VA) Locating Gas Facilities D - DRIVEWAY EDGE
GS 1100.040(MA and VA only) Damage Prevention When Using Conventional Excavation Technologies EP - EDGE OF PAVEMENT
GS 1100.050(IN, OH, VA) Damage Prevention - Using Trenchless Technology ES - EDGE OF SIDEWALK
GS 1170.010(IN) Gas Control Room Management PL - PROPERTY LINE
GS 1210.010(MA) Nondestructive Testing And Visual Inspection
GS 1300.010 Fusion And Mechanical Joining
GS 1301.010 Plastic Pipe Fusion And Mechanical Joining Qualification Of Personnel
GS 1302.010(VA) Butt Fusion Joining
GS 1304.010 Electrofusion Joining
GS 1320.010 Mechanical Coupling Connections
GS 1323.010 Flange Connections
GS 1400.010 Corrosion Control - General
GS 1410.010(VA) Metallic Pipeline Exposures
GS 1420.035 Coating Repair Methods For Mill Applied Coatings
DRAWING LEGEND
GS 1420.040 Coating Methods For Girth Welds, Fittings, Risers & Other Below Grade Appurtenances
GS 1420.410 Corrosion Control - Inspection Of Steel Pipe Coating
GS 1420.510 Installation Of Galvanic Anodes Gas Main Symbology Gas Facility Symbology
GS 1420.520 Installation Of Test Stations Existing Gas Main
Existing Gas Main to Be Abandoned
4"GV
4"PV
Gas Valve (Gate - GV, Plug - PV, PE Ball - BP, ST Ball - BV)
Critical Gas Valve
PROPOSED
GS 1430.320 Ultrasonic Thickness Gauge
Proposed Gas Main 2"HVTT High Volume Tapping Tee
GS 1500.010(MA, OH) Pressure Testing REVISIONS
Proposed Gas Main Uprate 2"SST Pressure Control Fitting - ShortStopp Tee
GS 1670.020(IN, KY, MA, MD) Odor Level Monitoring Gas Main Material/Pressure Label References 4"SPH Pressure Control Fitting - Spherical Tee
GS 1670.040 Pipeline Conditioning New Pipelines CS Coated Steel Gas Main 6"MF-BO Pressure Control Fitting - Mueller Bottom-out
GS 1680.010 Tie-Ins And Tapping Pressurized Pipelines CI Cast Iron Gas Main 6"MF-SO Pressure Control Fitting - Mueller Side-out
GS 1680.020 Plastic To Steel Transition Connections BS Bare Steel Gas Main 4"MF-FT Pressure Control Fitting - Mueller Flange Tee
GS 1680.040 Squeeze Off Procedure For Plastic Pipe WI Wrought Iron Gas Main 4"SS Pressure Control Fitting - ShortStopp
GS 1680.050 Squeeze Off Guidelines For Steel Pipe PH High Density Polyethylene Gas Main 4"MF Pressure Control Fitting - ShortStopp
GS 1690.010 Purging
PM Medium Density Polyethylene Gas Main 6x4 POLYTAPPolytapp Side Saddle Fitting
LP Low Pressure Transition
GS 1708.020(IN, KY, MA, MD, PA) Leakage Surveys IP Intermediate Pressure End Cap
GS 1740.010(MA, OH, PA, VA) Abandonment Of Facilities MP Medium Pressure Riser 0 7/5/19 INITIAL ISSUE - PERMIT COPY
GS 1740.012(MA, PA) Abandoning Facilities - Service Tee Removal HP High Pressure Reducer
GS 1742.010(VA) Discontinuing Gas Service Gas Main Installation Method Label References EM Electronic Marker REV. # DATE DESCRIPTION
GS 1754.010(KY, OH) Operation And Maintenance Of Pressure Gauges AT Attached TWS Flush-mounted Tracer Wire Station
BH Bridge Hanger Post Pipeline Marker with Tracer Wire DESIGNED BY K MURRAY 7/3/19 978-802-5728
GS 1770.010 Prevention Of Accidental Ignition DRAWN BY K MURRAY 7/3/19 978-802-5728
BLGH Building Hanger MM Gas Main Marker without Tracer Wire
GS 1782.010(MA) Protecting Cast Iron Pipelines DB Directional Bore W Test Well CHECK'D BY X X X
GS 3000.020(VA) Inspection Of Materials IS Inserted R Regulator Station AS-BUILT BY X X X
GS 3000.900 Work Site Restoration OC Open Cut R Single Customer Regulator NAME DATE PHONE #
GS 3010.030 Bends And Elbows PB Pneumatic Bore M Meter
PL Plowed MR
Meter with Regulator SITE NAME:
GS 3010.050(IN, MA) Installation Of Pipe In A Ditch
GS 3010.060(IN) Installation Of Plastic Pipe RT Roof Top T
P Test Point (Station)
(E) Existing T Gas Service Tie-over INST# 17-0841883-00
GS 3010.080(MA, OH, VA) Underground Clearance (P) Proposed R Gas Service Replacement ABAN# 17-0841884-00
GS 3010.090(IN, MA, PA, VA) Cover Meter Move Out
GS 3010.100(VA) Transmission Lines And Distribution Mains - Trenchless Technology
MMO
PROJECT ID# 17-48840
W1 Weld Location Swing Tie Symbology HIDDEN RD, ANDOVER
GS 3010.102(VA) Directional Boring T Telephone Manhole ANDOVER
, ESSEX (009)
GS 3010.210(MA only) Use Of End Caps On Steel Pipe T1 Gas Main Tie-in Location D Drain Manhole
GS 3020.030 Service Line Connections To Main Piping E Electric Manhole
A1 Gas Main Abandonment Location Catch Basis
HSE 4100.010 Hazardous Atmosphere Considerations DRAWING TITLE:
S Sewer Manhole
HSE 4100.020 Work Zone Traffic Protection Fire Hydrant
HSE 4100.040 Excavation (Trenching) Safety Utility Pole
HSE 4120.010 Welding And Cutting Property Marker GENERAL NOTES
HSE 4200.020 Protective Footwear T Telephone Pedestal
HSE 4200.030 Eye And Face Protection C Television Pedestal
HSE 4200.040 Hand Protection
U Unknown Manhole
WB
Water Box
HSE 4200.050 Head Protection WG
Water Gate
DRAWING NO:
HSE 4440.030(KY, MA, MD, OH, PA, VA) Spoil Handling During Excavations E Electric Pedestal
ON 18-09 Additional Requirements For Tie-Ins Involving Low Pressure Facilities
GN-1
IP
Iron Pin
WM Columbia Gas Welding Manual Light Pole

2/27/19
Environmental Plan Narrative Erosion Control Blanket/Matting: Erosion control blanket is a straw matting that can be rolled out over a disturbed area and secured
using pins or stakes. This blanket may be used on steeper sloped areas to hold seed and mulch in place. Erosion control blanket can
1. A Site-Specific Erosion Control plan is required for this project. This plan, with the project Environmental Compliance Plan (ECP), also be useful in protecting the seed and holding moisture in dry, windy areas. Erosion control blanket must be used in restoration
provide information regarding all environmental requirements. adjacent to streams or wetlands. It should also be used in areas with high erosion potential (e.g. steep slopes, embankments, ditch
lines).
2. The project ECP and the site-specific EC plan must be reviewed with environmental, construction and contractor personnel prior to
the start of construction activities. This includes any tree clearing activities required prior to the start of pipeline construction. Maintenance: The job site shall be inspected by construction personnel at the end of each day to ensure that any controls are
functioning and that the work area is sufficiently contained. Required maintenance of NiSource installed controls or corrective actions
3. All NiSource construction activities must be performed in accordance with the NiSource Environmental Construction Standards shall be performed immediately or within the time frames noted by an Environmental Inspector.
(ECS) and the project ECP.
Measures previously installed by third parties shall be maintained by NiSource under the following circumstances:
4. All NiSource construction projects must have a clearly defined work area or limits of disturbance (LOD). The LOD includes the 1. The control is not properly functioning and is being used to contain sediment and prevent erosion immediately adjacent to
permitted project area and any additional work space needed for laydown yards, soil stockpiling areas, access routes, etc. Identify NiSource work.
the LOD in the field with NRP or the Environmental Inspector before work starts and notify NRP of any additional work space that 2. Damage to the control is the result of work performed by NiSource. 09/24/2049
may be needed.
Projects within Third Party Construction Sites:
Description and Minimum Requirements for Erosion and Sediment Control Measures
In situations where NiSource projects are being completed within a larger project or development area, NiSource is still responsible for
The information provided below outlines the purpose of common EC measures and how and when they shall be applied to the site. ensuring our work is in compliance with all laws and regulations. This must be documented under one of the following scenarios:
Figures showing installation details are provided in the NiSource ECS manual. Requirements outlined in the site-specific EC plan must 1. Prior to the start of construction activities, a qualified NiSource representative will verify that all NiSource work activities will be
be implemented in addition to these minimum requirements. covered under the third party's approved site plan and/or SWPPP and that the appropriate EC measures are installed and
functioning. This review will be documented and retained in the project records.
Perimeter Barriers: Perimeter barriers, such as silt fence and compost filter sock may be installed along the outside of the project area 2. If the EC measures required by the third party's approved site plan are not present or functioning, NiSource construction activities
or around sensitive areas to slow and filter sediment laden runoff before it leaves the work area. may commence under the following conditions:
a. All disturbed NiSource work areas are stabilized at the end of the work day.
These measures are required in the following areas: b. Any NiSource work areas requiring disturbance over one working day (e.g. stockpiles, tie-in pits) will require perimeter
1. When work is occurring adjacent to streams, wetlands or other sensitive areas. controls or temporary mulching or covering on a daily basis.
2. Around HDD bore pits adjacent to streams, wetlands or other sensitive areas. c. The overall project SWPPP is present/available and all NiSource activities remain within compliance of all outlined
3. Around soil stockpiles that will remain uncovered for greater than one working day. requirements.
4. Where any work areas or excavations will remain disturbed (unstabilized) for longer than one working day. d. Any additional permits required for the NiSource work are obtained.
e. The third party permit holder is informed of the site deficiencies and NiSource's plan to complete the work.
Inlet Protection: Storm drain inlet protection, both curb and drop inlets, are required in active work areas where there is functioning
storm sewer to slow and filter water draining into the system. In areas where the work area is adjacent to, or water from the site flows Final stabilization measures shall be completed as described in the applicable Temporary or Permanent Stabilization sections above to
onto a paved roadway, inlet protection will be placed in all functioning outlets. match the adjacent conditions of the third party project.

