CONCRETE NOTES STRUCTURAL COMPOSITE LUMBER - PSL, LVL, AND LSL CUSTOM HEAVY TIMBER FRAMING SECONDARY COMPONENTS AND THEIR ATTACHMENTS
1. Structural drawings are to be read in conjunction with other related drawings including existing drawings, 1. a) All concrete shall conform to the requirements of CAN/CSA. A23.1. Cement shall be Type GU Portland 1. Where specified on drawing, the following structural composite lumber products are acceptable: 1. Custom Heavy Timber framing shall conform to CAN/CSA 086. 1. Secondary components include but are not limited to the following:
for dimensions, elevations, roof and floor slopes and presence of openings, inserts, and existing Cement unless noted otherwise. Normal weight concrete for various purposes shall be as follows: (Refer to all contract documents for secondary components)
underground services and mechanical/electrical elements. Do not scale off of the drawings or PSL (Parallel Strand Lumber) i) 2.2E WS Parallam PSL by Trus Joist Weyerhaeuser 2. Contractor to check and confirm all dimensions prior to fabrication including coordination with steel
electronic/computer files, written dimensions always take precedent. Hard copy drawings are the official shop drawings. a) Architectural components such as guard and hand rails, flag posts, canopies, ceilings, etc.
documents for the project and always take precedent over electronic/computer files. MIN. 56 DAY MAX. MAX. SIZE EXPOSURE Air Min. replacement LVL (Laminated Veneer Lumber) i) 1.9 E LVL Microllam by Trus Joist MacMillan b) Site work elements exterior to the base building such as landscaping components, lamp standards,
STRENGTH SLUMP AGGREGATE CLASSIFICATION Content fly ash for ii) Gang-Lam @2950 Fb 2.0E 3. Submit 4 