Check dams: Rock check dams may be installed in areas of concentrated flow in a ditch line to slow runoff and allow sediment to settle In addition to the preceding methods, the following erosion control measures will be used on a daily basis regardless of whether the
prior to discharge. Check dams may also be used as a break in a perimeter barriers where runoff is concentrated and perimeter work area is inside third party controls:
barriers are insufficient to detain runoff. Check dams are required when working in ditch lines where work will remain active for more
than 1 day and as a supplementary measure determined to be needed during construction.
· Perimeter barriers around bore pits at wetland/ stream bores PROPOSED
· Dewatering activities using a filter bag or other approved method
· Roadway cleaning daily for sediment tracked onto paved surfaces
Dewatering Devices: A filter bag, or other approved dewatering device, must be used during all dewatering activities to remove
REVISIONS
suspended sediment from the water prior to discharge into the environment. Dewatering devices must be used in areas including, but Wetland and Stream Crossings, Sensitive Areas:
not limited, to trench or pit dewatering and treatment of excess HDD mud.
All wetlands, stream crossings and other sensitive areas (e.g. managed lands, parks, and endangered species habitat areas) must be
Construction Entrances: In cases where vehicular access from the work area occurs at a single point for multiple days, a rock marked in the field with caution flagging prior to the start of clearing activities and/or land disturbing activities.
construction entrance must be installed. A stabilized construction entrance may not be feasible during construction within or
immediately adjacent to a roadway as the construction project moves linearly along the road. In these cases, care should be taken to Any requirements for construction within these areas will be outlined within the ECP and the attached permit documents. These permits
minimize vehicular access and the roadway shall be regularly cleaned of tracked sediment throughout the work day. Alternatives to rock must also be reviewed prior to the start of construction.
entrances include the placement of timber mats or similar non erodible materials. Use of these alternatives must be approved by the
NRP group or environmental inspector. 0 7/5/19 INITIAL ISSUE - PERMIT COPY

REV. # DATE DESCRIPTION


Trench Plugs/Breakers: Trench breakers consist of sand or earth filled sacks placed at intervals along the pipeline trench. Trench ENVIRONMENTAL EROSION AND SEDIMENT CONTROL SYMBOLOGY
breakers may be installed at intervals within the trench to reduce water velocity along the pipeline bedding that can result in erosion DESIGNED BY K MURRAY 7/3/19 978-802-5728
ENVIRONMENTAL EROSION CONTROL BLOCKS
DRAWN BY K MURRAY 7/3/19 978-802-5728
during construction and after backfilling. Trench plugs consist of clay, bentonite or other impermeable material and are required (on Env-ErosionControl layer)
X X X
CHECK'D BY
adjacent to stream and wetland crossings to ensure that the flow of water along the trench line does not impact the waterbody. AS-BUILT BY X X X
Inlet Protection IP Temporary Stabilization TAGNUMBER
NAME DATE PHONE #
Temporary Stabilization: Temporary stabilization includes the placement of an annual or cover crop and a straw or other mulch Straw Wattle SW Permanent Stabilization TAGNUMBER
covering to protect disturbed areas from precipitation. In certain cases where redisturbance will occur prior to a normal germination SITE NAME:
Check Dam CD Erosion Control Matting
period, temporary stabilization with mulch or other covering may be completed without the application of seed.
Dewatering Device DW Construction Entrance INST# 17-0841883-00
Temporary stabilization will be completed on the following areas to reduce erosion from bare ground during rainfall events: ABAN# 17-0841884-00
Check Dam CD Filter Sock (12")
1. Any areas, including stockpiles or tie-in pits, which will remain open overnight without perimeter controls. PROJECT ID# 17-48840
2. Any work area that will remain bare/disturbed longer than 7 days (4 in PA) without being actively worked within that time. Seeding Sediment Trap ST Filter Sock (18") HIDDEN RD, ANDOVER
must be completed within this time window. ANDOVER
, ESSEX (009)
Trench Breaker TB Filter Sock (24")

Permanent Stabilization: Includes the placement of a permanent seed mix and a straw or other mulch covering to permanently TAGNUMBER
Silt Fence DRAWING TITLE:
stabilize the disturbed areas. Proper ground/ seed bed preparation (e.g. topsoiling, raking, decompaction) shall be completed as
appropriate to the existing site area to provide a sufficient surface for seed germination.
Tree Protection
Permanent seeding shall be completed immediately after work completion in all work areas without structural controls; regardless of
Environmental Impacted Area
(on Env-Impact layer) (on Env-TreeProtection layer)
ENVIRONMENTAL
whether the surrounding area is vegetated. Permanent seeding shall be applied within 7 days (4 days in PA) of work completion in Wetlands Area Tree Line NARRATIVE
areas all other areas; with the exception of work area protected by adequate structural controls where the surrounding area is an active (on Env-Wetlands layer) (on Env-TreeLine layer)
construction site and was not vegetated prior to the start of work. Stream Line Limits of Disturbance
DRAWING NO:
(on Env-StreamLine layer) (on Env-DisturbanceLimit layer)

ENV-1
2/27/19
22R 20R
LOWELL HSE QUINCY HSE

160

234

159

28
3

24 PT
22 D

158
20 238
5 238
D R
32

L-1
S
157 + 50
18

157
Know what'sbelow.
Call before you dig.
9
254
25
242
16 29
9
34

21 D
242

19

156 244

KARLTON CIR
S

17
17 19

15

14 4
155
7
5

SOUTH MAIN ST (ROUTE 28)


243
9
S
D

RD
09/24/2049
14 E N
254
11 DD
17 HI 12
13

154

246
FOR 245
BES D

LN
10

8 4
S
10
PT

153
16

2
12
249

14
8

152 N
5
PORTER RD 251

25

3
0 100 200
151
6 253
Feet
D
S

25 22 PROPOSED
7 150
1

23
24
REVISIONS
S
D

9
15 HIDDEN
WAY
RD
R
R TE 149

PO
HAMMOND WA

1
PORTER RD

6
Y

L-2
148

261

0 7/5/19 INITIAL ISSUE - PERMIT COPY


HIDDEN

20
4

29 28
16
R

28
REV. # DATE DESCRIPTION
D

147

4
DESIGNED BY K MURRAY 7/3/19 978-802-5728
20
10 DRAWN BY K MURRAY 7/3/19 978-802-5728
261
CHECK'D BY X X X
AS-BUILT BY X X X
32
146 NAME DATE PHONE #
2
SITE NAME:

SOUTH MAIN ST (ROUTE 28)


5
RAFTON 33
8
10

INST# 17-0841883-00
5
145
ABAN# 17-0841884-00
PROJECT ID# 17-48840
3
8

HIDDEN RD, ANDOVER


35
GARD
S

ANDOVER
, ESSEX (009)
9 S

NER
RAFTON AVE
144

36

12
DRAWING TITLE:
6 BANCROFT RD
4

5 3

OVERVIEW SHEET
143

269
39
9

13
1 3
LANTE
R N LN
38

142
271
NUTME

16 DRAWING NO:
G LN

1 1

O-1
9
17

17 41
141

2/27/19
234

159
(1) 6X6 FULL PE TEE
(1) 6" PE FULL PORT BALL VALVE
(2) 6IN EF COUPLINGS

28
3

PT
D

L-1

6" PIP 1979 DUPONT


158
238

PE2306 SDR21
L-2
5 238
D

32

IIP
S
157 + 50

8" C
7

8" PIP 2008 157


9
09/24/2049
242
29
9
34

D
242

N
EDGE OF PAVEMENT EDGE OF PAVEMENT
156 244

2 0 40 80
IP
KARLTON CIR

I S

6" PIP 2004


8"C
Feet

15 PROPOSED
EDGE OF PAVEMENT
P
HI REVISIONS
"P
-6 4
0' APPROX. STATE HIGHWAY
90 155
~ LAYOUT CENTERLINE
OC
4" PIP 2006

SOUTH MAIN ST (ROUTE 28)


243
D

RD
S

4"BP-6984 EDGE OF PAVEMENT EN


DD
(1) 4IN EF COUPLING 17 HI 12
0 7/5/19 INITIAL ISSUE - PERMIT COPY

4" C REV. # DATE DESCRIPTION


SIP
1976 154
DESIGNED BY K MURRAY 7/3/19 978-802-5728
246 DRAWN BY K MURRAY 7/3/19 978-802-5728
FOR CHECK'D BY X X X
245
OC BES D
AS-BUILT BY X X X
~ 200 LN
'-4 NAME DATE PHONE #
" PH
IP
(1) 6X6 FULL PE TEE SITE NAME:
4" C (1) 6X4 PE REDUCER
IIP
(1) 4" PE FULL PORT BALL VALVE
4 EDGE OF PAVEMENT
S INST# 17-0841883-00
PT
ABAN# 17-0841884-00
153
PROJECT ID# 17-48840
16 HIDDEN RD, ANDOVER
ANDOVER
, ESSEX (009)
2
249
DRAWING TITLE:

8" PHIP 2017


LAYOUT SHEET
IIP
8" C

8"BP-40658

152
128'-2
5 " PI P
251 DRAWING NO:
PORTER RD EDGE OF PAVEMENT

L-1
2/27/19
MATERIAL INFORMATION
(TO BE COMPLETED DURING CONSTRUCTION)

FITTING INSTALLATION DATA


STORES ITEM NUMBER MATERIAL
FITTING TYPE SIZE (IN) (PO NUMBER IF NON-STOCK) (MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

Know what'sbelow.
Call before you dig.

09/24/2049

VALVE INSTALLATION DATA


STORES ITEM NUMBER MATERIAL
VALVE TYPE SIZE (IN) (PO NUMBER IF NON-STOCK) (MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

PROPOSED
REVISIONS

FITTING LEGEND
PIPELINE INSTALLATION DATA CONTROLLABLE FITTINGS
MATERIAL PIPE DATA FITTING TYPE LABEL SYMBOL
SIZE (IN) STORES ITEM NUMBER PLASTIC - SDR/STRAIGHT OR COIL BOTTOM OUT MUELLER FITTING 4" MF-BO
PIPE SEGMENT (MDPE, HDPE, STEEL) (PO NUMBER IF NON-STOCK) MANUFACTURER LOCATION COMMENTS
STEEL - WALL/GRADE/SEAM TYPE/COATING HIGH VOLUME TEE 4x2 HVT
SHORTSTOPP 4" SS
FULL ENCIRCLEMENT SHORTSTOPP4" SS-FE
FULL ENCIRCLEMENT SHORTSTOPP4"TEE
SST-FE
SIDE OUT MUELLER FITTING 4" MF-SO 0 7/5/19 INITIAL ISSUE - PERMIT COPY
SPHERICAL TEE 4" SPH
MUELLER STOPPER 4" MF-ST REV. # DATE DESCRIPTION
SHORTSTOPP TEE 4" SST
DESIGNED BY K MURRAY 7/3/19 978-802-5728
DRAWN BY K MURRAY 7/3/19 978-802-5728
NONCONTROLLABLE FITTINGS CHECK'D BY X X X
FITTING TYPE LABEL SYMBOL AS-BUILT BY X X X
BLOW-DOWN BLOW-DOWN N/A^ NAME DATE PHONE #
BLOW-OFF BLOW-OFF N/A^
CHECK VALVE 4" CHECK VALVE SITE NAME:
COUPLING 4" COUPLING
ELL 4" 90° ELL/45° ELL N/A*
END CAP 4" DE CAP INST# 17-0841883-00
LAUNCHER-RECEIVER LAUNCHER-RECEIVER N/A^ ABAN# 17-0841884-00
PUMPKIN PUMPKIN PROJECT ID# 17-48840
REDUCER 4x2 REDUCER
RELIEF RELIEF N/A^ HIDDEN RD, ANDOVER
SADDLE 8x4 BRANCH SADDLE N/A* ANDOVER
, ESSEX (009)
TEE 4" INLINE TEE N/A*
TRANSITION 4" TRANSITION
WELD INSULATOR 4" WELD INSULATOR DRAWING TITLE:
RISER 4" PMMP-R/CSMP-R

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY MATERIAL


* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE) INFORMATION

DRAWING NO:

L-1 MI
2/27/19
17
20 D
S

P
PHI
6" 4" PHIP
9 2017
6" PHIP 2017 HIDDEN
WAY
RD
T ER (1) 6IN EF COUPLING 149
R (1) 6IN PE FULL PORT BALL VALVE
PO
1

6" BSIP
L-1

6 EDGE OF PAVEMENT
L-2
S

APPROX. STATE HIGHWAY


LAYOUT CENTERLINE
EDGE OF PAVEMENT

EDGE OF PAVEMENT 148

261

HIDDEN
29 28

RD
28
09/24/2049

147

OC ~ 6
80' - 6" P
10

N
HIP 261

0 40 80

146 Feet
32
PROPOSED
REVISIONS

SOUTH MAIN ST (ROUTE 28)


33
6" BSIP

(1) 6IN FULL TEE


(1) 6X4 PE REDUCER
5
145

3
0 7/5/19 INITIAL ISSUE - PERMIT COPY

S REV. # DATE DESCRIPTION

6" PIP 2004


DESIGNED BY K MURRAY 7/3/19 978-802-5728
OC ~ DRAWN BY K MURRAY 7/3/19 978-802-5728
53 0' - 4" P
HIP 4" CIIP CHECK'D BY X X X
35
S
EDGE OF PAVEMENT AS-BUILT BY X X X
NAME DATE PHONE #
4" CIIP

GARD S (1) 6IN EF COUPLING


NER AV (1) 6X4 PE REDUCER
E 144 SITE NAME:

36
6" PHIP 2016 INST# 17-0841883-00
EDGE OF PAVEMENT 6" PIP 2004 ABAN# 17-0841884-00
6''BP-40571 PROJECT ID# 17-48840
HIDDEN RD, ANDOVER
6 BANCROFT RD ANDOVER
, ESSEX (009)
4

5 DRAWING TITLE:
3 (1) 6IN EF COUPLING
(1) 6IN PE FULL PORT BALL VALVE 143

39 EDGE OF PAVEMENT 269 LAYOUT SHEET


6" PIP 2008

LANTE DRAWING NO:


RN LN
4" PIP 20 38
12
L-2
2/27/19
MATERIAL INFORMATION
(TO BE COMPLETED DURING CONSTRUCTION)

FITTING INSTALLATION DATA


STORES ITEM NUMBER MATERIAL
FITTING TYPE SIZE (IN) (PO NUMBER IF NON-STOCK) (MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

Know what'sbelow.
Call before you dig.

09/24/2049

VALVE INSTALLATION DATA


STORES ITEM NUMBER MATERIAL
VALVE TYPE SIZE (IN) (PO NUMBER IF NON-STOCK) (MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

PROPOSED
REVISIONS

FITTING LEGEND
PIPELINE INSTALLATION DATA CONTROLLABLE FITTINGS
MATERIAL PIPE DATA FITTING TYPE LABEL SYMBOL
SIZE (IN) STORES ITEM NUMBER PLASTIC - SDR/STRAIGHT OR COIL BOTTOM OUT MUELLER FITTING 4" MF-BO
PIPE SEGMENT (MDPE, HDPE, STEEL) (PO NUMBER IF NON-STOCK) MANUFACTURER LOCATION COMMENTS
STEEL - WALL/GRADE/SEAM TYPE/COATING HIGH VOLUME TEE 4x2 HVT
SHORTSTOPP 4" SS
FULL ENCIRCLEMENT SHORTSTOPP4" SS-FE
FULL ENCIRCLEMENT SHORTSTOPP4"TEE
SST-FE
SIDE OUT MUELLER FITTING 4" MF-SO 0 7/5/19 INITIAL ISSUE - PERMIT COPY
SPHERICAL TEE 4" SPH
MUELLER STOPPER 4" MF-ST REV. # DATE DESCRIPTION
SHORTSTOPP TEE 4" SST
DESIGNED BY K MURRAY 7/3/19 978-802-5728
DRAWN BY K MURRAY 7/3/19 978-802-5728
NONCONTROLLABLE FITTINGS CHECK'D BY X X X
FITTING TYPE LABEL SYMBOL AS-BUILT BY X X X
BLOW-DOWN BLOW-DOWN N/A^ NAME DATE PHONE #
BLOW-OFF BLOW-OFF N/A^
CHECK VALVE 4" CHECK VALVE SITE NAME:
COUPLING 4" COUPLING
ELL 4" 90° ELL/45° ELL N/A*
END CAP 4" DE CAP INST# 17-0841883-00
LAUNCHER-RECEIVER LAUNCHER-RECEIVER N/A^ ABAN# 17-0841884-00
PUMPKIN PUMPKIN PROJECT ID# 17-48840
REDUCER 4x2 REDUCER
RELIEF RELIEF N/A^ HIDDEN RD, ANDOVER
SADDLE 8x4 BRANCH SADDLE N/A* ANDOVER
, ESSEX (009)
TEE 4" INLINE TEE N/A*
TRANSITION 4" TRANSITION
WELD INSULATOR 4" WELD INSULATOR DRAWING TITLE:
RISER 4" PMMP-R/CSMP-R

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY MATERIAL


* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE) INFORMATION

DRAWING NO:

L-2 MI
2/27/19
CONSTRUCTION DETAILS

Know what'sbelow.
Call before you dig.

PROPOSED
REVISIONS

0 7/5/19 INITIAL ISSUE - PERMIT COPY

REV. # DATE DESCRIPTION

DESIGNED BY K MURRAY 7/3/19 978-802-5728


DRAWN BY K MURRAY 7/3/19 978-802-5728
CHECK'D BY X X X
AS-BUILT BY X X X
NAME DATE PHONE #

SITE NAME:

INST# 17-0841883-00
ABAN# 17-0841884-00
PROJECT ID# 17-48840
HIDDEN RD, ANDOVER
ANDOVER
, ESSEX (009)

DRAWING TITLE:

CONSTRUCTION
DETAILS

DRAWING NO:

D-1
2/27/19
Columbia Gas – Hidden Road Motion

I move that the Board approve, subject to the review and approval of the Andover Department of
Public Works Engineering Division and Andover Fire Rescue, the petition of Columbia Gas
requesting the permission to excavate for the purpose of replacing and/or extending its gas
mains, according to blueprints provided in the petition, and to make necessary house connections
along said extensions, on Hidden Road (from South Main Street to Lantern Lane), Gardner
Avenue, and Forbes Street (from Hidden Road to Karlton Circle).

Moved by_____________________
Seconded by___________________
Voted_________ to _____________
R

Know what'sbelow.
Call before you dig.

INSTALLATION ORDER NUMBER 19-0844250-00


PROJECT ID 19-61713
15 CHARLOTTE DR, ANDOVER 09/24/2019

JOB TYPE: GROWTH (555)

PROJECT INFORMATION VICINITY MAP SHEET INDEX


DWG. DESCRIPTION
FIELD ENGINEER/TECHNICIAN: K MURRAY
T-1 TITLE SHEET
CONSTRUCTION FLL: K WELLS / J ANGELARI
GN-1 GENERAL NOTES
PERMITS: CITY PERMIT
ENV-1 ENVIRONMENTAL PLAN NARRATIVE PROPOSED
TCC/LOA: 8400
L-1 LAYOUT PLANS
COUNTY: ESSEX REVISIONS
D-1 CONSTRUCTION DETAILS
TAX DISTRICT/TOWNSHIP ID: 0000401
MAP/GRID NUMBER: AND-148
SYSTEM NUMBER(S): 80001013
24 HR. EMERGENCY LINE: COLUMBIA GAS OF MASSACHUSETTS
1-800-525-8222
PROJECT SUMMARY TABLE 0 7/11/19 INITIAL / PERMIT ISSUE

PROPOSED INSTALLATION PROPOSED ABANDONMENT REV. # DATE DESCRIPTION

LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE DESIGNED BY K MURRAY 6/17/19 978-802-5728
DRAWN BY K MURRAY 6/17/19 978-802-5728
40' 4" HDPE 0' CHECK'D BY X X X
AS-BUILT BY X X X
NAME DATE PHONE #

SITE NAME:

INST# 19-0844250-00
40 TOTAL INSTALLATION (FEET) 0 TOTAL ABANDONMENT (FEET) ABAN# XX-XXXXXXX-XX
N
PROPOSED GAS SERVICES PROJECT ID# 19-61713
15 CHARLOTTE DR, ANDOVER
REPLACEMENTS TIE OVERS TOTAL SERVICES METER OUTS ANDOVER, ESSEX
ESTIMATED GAS SERVICES 0 0 1 0

PROJECT DESCRIPTION DRAWING TITLE:

THIS PROJECT IS TO INSTALL 40' OF 4" PHIP MAIN ON CHARLOTTE DRIVE, ANDOVER. THE PROPOSED INSTALLATION IS
REQUIRED IN ORDER TO INSTALL A NEW GAS SERVICE TO 15 CHARLOTTE DRIVE. TITLE SHEET

DRAWING NO:

T-1
2/27/19
General Notes

1. The proposed gas main shown is approximate and is subject to change. 6. Prior to beginning any excavation on site, the person responsible for earth moving shall notify utility owners of their intent to
excavate and to have the exact locations of the utility lines marked by contacting the one call center in their state subject to any
2. Property lines, structures, street lines, etc. were compiled using the NiSource GIS and are to be considered approximate. applicable state advance notification requirements.

3. Existing utilities, where shown, have been compiled from above ground evidence only and are to be considered approximate. 7. Proposed or completed gas facility installation location references may be indicated by a combination of the following codes:
NiSource does not guarantee the location of the underground utilities shown or that all existing utilities and/or subsurface
R

structures are shown. F - FRONT


BK - BACK
4. This project will adhere to all applicable federal, state or local permitting requirements for abandonment and installation of natural L - LEFT
gas pipelines. All Federal, State, and Local codes and standards will be adhered including, but not limited to, the following: R - RIGHT Know what'sbelow.
Code of Federal Regulations (CFR) B - BUILDING EDGE Call before you dig.
49 CFR 192 Pipeline Safety Regulations CLP - CENTER OF PAVEMENT
29 CFR 1910 Occupational Safety and Health Administration (OSHA) CLR - CENTER OF RIGHT-OF-WAY
American Society of Mechanical Engineers (ASME) CEL - CENTER OF EASTBOUND LANE
ASME B31.8 Gas Transmission and Distribution Piping Systems CWL - CENTER OF WESTBOUND LANE
CNL - CENTER OF NORTHBOUND LANE
5. All NiSource design codes and standards will be adhered to as applicable. These standards include but are not limited to the CSL - CENTER OF SOUTHBOUND LANE
following (note state-specific designations where applicable): CU - CURB
GS 1100.010(IN, KY, MA, MD, OH, PA, VA) Locating Gas Facilities D - DRIVEWAY EDGE
GS 1100.040(MA and VA only) Damage Prevention When Using Conventional Excavation Technologies EP - EDGE OF PAVEMENT
GS 1100.050(IN, OH, VA) Damage Prevention - Using Trenchless Technology ES - EDGE OF SIDEWALK 09/24/2019
GS 1170.010(IN) Gas Control Room Management PL - PROPERTY LINE
GS 1210.010(MA) Nondestructive Testing And Visual Inspection
GS 1300.010 Fusion And Mechanical Joining
GS 1301.010 Plastic Pipe Fusion And Mechanical Joining Qualification Of Personnel
GS 1302.010(VA) Butt Fusion Joining
GS 1304.010 Electrofusion Joining
GS 1320.010 Mechanical Coupling Connections
GS 1323.010 Flange Connections
GS 1400.010 Corrosion Control - General
GS 1410.010(VA) Metallic Pipeline Exposures
GS 1420.035 Coating Repair Methods For Mill Applied Coatings
DRAWING LEGEND
GS 1420.040 Coating Methods For Girth Welds, Fittings, Risers & Other Below Grade Appurtenances
GS 1420.410 Corrosion Control - Inspection Of Steel Pipe Coating
GS 1420.510 Installation Of Galvanic Anodes Gas Main Symbology Gas Facility Symbology
GS 1420.520 Installation Of Test Stations Existing Gas Main
Existing Gas Main to Be Abandoned
4"GV
4"PV
Gas Valve (Gate - GV, Plug - PV, PE Ball - BP, ST Ball - BV)
Critical Gas Valve
PROPOSED
GS 1430.320 Ultrasonic Thickness Gauge
Proposed Gas Main 2"HVTT High Volume Tapping Tee
GS 1500.010(MA, OH) Pressure Testing REVISIONS
Proposed Gas Main Uprate 2"SST Pressure Control Fitting - ShortStopp Tee
GS 1670.020(IN, KY, MA, MD) Odor Level Monitoring Gas Main Material/Pressure Label References 4"SPH Pressure Control Fitting - Spherical Tee
GS 1670.040 Pipeline Conditioning New Pipelines CS Coated Steel Gas Main 6"MF-BO Pressure Control Fitting - Mueller Bottom-out
GS 1680.010 Tie-Ins And Tapping Pressurized Pipelines CI Cast Iron Gas Main 6"MF-SO Pressure Control Fitting - Mueller Side-out
GS 1680.020 Plastic To Steel Transition Connections BS Bare Steel Gas Main 4"MF-FT Pressure Control Fitting - Mueller Flange Tee
GS 1680.040 Squeeze Off Procedure For Plastic Pipe WI Wrought Iron Gas Main 4"SS Pressure Control Fitting - ShortStopp
GS 1680.050 Squeeze Off Guidelines For Steel Pipe PH High Density Polyethylene Gas Main 4"MF Pressure Control Fitting - ShortStopp
GS 1690.010 Purging
PM Medium Density Polyethylene Gas Main 6x4 POLYTAPPolytapp Side Saddle Fitting
LP Low Pressure Transition
GS 1708.020(IN, KY, MA, MD, PA) Leakage Surveys IP Intermediate Pressure End Cap
GS 1740.010(MA, OH, PA, VA) Abandonment Of Facilities MP Medium Pressure Riser 0 7/11/19 INITIAL / PERMIT ISSUE
GS 1740.012(MA, PA) Abandoning Facilities - Service Tee Removal HP High Pressure Reducer
GS 1742.010(VA) Discontinuing Gas Service Gas Main Installation Method Label References EM Electronic Marker REV. # DATE DESCRIPTION
GS 1754.010(KY, OH) Operation And Maintenance Of Pressure Gauges AT Attached TWS Flush-mounted Tracer Wire Station
BH Bridge Hanger Post Pipeline Marker with Tracer Wire DESIGNED BY K MURRAY 6/17/19 978-802-5728
GS 1770.010 Prevention Of Accidental Ignition DRAWN BY K MURRAY 6/17/19 978-802-5728
BLGH Building Hanger MM Gas Main Marker without Tracer Wire
GS 1782.010(MA) Protecting Cast Iron Pipelines DB Directional Bore W Test Well CHECK'D BY X X X
GS 3000.020(VA) Inspection Of Materials IS Inserted R Regulator Station AS-BUILT BY X X X
GS 3000.900 Work Site Restoration OC Open Cut R Single Customer Regulator NAME DATE PHONE #
GS 3010.030 Bends And Elbows PB Pneumatic Bore M Meter
PL Plowed MR
Meter with Regulator SITE NAME:
GS 3010.050(IN, MA) Installation Of Pipe In A Ditch
GS 3010.060(IN) Installation Of Plastic Pipe RT Roof Top T
P Test Point (Station)
(E) Existing T Gas Service Tie-over INST# 19-0844250-00
GS 3010.080(MA, OH, VA) Underground Clearance (P) Proposed R Gas Service Replacement ABAN# XX-XXXXXXX-XX
GS 3010.090(IN, MA, PA, VA) Cover Meter Move Out
GS 3010.100(VA) Transmission Lines And Distribution Mains - Trenchless Technology
MMO
PROJECT ID# 19-61713
W1 Weld Location Swing Tie Symbology 15 CHARLOTTE DR, ANDOVER
GS 3010.102(VA) Directional Boring T Telephone Manhole ANDOVER, ESSEX
GS 3010.210(MA only) Use Of End Caps On Steel Pipe T1 Gas Main Tie-in Location D Drain Manhole
GS 3020.030 Service Line Connections To Main Piping E Electric Manhole
A1 Gas Main Abandonment Location Catch Basis
HSE 4100.010 Hazardous Atmosphere Considerations DRAWING TITLE:
S Sewer Manhole
HSE 4100.020 Work Zone Traffic Protection Fire Hydrant
HSE 4100.040 Excavation (Trenching) Safety Utility Pole
HSE 4120.010 Welding And Cutting Property Marker GENERAL NOTES
HSE 4200.020 Protective Footwear T Telephone Pedestal
HSE 4200.030 Eye And Face Protection C Television Pedestal
HSE 4200.040 Hand Protection
U Unknown Manhole
WB
Water Box
HSE 4200.050 Head Protection WG
Water Gate
DRAWING NO:
HSE 4440.030(KY, MA, MD, OH, PA, VA) Spoil Handling During Excavations E Electric Pedestal
ON 18-09 Additional Requirements For Tie-Ins Involving Low Pressure Facilities
GN-1
IP
Iron Pin
WM Columbia Gas Welding Manual Light Pole

2/27/19
Environmental Plan Narrative Maintenance: The job site shall be inspected by construction personnel at the end of each day to ensure that any controls are
functioning and that the work area is sufficiently contained. Required maintenance of NiSource installed controls or corrective actions
1. There is no Site-Specific Erosion Control plan requirement for this project. This plan narrative, with the project Environmental shall be performed immediately or within the time frames noted by an Environmental Inspector.
Compliance Plan (ECP), provide information regarding all environmental requirements. All NiSource construction activities must be
performed in accordance with the NiSource Environmental Construction Standards (ECS) and the project ECP. Measures previously installed by third parties shall be maintained by NiSource under the following circumstances:
1. The control is not properly functioning and is being used to contain sediment and prevent erosion immediately adjacent to
2. The project ECP must be reviewed with construction and contractor personnel prior to the start of construction activities. This NiSource work.
includes any tree clearing activities required prior to the start of pipeline construction. 2. Damage to the control is the result of work performed by NiSource.
R

3. All NiSource construction projects must have a clearly defined work area or limits of disturbance (LOD). The LOD includes the Projects Within Third Party Construction Sites:
permitted project area and any additional work space needed for laydown yards, soil stockpiling areas, access routes, etc. Notify
NRP of any additional work space that may be needed outside of what is shown on this job order sketch. In situations where NiSource projects are being completed within a larger project or development area, NiSource is still responsible for Know what'sbelow.
ensuring our work is in compliance with all laws and regulations. This must be documented under one of the following scenarios: Call before you dig.
Description and Minimum Requirements for Erosion and Sediment Control Measures 1. Prior to the start of construction activities, a qualified NiSource representative will verify that all NiSource work activities will be
covered under the third party's approved site plan and/or SWPPP and that the appropriate EC measures are installed and
The information provided below outlines the purpose of common measures and how and when they shall be applied to the site. Figures functioning. This review will be documented and retained in the project records.
showing installation details are provided in the NiSource ECS manual. 2. If the EC measures required by the third party's approved site plan are not present or functioning, NiSource construction activities
may commence under the following conditions:
Perimeter Barriers: Perimeter barriers, such as silt fence and compost filter sock may be installed along the outside of the project area a. All disturbed NiSource work areas are stabilized at the end of the work day.
or around sensitive areas to slow and filter sediment laden runoff before it leaves the work area. b. Any NiSource work areas requiring disturbance over one working day (e.g. stockpiles, tie-in pits) will require perimeter
controls or temporary mulching or covering on a daily basis.
These measures are required in the following areas: c. The overall project SWPPP is present/available and all NiSource activities remain within compliance of all outlined
09/24/2019
1. When work is occurring adjacent to streams, wetlands or other sensitive areas. requirements.
2. Around HDD bore pits adjacent to streams, wetlands or other sensitive areas. d. Any additional permits required for the NiSource work are obtained.
3. Around soil stockpiles that will remain uncovered for greater than one working day. e. The third party permit holder is informed of the site deficiencies and NiSource's plan to complete the work.
4. Where any work areas or excavations will remain disturbed (unstabilized) for longer than one working day.
Final stabilization measures shall be completed as described in the applicable Temporary or Permanent Stabilization sections above to
Inlet Protection: Storm drain inlet protection, both curb and drop inlets, are required in active work areas where there is functioning match the adjacent conditions of the third party project.
storm sewer to slow and filter water draining into the system. In areas where the work area is adjacent to, or water from the site flows
onto a paved roadway, inlet protection will be placed in all functioning outlets. In addition to the preceding methods, the following erosion control measures will be used on a daily basis regardless of whether the
work area is inside third party controls:
Check dams: Rock check dams may be installed in areas of concentrated flow in a ditch line to slow runoff and allow sediment to settle · Perimeter barriers around bore pits at wetland/ stream bores
prior to discharge. Check dams may also be used as a break in a perimeter barriers where runoff is concentrated and perimeter barriers · Dewatering activities using a filter bag or other approved method
are insufficient to detain runoff. Check dams are required when working in ditch lines where work will remain active for more than 1 day · Roadway cleaning daily for sediment tracked onto paved surfaces
and as a supplementary measure determined to be needed during construction.
Wetland and Stream Crossings, Sensitive Areas:
Dewatering Devices: A filter bag, or other approved dewatering device, must be used during all dewatering activities to remove
suspended sediment from the water prior to discharge into the environment. Dewatering devices must be used in areas including, but
not limited, to trench or pit dewatering and treatment of excess HDD mud.
All wetlands, stream crossings and other sensitive areas (e.g. managed lands, parks, and endangered species habitat areas) must be PROPOSED
marked in the field with caution flagging prior to the start of clearing activities and/or land disturbing activities.

Construction Entrances: In cases where vehicular access from the work area occurs at a single point for multiple days, a rock
REVISIONS
Any requirements for construction within these areas will be outlined within the ECP and the attached permit documents. These permits
construction entrance must be installed. A stabilized construction entrance may not be feasible during construction within or must also be reviewed prior to the start of construction.
immediately adjacent to a roadway as the construction project moves linearly along the road. In these cases, care should be taken to
minimize vehicular access and the roadway shall be regularly cleaned of tracked sediment throughout the work day. Alternatives to rock
entrances include the placement of timber mats or similar non erodible materials. Use of these alternatives must be approved by the
NRP group or environmental inspector.

Trench Plugs/Breakers: Trench breakers consist of sand or earth filled sacks placed at intervals along the pipeline trench. Trench
breakers may be installed at intervals within the trench to reduce water velocity along the pipeline bedding that can result in erosion
during construction and after backfilling. Trench plugs consist of clay, bentonite or other impermeable material and are required 0 7/11/19 INITIAL / PERMIT ISSUE

adjacent to stream and wetland crossings to ensure that the flow of water along the trench line does not impact the waterbody. REV. # DATE DESCRIPTION
ENVIRONMENTAL EROSION AND SEDIMENT CONTROL SYMBOLOGY
Temporary Stabilization: Temporary stabilization includes the placement of an annual or cover crop and a straw or other mulch DESIGNED BY K MURRAY 6/17/19 978-802-5728
ENVIRONMENTAL EROSION CONTROL BLOCKS
DRAWN BY K MURRAY 6/17/19 978-802-5728
covering to protect disturbed areas from precipitation. In certain cases where redisturbance will occur prior to a normal germination (on Env-ErosionControl layer)
X X X
CHECK'D BY
period, temporary stabilization with mulch or other covering may be completed without the application of seed. AS-BUILT BY X X X
Inlet Protection IP Temporary Stabilization TAGNUMBER
NAME DATE PHONE #
Temporary stabilization will be completed on the following areas to reduce erosion from bare ground during rainfall events: Straw Wattle SW Permanent Stabilization TAGNUMBER
1. Any areas, including stockpiles or tie-in pits, which will remain open overnight without perimeter controls. SITE NAME:
Check Dam CD Erosion Control Matting
2. Any work area that will remain bare/disturbed longer than 7 days (4 in PA) without being actively worked within that time. Seeding
must be completed within this time window. Dewatering Device DW Construction Entrance INST# 19-0844250-00
ABAN# XX-XXXXXXX-XX
Check Dam CD Filter Sock (12")
Permanent Stabilization: Includes the placement of a permanent seed mix and a straw or other mulch covering to permanently PROJECT ID# 19-61713
stabilize the disturbed areas. Proper ground/ seed bed preparation (e.g. topsoiling, raking, decompaction) shall be completed as Sediment Trap ST Filter Sock (18") 15 CHARLOTTE DR, ANDOVER
appropriate to the existing site area to provide a sufficient surface for seed germination. ANDOVER, ESSEX
Trench Breaker TB Filter Sock (24")

Permanent seeding shall be completed immediately after work completion in all work areas without structural controls; regardless of TAGNUMBER
Silt Fence DRAWING TITLE:
whether the surrounding area is vegetated. Permanent seeding shall be applied within 7 days (4 days in PA) of work completion in
areas all other areas; with the exception of work area protected by adequate structural controls where the surrounding area is an active
construction site and was not vegetated prior to the start of work. Tree Protection
Environmental Impacted Area
(on Env-Impact layer) (on Env-TreeProtection layer)
ENVIRONMENTAL
Erosion Control Blanket/Matting: Erosion control blanket is a straw matting that can be rolled out over a disturbed area and secured Wetlands Area Tree Line NARRATIVE
using pins or stakes. This blanket may be required on steeper sloped areas to hold seed and mulch in place. Erosion control blanket (on Env-Wetlands layer) (on Env-TreeLine layer)
can also be useful in protecting the seed and holding moisture in dry, windy areas. Erosion control blanket must be used in restoration Stream Line Limits of Disturbance
DRAWING NO:
adjacent to streams or wetlands. It should also be used in areas with high erosion potential (e.g. steep slopes, embankments, ditch (on Env-StreamLine layer) (on Env-DisturbanceLimit layer)
lines).
ENV-1
2/27/19
16
R

Know what'sbelow.
14 Call before you dig.

09/24/2019

18

EDGE OF PAVEMENT
WB
S N

0 20 40

4" PIP
Feet
4IN PE EF COUPLING
OC ~ 40' - 4" PHIP
4IN PE BUTT END CAP
PROPOSED
REVISIONS
EDGE OF PAVEMENT

PROPOSED GAS SERVICE

WB

D
0 7/11/19 INITIAL / PERMIT ISSUE

REV. # DATE DESCRIPTION

DESIGNED BY K MURRAY 6/17/19 978-802-5728


DRAWN BY K MURRAY 6/17/19 978-802-5728
CHECK'D BY X X X
M AS-BUILT BY X X X
NAME DATE PHONE #

SITE NAME:
15
INST# 19-0844250-00
ABAN# XX-XXXXXXX-XX
PROJECT ID# 19-61713
15 CHARLOTTE DR, ANDOVER
ANDOVER, ESSEX
17
DRAWING TITLE:
21
LAYOUT SHEET

DRAWING NO:

19
L-1
2/27/19
MATERIAL INFORMATION
(TO BE COMPLETED DURING CONSTRUCTION)

FITTING INSTALLATION DATA


STORES ITEM NUMBER MATERIAL
FITTING TYPE SIZE (IN) (PO NUMBER IF NON-STOCK) (MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

Know what'sbelow.
Call before you dig.

09/24/2019

VALVE INSTALLATION DATA


STORES ITEM NUMBER MATERIAL
VALVE TYPE SIZE (IN) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
(PO NUMBER IF NON-STOCK) (MDPE, HDPE, STEEL)
PROPOSED
Y or N
REVISIONS

FITTING LEGEND
PIPELINE INSTALLATION DATA CONTROLLABLE FITTINGS
MATERIAL PIPE DATA FITTING TYPE LABEL SYMBOL
SIZE (IN) STORES ITEM NUMBER PLASTIC - SDR/STRAIGHT OR COIL BOTTOM OUT MUELLER FITTING 4" MF-BO
PIPE SEGMENT (MDPE, HDPE, STEEL) (PO NUMBER IF NON-STOCK) MANUFACTURER LOCATION COMMENTS
STEEL - WALL/GRADE/SEAM TYPE/COATING HIGH VOLUME TEE 4x2 HVT
SHORTSTOPP 4" SS
FULL ENCIRCLEMENT SHORTSTOPP4" SS-FE
FULL ENCIRCLEMENT SHORTSTOPP4"TEE
SST-FE
SIDE OUT MUELLER FITTING 4" MF-SO 0 7/11/19 INITIAL / PERMIT ISSUE
SPHERICAL TEE 4" SPH
MUELLER STOPPER 4" MF-ST REV. # DATE DESCRIPTION
SHORTSTOPP TEE 4" SST
DESIGNED BY K MURRAY 6/17/19 978-802-5728
DRAWN BY K MURRAY 6/17/19 978-802-5728
NONCONTROLLABLE FITTINGS CHECK'D BY X X X
FITTING TYPE LABEL SYMBOL AS-BUILT BY X X X
BLOW-DOWN BLOW-DOWN N/A^ NAME DATE PHONE #
BLOW-OFF BLOW-OFF N/A^
CHECK VALVE 4" CHECK VALVE SITE NAME:
COUPLING 4" COUPLING
ELL 4" 90° ELL/45° ELL N/A*
END CAP 4" DE CAP INST# 19-0844250-00
LAUNCHER-RECEIVER LAUNCHER-RECEIVER N/A^ ABAN# XX-XXXXXXX-XX
PUMPKIN PUMPKIN PROJECT ID# 19-61713
REDUCER 4x2 REDUCER
RELIEF RELIEF N/A^ 15 CHARLOTTE DR, ANDOVER
SADDLE 8x4 BRANCH SADDLE N/A* ANDOVER, ESSEX
TEE 4" INLINE TEE N/A*
TRANSITION 4" TRANSITION
WELD INSULATOR 4" WELD INSULATOR DRAWING TITLE:
RISER 4" PMMP-R/CSMP-R

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY MATERIAL


* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE) INFORMATION

DRAWING NO:

L-1 MI
2/27/19
CONSTRUCTION DETAILS

Know what'sbelow.
Call before you dig.

PROPOSED
REVISIONS

0 7/11/19 INITIAL / PERMIT ISSUE

REV. # DATE DESCRIPTION

DESIGNED BY K MURRAY 6/17/19 978-802-5728


DRAWN BY K MURRAY 6/17/19 978-802-5728
CHECK'D BY X X X
AS-BUILT BY X X X
NAME DATE PHONE #

SITE NAME:

INST# 19-0844250-00
ABAN# XX-XXXXXXX-XX
PROJECT ID# 19-61713
15 CHARLOTTE DR, ANDOVER
ANDOVER, ESSEX

DRAWING TITLE:

CONSTRUCTION
DETAILS

DRAWING NO:

D-1
2/27/19
Columbia Gas – Charlotte Drive Motion

I move that the Board approve, subject to the review and approval of the Andover Department of
Public Works Engineering Division and Andover Fire Rescue, the petition of Columbia Gas
requesting the permission to excavate for the purpose of replacing and/or extending its gas
mains, according to blueprints provided in the petition, and to make necessary house connections
along said extensions, on Charlotte Drive.

Moved by_____________________
Seconded by___________________
Voted_________ to _____________
R

Know what'sbelow.
Call before you dig.

INSTALLATION ORDER NUMBER 19-0844295-00


ABANDONMENT ORDER NUMBER 19-0844296-00
PROJECT ID 19-62826 09/24/2019

HIGH PLAIN RD.


JOB TYPE: REPLACEMENT (557/558)

PROJECT INFORMATION VICINITY MAP SHEET INDEX


SCALE: NONE DWG. DESCRIPTION
FIELD ENGINEER/TECHNICIAN: V. KOTHAPALLI
T-1 TITLE SHEET
CONSTRUCTION FLL: J. ANGELARI/K. WELLS
GN-1 GENERAL NOTES
PERMITS: TOWN OF ANDOVER
ENV-1 ENVIRONMENTAL PLAN NARRATIVE PROPOSED
O-1 OVERVIEW SHEET
TCC/LOA: 8400 L-1 - L-4
REVISIONS
LAYOUT PLANS
COUNTY: ESSEX D-1 CONSTRUCTION DETAILS
TAX DISTRICT/TOWNSHIP ID: 401
MAP/GRID NUMBER: MAP/GRID NUMBER
SYSTEM NUMBER(S): 80001004/800010019
24 HR. EMERGENCY LINE: 1-800-525-8222
PROJECT SUMMARY TABLE 0

PROPOSED INSTALLATION PROPOSED ABANDONMENT REV. # DATE DESCRIPTION

LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061
DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
2,800' 4" PHHP 655' 6" CILP X X X
CHECK'D BY
1,000' 2" PHHP 390' 6" STLP AS-BUILT BY X X X
2,125' 6" STLP NAME DATE PHONE #
1,000' 4" STLP SITE NAME:

INST# 19-0844295-00
3,800' TOTAL INSTALLATION (FEET) 4,170' TOTAL ABANDONMENT (FEET) ABAN# 19-0844296-00
N
PROPOSED GAS SERVICES PROJECT ID# 19-62826
HIGH PLAIN RD.
REPLACEMENTS TIE OVERS TOTAL SERVICES METER OUTS ANDOVER, ESSEX COUNTY
ESTIMATED GAS SERVICES 20 8 28 28

PROJECT DESCRIPTION DRAWING TITLE:

THIS PROJECT IS TO REPLACE 3,125' OF 4"/6" ST-LP ON HIGH PLAIN RD, VIRGINIA RD, AND SHIRLEY RD WITH 3,800' OF 2"/4"
PH-HP AND RETIRE THE REDUNDANT MAIN ON BEACON ST (390' OF 6" ST-LP) AND LOWELL ST (665' OF 6" CI-LP). AS PART OF TITLE SHEET
THIS PROJECT, THE LOW PRESSURE REGULATOR STATION- LOWELL STREET, ANDOVER WILL ALSO BE RETIRED.

DRAWING NO:

T-1
2/27/19
General Notes

1. The proposed gas main shown is approximate and is subject to change. 6. Prior to beginning any excavation on site, the person responsible for earth moving shall notify utility owners of their intent to
excavate and to have the exact locations of the utility lines marked by contacting the one call center in their state subject to any
2. Property lines, structures, street lines, etc. were compiled using the NiSource GIS and are to be considered approximate. applicable state advance notification requirements.

3. Existing utilities, where shown, have been compiled from above ground evidence only and are to be considered approximate. 7. Proposed or completed gas facility installation location references may be indicated by a combination of the following codes:
NiSource does not guarantee the location of the underground utilities shown or that all existing utilities and/or subsurface
structures are shown. F - FRONT
BK - BACK
4. This project will adhere to all applicable federal, state or local permitting requirements for abandonment and installation of natural L - LEFT
gas pipelines. All Federal, State, and Local codes and standards will be adhered including, but not limited to, the following: R - RIGHT
Code of Federal Regulations (CFR) B - BUILDING EDGE
49 CFR 192 Pipeline Safety Regulations CLP - CENTER OF PAVEMENT
29 CFR 1910 Occupational Safety and Health Administration (OSHA) CLR - CENTER OF RIGHT-OF-WAY 09/24/2019
American Society of Mechanical Engineers (ASME) CEL - CENTER OF EASTBOUND LANE
ASME B31.8 Gas Transmission and Distribution Piping Systems CWL - CENTER OF WESTBOUND LANE
CNL - CENTER OF NORTHBOUND LANE
5. All NiSource design codes and standards will be adhered to as applicable. These standards include but are not limited to the CSL - CENTER OF SOUTHBOUND LANE
following (note state-specific designations where applicable): CU - CURB
GS 1100.010(IN, KY, MA, MD, OH, PA, VA) Locating Gas Facilities D - DRIVEWAY EDGE
GS 1100.040(MA and VA only) Damage Prevention When Using Conventional Excavation Technologies EP - EDGE OF PAVEMENT
GS 1100.050(IN, OH, VA) Damage Prevention - Using Trenchless Technology ES - EDGE OF SIDEWALK
GS 1170.010(IN) Gas Control Room Management PL - PROPERTY LINE
GS 1210.010(MA) Nondestructive Testing And Visual Inspection
GS 1300.010 Fusion And Mechanical Joining
GS 1301.010 Plastic Pipe Fusion And Mechanical Joining Qualification Of Personnel
GS 1302.010(VA) Butt Fusion Joining
GS 1304.010 Electrofusion Joining
GS 1320.010 Mechanical Coupling Connections
GS 1323.010 Flange Connections
GS 1400.010 Corrosion Control - General
GS 1410.010(VA) Metallic Pipeline Exposures
GS 1420.035 Coating Repair Methods For Mill Applied Coatings
DRAWING LEGEND
GS 1420.040 Coating Methods For Girth Welds, Fittings, Risers & Other Below Grade Appurtenances
GS 1420.410 Corrosion Control - Inspection Of Steel Pipe Coating
GS 1420.510 Installation Of Galvanic Anodes Gas Main Symbology Gas Facility Symbology
GS 1420.520 Installation Of Test Stations Existing Gas Main
Existing Gas Main to Be Abandoned
4"GV
4"PV
Gas Valve (Gate - GV, Plug - PV, PE Ball - BP, ST Ball - BV)
Critical Gas Valve
PROPOSED
GS 1430.320 Ultrasonic Thickness Gauge
Proposed Gas Main 2"HVTT High Volume Tapping Tee
GS 1500.010(MA, OH) Pressure Testing REVISIONS
Proposed Gas Main Uprate 2"SST Pressure Control Fitting - ShortStopp Tee
GS 1670.020(IN, KY, MA, MD) Odor Level Monitoring Gas Main Material/Pressure Label References 4"SPH Pressure Control Fitting - Spherical Tee
GS 1670.040 Pipeline Conditioning New Pipelines CS Coated Steel Gas Main 6"MF-BO Pressure Control Fitting - Mueller Bottom-out
GS 1680.010 Tie-Ins And Tapping Pressurized Pipelines CI Cast Iron Gas Main 6"MF-SO Pressure Control Fitting - Mueller Side-out
GS 1680.020 Plastic To Steel Transition Connections BS Bare Steel Gas Main 4"MF-FT Pressure Control Fitting - Mueller Flange Tee
GS 1680.040 Squeeze Off Procedure For Plastic Pipe WI Wrought Iron Gas Main 4"SS Pressure Control Fitting - ShortStopp
GS 1680.050 Squeeze Off Guidelines For Steel Pipe PH High Density Polyethylene Gas Main 4"MF Pressure Control Fitting - Mueller Stopper
PM Medium Density Polyethylene Gas Main Transition
GS 1690.010 Purging LP Low Pressure End Cap
GS 1708.020(IN, KY, MA, MD, PA) Leakage Surveys IP Intermediate Pressure Riser
GS 1740.010(MA, OH, PA, VA) Abandonment Of Facilities MP Medium Pressure Reducer 0
GS 1740.012(MA, PA) Abandoning Facilities - Service Tee Removal HP High Pressure EM Electronic Marker
GS 1742.010(VA) Discontinuing Gas Service Gas Main Installation Method Label References TWS Flush-mounted Tracer Wire Station REV. # DATE DESCRIPTION
GS 1754.010(KY, OH) Operation And Maintenance Of Pressure Gauges AT Attached Post Pipeline Marker with Tracer Wire
BH Bridge Hanger MM Gas Main Marker without Tracer Wire DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061
GS 1770.010 Prevention Of Accidental Ignition DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
BLGH Building Hanger W Test Well
GS 1782.010(MA) Protecting Cast Iron Pipelines DB Directional Bore R Regulator Station CHECK'D BY X X X
GS 3000.020(VA) Inspection Of Materials IS Inserted R Single Customer Regulator AS-BUILT BY X X X
GS 3000.900 Work Site Restoration OC Open Cut M Meter NAME DATE PHONE #
GS 3010.030 Bends And Elbows PB Pneumatic Bore MR
Meter with Regulator
PL Plowed T
P Test Point (Station) SITE NAME:
GS 3010.050(IN, MA) Installation Of Pipe In A Ditch
GS 3010.060(IN) Installation Of Plastic Pipe RT Roof Top T Gas Service Tie-over
(E) Existing R Gas Service Replacement INST# 19-0844295-00
GS 3010.080(MA, OH, VA) Underground Clearance (P) Proposed MMO Meter Move Out ABAN# 19-0844296-00
GS 3010.090(IN, MA, PA, VA) Cover Swing Tie Symbology
GS 3010.100(VA) Transmission Lines And Distribution Mains - Trenchless Technology
PROJECT ID# 19-62826
W1 Weld Location T Telephone Manhole HIGH PLAIN RD.
GS 3010.102(VA) Directional Boring D Drain Manhole ANDOVER, ESSEX COUNTY
GS 3010.210(MA only) Use Of End Caps On Steel Pipe T1 Gas Main Tie-in Location E Electric Manhole
GS 3020.030 Service Line Connections To Main Piping Catch Basis
A1 Gas Main Abandonment Location S Sewer Manhole
HSE 4100.010 Hazardous Atmosphere Considerations DRAWING TITLE:
Fire Hydrant
HSE 4100.020 Work Zone Traffic Protection Utility Pole
HSE 4100.040 Excavation (Trenching) Safety Property Marker
HSE 4120.010 Welding And Cutting T Telephone Pedestal GENERAL NOTES
HSE 4200.020 Protective Footwear C Television Pedestal
HSE 4200.030 Eye And Face Protection U Unknown Manhole
WB
HSE 4200.040 Hand Protection Water Box
WG
Water Gate
HSE 4200.050 Head Protection E Electric Pedestal
DRAWING NO:
HSE 4440.030(KY, MA, MD, OH, PA, VA) Spoil Handling During Excavations IP
Iron Pin
ON 18-09 Additional Requirements For Tie-Ins Involving Low Pressure Facilities
WM Columbia Gas Welding Manual
Light Pole
GN-1
2/27/19
Environmental Plan Narrative Maintenance: The job site shall be inspected by construction personnel at the end of each day to ensure that any controls are
functioning and that the work area is sufficiently contained. Required maintenance of NiSource installed controls or corrective actions
1. There is no Site-Specific Erosion Control plan requirement for this project. This plan narrative, with the project Environmental shall be performed immediately or within the time frames noted by an Environmental Inspector.
Compliance Plan (ECP), provide information regarding all environmental requirements. All NiSource construction activities must be
performed in accordance with the NiSource Environmental Construction Standards (ECS) and the project ECP. Measures previously installed by third parties shall be maintained by NiSource under the following circumstances:
1. The control is not properly functioning and is being used to contain sediment and prevent erosion immediately adjacent to
2. The project ECP must be reviewed with construction and contractor personnel prior to the start of construction activities. This NiSource work.
includes any tree clearing activities required prior to the start of pipeline construction. 2. Damage to the control is the result of work performed by NiSource.

3. All NiSource construction projects must have a clearly defined work area or limits of disturbance (LOD). The LOD includes the Projects Within Third Party Construction Sites:
permitted project area and any additional work space needed for laydown yards, soil stockpiling areas, access routes, etc. Notify
NRP of any additional work space that may be needed outside of what is shown on this job order sketch. In situations where NiSource projects are being completed within a larger project or development area, NiSource is still responsible for
ensuring our work is in compliance with all laws and regulations. This must be documented under one of the following scenarios:
Description and Minimum Requirements for Erosion and Sediment Control Measures 1. Prior to the start of construction activities, a qualified NiSource representative will verify that all NiSource work activities will be
09/24/2019
covered under the third party's approved site plan and/or SWPPP and that the appropriate EC measures are installed and functioning.
The information provided below outlines the purpose of common measures and how and when they shall be applied to the site. Figures This review will be documented and retained in the project records.
showing installation details are provided in the NiSource ECS manual. 2. If the EC measures required by the third party's approved site plan are not present or functioning, NiSource construction activities
may commence under the following conditions:
Perimeter Barriers: Perimeter barriers, such as silt fence and compost filter sock may be installed along the outside of the project area a. All disturbed NiSource work areas are stabilized at the end of the work day.
or around sensitive areas to slow and filter sediment laden runoff before it leaves the work area. b. Any NiSource work areas requiring disturbance over one working day (e.g. stockpiles, tie-in pits) will require perimeter
controls or temporary mulching or covering on a daily basis.
These measures are required in the following areas: c. The overall project SWPPP is present/available and all NiSource activities remain within compliance of all outlined
1. When work is occurring adjacent to streams, wetlands or other sensitive areas. requirements.
2. Around HDD bore pits adjacent to streams, wetlands or other sensitive areas. d. Any additional permits required for the NiSource work are obtained.
3. Around soil stockpiles that will remain uncovered for greater than one working day. e. The third party permit holder is informed of the site deficiencies and NiSource's plan to complete the work.
4. Where any work areas or excavations will remain disturbed (unstabilized) for longer than one working day.
Final stabilization measures shall be completed as described in the applicable Temporary or Permanent Stabilization sections above to
Inlet Protection: Storm drain inlet protection, both curb and drop inlets, are required in active work areas where there is functioning match the adjacent conditions of the third party project.
storm sewer to slow and filter water draining into the system. In areas where the work area is adjacent to, or water from the site flows
onto a paved roadway, inlet protection will be placed in all functioning outlets. In addition to the preceding methods, the following erosion control measures will be used on a daily basis regardless of whether the
work area is inside third party controls:
Check dams: Rock check dams may be installed in areas of concentrated flow in a ditch line to slow runoff and allow sediment to settle · Perimeter barriers around bore pits at wetland/ stream bores
prior to discharge. Check dams may also be used as a break in a perimeter barriers where runoff is concentrated and perimeter barriers · Dewatering activities using a filter bag or other approved method
are insufficient to detain runoff. Check dams are required when working in ditch lines where work will remain active for more than 1 day · Roadway cleaning daily for sediment tracked onto paved surfaces
and as a supplementary measure determined to be needed during construction.
Wetland and Stream Crossings, Sensitive Areas:
Dewatering Devices: A filter bag, or other approved dewatering device, must be used during all dewatering activities to remove
suspended sediment from the water prior to discharge into the environment. Dewatering devices must be used in areas including, but
not limited, to trench or pit dewatering and treatment of excess HDD mud.
All wetlands, stream crossings and other sensitive areas (e.g. managed lands, parks, and endangered species habitat areas) must be PROPOSED
marked in the field with caution flagging prior to the start of clearing activities and/or land disturbing activities.

Construction Entrances: In cases where vehicular access from the work area occurs at a single point for multiple days, a rock
REVISIONS
Any requirements for construction within these areas will be outlined within the ECP and the attached permit documents. These permits
construction entrance must be installed. A stabilized construction entrance may not be feasible during construction within or must also be reviewed prior to the start of construction.
immediately adjacent to a roadway as the construction project moves linearly along the road. In these cases, care should be taken to
minimize vehicular access and the roadway shall be regularly cleaned of tracked sediment throughout the work day. Alternatives to rock
entrances include the placement of timber mats or similar non erodible materials. Use of these alternatives must be approved by the
NRP group or environmental inspector.

Trench Plugs/Breakers: Trench breakers consist of sand or earth filled sacks placed at intervals along the pipeline trench. Trench
breakers may be installed at intervals within the trench to reduce water velocity along the pipeline bedding that can result in erosion
during construction and after backfilling. Trench plugs consist of clay, bentonite or other impermeable material and are required 0

adjacent to stream and wetland crossings to ensure that the flow of water along the trench line does not impact the waterbody. REV. # DATE DESCRIPTION
ENVIRONMENTAL EROSION AND SEDIMENT CONTROL SYMBOLOGY
Temporary Stabilization: Temporary stabilization includes the placement of an annual or cover crop and a straw or other mulch DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061
ENVIRONMENTAL EROSION CONTROL BLOCKS
DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
covering to protect disturbed areas from precipitation. In certain cases where redisturbance will occur prior to a normal germination (on Env-ErosionControl layer)
X X X
CHECK'D BY
period, temporary stabilization with mulch or other covering may be completed without the application of seed. AS-BUILT BY X X X
Inlet Protection IP Temporary Stabilization TAGNUMBER
NAME DATE PHONE #
Temporary stabilization will be completed on the following areas to reduce erosion from bare ground during rainfall events: Straw Wattle SW Permanent Stabilization TAGNUMBER
1. Any areas, including stockpiles or tie-in pits, which will remain open overnight without perimeter controls. SITE NAME:
Check Dam CD Erosion Control Matting
2. Any work area that will remain bare/disturbed longer than 7 days (4 in PA) without being actively worked within that time. Seeding
must be completed within this time window. Dewatering Device DW Construction Entrance INST# 19-0844295-00
ABAN# 19-0844296-00
Check Dam CD Filter Sock (12")
Permanent Stabilization: Includes the placement of a permanent seed mix and a straw or other mulch covering to permanently PROJECT ID# 19-62826
stabilize the disturbed areas. Proper ground/ seed bed preparation (e.g. topsoiling, raking, decompaction) shall be completed as Sediment Trap ST Filter Sock (18") HIGH PLAIN RD.
appropriate to the existing site area to provide a sufficient surface for seed germination. ANDOVER, ESSEX COUNTY
Trench Breaker TB Filter Sock (24")

Permanent seeding shall be completed immediately after work completion in all work areas without structural controls; regardless of TAGNUMBER
Silt Fence DRAWING TITLE:
whether the surrounding area is vegetated. Permanent seeding shall be applied within 7 days (4 days in PA) of work completion in
areas all other areas; with the exception of work area protected by adequate structural controls where the surrounding area is an active
construction site and was not vegetated prior to the start of work. Tree Protection
Environmental Impacted Area
(on Env-Impact layer) (on Env-TreeProtection layer)
ENVIRONMENTAL
Erosion Control Blanket/Matting: Erosion control blanket is a straw matting that can be rolled out over a disturbed area and secured Wetlands Area Tree Line NARRATIVE
using pins or stakes. This blanket may be required on steeper sloped areas to hold seed and mulch in place. Erosion control blanket (on Env-Wetlands layer) (on Env-TreeLine layer)
can also be useful in protecting the seed and holding moisture in dry, windy areas. Erosion control blanket must be used in restoration Stream Line Limits of Disturbance
DRAWING NO:
adjacent to streams or wetlands. It should also be used in areas with high erosion potential (e.g. steep slopes, embankments, ditch (on Env-StreamLine layer) (on Env-DisturbanceLimit layer)
lines).
ENV-1
2/27/19
10 35
41 9
31

25

19

19
52
18

15

CIR
15

AM
NH
36
40 CH 11

FAR
30 AN
DL
ER
CIR
40 105

CR
EN
24

SHA
3

W
LN
18 3

MU
RIF 4
IEL
DC
IRC 10
L E 6

117

119

117

119

8 121

9-41 7 114
121

ST
L
116-118

EL
68

W
LO
129 116-118

11

15
CUTLER

137

1-33

19
122 116-118

Know what'sbelow.
Call before you dig.
7
1
137
126

14
KIR 126
23
KL 1
AN
D
DR

8
134

23

WEST ELEMENTRY SCHOOL 22


15
11 4

138
181
9

16

30
161
27

160

52

31
36
14
5
162

CH

09/24/2019
48
AD
W
IC
K
CIR 4
12 10

SP 44 33
EN
C 167
ER
C 167
T BE
AC
O
8 N
ST
40
167
33

L-4 L-3
7 36

2
6 1
GILLEW
171
47

89 85
79 171
SERENIT

95 1
4 95
53
101
Y LN

75
39
47 1

5 177
107 69 65 57
53
2 63 173 1

L-1
57 168
33

5 RD
PLAIN
HIGH
92 7

N
ROLLING

86

141 137 7 191


141 27 13
170
179
RIDGE

21 3
100 17
104 44
84
RD

48
108
112 60

TUR
48 36 175
54
68 172

NER
145 120
32

C
BE

IR
ACO
124 N 193

151
138
134
4
58
26
8 2
ST
RE
ET
EX
T
197
0 2398.0825 4796.1649
12 178
16 8
5 174 207
180

Feet
1
8 215 182

140
1

PROPOSED
JANES 190

150 8
11
6
196
7 3

154

17
10

5
16
16
181

127
206 202
REVISIONS
WEST PARISH CHURCH
17
10

61 29
183

VIR
37 33 7
17

GIN
18

IA
41

RD
7
29
MURPHY

45

RD
Y
LE
9

IR
60

SH
9
60

59

49

34
32

L-2
5
14
11
185
53 CUTLER
56
46
46

PA
53

RIS
H
R

DR
24 15

56

0
49
10

43 5 111

39 5

11
111
REV. # DATE DESCRIPTION
54
111
195

DESIGNED BY
15

50 39
8 TH
RE
V. KOTHAPALLI 7/9/19 978-314-8061
SE
RE

RV
DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
SH

AT
IO
ER

46 N
RD
RD

15 197
105
CHECK'D BY X X X
BI

10
RC

AS-BUILT BY
H

X X X
44
RD

21

46 35
7
21

NAME DATE PHONE #


27

8
7
16

27
5 205
34

6
20
10
SITE NAME:
207

3
30
24
0
103

INST# 19-0844295-00
ABAN# 19-0844296-00
6
4
LANSBURY LN

28 MODEL HOME

2 1 18
18
209

PROJECT ID# 19-62826


HIGH PLAIN RD.
20

OD DR
CANDLEWO
14 211 97
ANDOVER, ESSEX COUNTY
P
T
PT

17
12

DRAWING TITLE:
22
15
93

13

24 215
28

11
26
0
OVERVIEW SHEET
21

29

1
EXET

3 2 221
DRAWING NO:
ER W
AY

0
2
L
RP
3
3
TE

O-1
7 S
7
5
N CA
LA

18
5 10
18
4

2/27/19
36
END OF WORK
12.0'±

BE
AC
O
N
ST EXISTING (4" CI)
12.0'±
LP GAS MAIN TO
BE ABANDONED R

5
Know what'sbelow.
Call before you dig.
MATCHLINE - SHEET L-3

KEY PLAN

L-4 L-3
L-1

7
EDGE OF PROPERTY L-2

7
13 12-13
13.0'±
EXISTING (4" BS)
21 EXISTING (6" CS) STONE WALL EXISTING (6" HDPE) 3
LP GAS MAIN TO 17
LP GAS MAIN TO (TYP) 12-2 HP GAS MAIN
BE ABANDONED
BE ABANDONED 13.0'±
START OF WORK
D
3.0'± 175
S 14.0'± 09/24/2019

S EXISTING (8" HDPE)


HIGH PLAIN RD BE HP GAS MAIN
T N

S D 15.0'± AC
3.0'± 12.0'± ON 518
9.0'± 0 480.0768 960.1536
13.0'± EDGE OF PAVEMENT ST
NEWLY INSTALLED EX Feet
(4" HDPE) HP GAS STUB T
PROPOSED (4" HDPE)
25.0'±
HP GAS MAIN 12
8 2 D
PROPOSED
16 8
518
TREE S REVISIONS
174
1 3.0'± 27.0'± (TYP) S
7530/5554
8 EXISTING (6" CS)
LP GAS MAIN TO
MATCHLINE - SHEET L-3

1 PROPOSED (2" HDPE) BE ABANDONED


HP GAS MAIN T
FENCE S
JANES
(TYP)
VIR

0
EDGE OF PAVEMENT D EXISTING (6" CI)
GIN

REV. # DATE DESCRIPTION


S
EDGE OF PROPERTY 6 LP GAS MAIN TO
I

DESIGNED BY
AR

3
BE ABANDONED V. KOTHAPALLI 7/9/19 978-314-8061
D DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
D

CHECK'D BY X X X
AS-BUILT BY X X X
D
EN R
NAME DATE PHONE #
SH E
W
3.0'± D SHA SITE NAME:
EXISTING (4" CS) D
S INST# 19-0844295-00
LP GAS MAIN TO ABAN# 19-0844296-00
25.0'± BE ABANDONED PROJECT ID# 19-62826
D
5 16 HIGH PLAIN RD.
27.0'± 16 181 D ANDOVER, ESSEX COUNTY
END OF WORK
PROPOSED (2" HDPE) RE

ST
S HP GAS MAIN SE DRAWING TITLE:

LL
RV
AT

WE
S
EXISTING (4" CS)
17
IO LAYOUT SHEET
N

LO
LP GAS MAIN TO RD
RD

16.0'± 9.0'± S 25.0'±


BE ABANDONED
Y

7 183
LE

13.0'± 17 DRAWING NO:


IR

2.0'±
SH

7
11.0'±

MATCHLINE - SHEET L-2 MATCHLINE - SHEET L-2


L-1
2/27/19
7 MATCHLINE - SHEET L-1 MATCHLINE - SHEET L-1
16.0'± 9.0'±
2.0'± MURPHY

RD
S EXISTING (4" CS)

VIR
11.0'±

EY
LP GAS MAIN TO

GIN

RL
BE ABANDONED

I
SH
IA R
13.0'±
EDGE OF PROPERTY

D
9

ST
3.0'± 9

LL
WE
EDGE OF PROPERTY S
16.0'± R

13.0'±

LO
PROPOSED (2" HDPE) 9.0'± 12.0'±
HP GAS MAIN
Know what'sbelow.
S
9.0'± Call before you dig.
D
S 5 EXISTING (8" HDPE) KEY PLAN
3.0'±
11
21.0'± HP GAS MAIN
L-4 L-3
185 L-1
CUTLER
5612-73 EXISTING (6" CI) L-2
LP GAS MAIN TO
TREE S BE ABANDONED
EDGE OF PAVEMENT
(TYP)
EDGE OF PAVEMENT
R 15.0'±
S 15

EXISTING LOWELL ST 09/24/2019


REGULATOR STATION
TO BE ABANDONED N
26.0'±
5612-74

0 40 80

Feet

EXISTING (8" HDPE)


PROPOSED
HP GAS MAIN REVISIONS

195

15

REV. # DATE DESCRIPTION

DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061


197 DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
CHECK'D BY X X X
AS-BUILT BY X X X
NAME DATE PHONE #

SITE NAME:

INST# 19-0844295-00
ABAN# 19-0844296-00
PROJECT ID# 19-62826
HIGH PLAIN RD.
ANDOVER, ESSEX COUNTY
7

DRAWING TITLE:
205

LAYOUT SHEET
10

DRAWING NO:

207 L-2
2/27/19
R

Know what'sbelow.
Call before you dig.

KEY PLAN

L-4 L-3
MATCHLINE - SHEET L-4

L-1
47
L-2

53

39
47
STONE WALL
57 EXISTING (6" BS) (TYP)

MATCHLINE - SHEET L-1


53 LP GAS MAIN TO
63 09/24/2019
BE ABANDONED
57 EDGE OF PAVEMENT N
33
27.0'±
0 40 80
3.0'± HIGH PLAIN RD S 3.0'±
Feet
S
3.0'±
16.0'± S 6" BS - LP -1
968 PROPOSED
32.0'± 15.0'± S 27
17.0'± 3.0'±
EXISTING (6" BS) REVISIONS
13.0'± LP GAS MAIN TO
44 6" B BE ABANDONED
21.0'± S-
PROPOSED (4" HDPE) 48
D LP
-18
00
60 TREE HP GAS MAIN EDGE OF PROPERTY
S
(TYP) 54
48 36
17.0'±
S
32
MATCHLINE - SHEET L-4

0
FENCE 3.0'±
L P -180
S- 0
11.0'± 4" B
(TYP) S
14.0'± REV. # DATE DESCRIPTION

58 DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061


26 DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
CHECK'D BY X X X
AS-BUILT BY X X X
NAME DATE PHONE #
S
SITE NAME:
1
INST# 19-0844295-00
ABAN# 19-0844296-00

MATCHLINE - SHEET L-1


1
PROJECT ID# 19-62826
HIGH PLAIN RD.
ANDOVER, ESSEX COUNTY

DRAWING TITLE:

LAYOUT SHEET

S
DRAWING NO:

10 L-3
2/27/19
R

Know what'sbelow.
Call before you dig.

KEY PLAN

MATCHLINE - SHEET L-3


L-4 L-3
L-1
STONE WALL L-2
85
89 79 (TYP)
95
95

101 TREE FENCE


(TYP) EDGE OF PROPERTY 75 (TYP)
EXISTING (6" CS)
LP GAS MAIN TO
107 S BE ABANDONED 69 65
S 09/24/2019

S
S N
16.0'±
LAIN RD END OF WORK
IG H P 15.0'± 3.0'±
H
#4682 0 40 80
92 S 3.0'±
19.0'± Feet
86
PROPOSED (4" HDPE) PROPOSED
HP GAS MAIN
12.0'±
15.0'± REVISIONS
100
104
84
108

EDGE OF PAVEMENT
68

MATCHLINE - SHEET L-3


ROLLIN

S
0

TU
REV. # DATE DESCRIPTION

R
G RIDG

NE
DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061

RC
DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
4
CHECK'D BY X X X

IR
E RD

AS-BUILT BY X X X
NAME DATE PHONE #
5
SITE NAME:

INST# 19-0844295-00
ABAN# 19-0844296-00
PROJECT ID# 19-62826
HIGH PLAIN RD.
ANDOVER, ESSEX COUNTY

8 DRAWING TITLE:
11
S
7 LAYOUT SHEET

DRAWING NO:

17
L-4
2/27/19
AS-BUILT NOTES
(TO BE COMPLETED DURING CONSTRUCTION)

PROPOSED
REVISIONS

REV. # DATE DESCRIPTION

DESIGNED BY V. KOTHAPALLI 7/9/19 978-314-8061


DRAWN BY V. KOTHAPALLI 7/9/19 978-314-8061
CHECK'D BY X X X
AS-BUILT BY X X X
NAME DATE PHONE #

SITE NAME:

INST# 19-0844295-00
ABAN# 19-0844296-00
PROJECT ID# 19-62826
HIGH PLAIN RD.
ANDOVER, ESSEX COUNTY

DRAWING TITLE:

CONSTRUCTION
DETAILS

DRAWING NO:

D-1
2/27/19
Columbia Gas – High Plain Road Motion

I move that the Board approve, subject to the review and approval of Andover Department of
Public Works Engineering Division and Andover Fire Rescue, the petition of Columbia Gas
requesting the permission to excavate for the purpose of replacing and/or extending its gas
mains, according to blueprints provided in the petition, and to make necessary house connections
along said extensions, on approximately 2800 feet on High Plain Road from Beacon to 79 High
Plain Road and 1,000 feet on Virginia Road and Shirley Road.

Moved by_____________________
Seconded by___________________
Voted_________ to _____________

You might also like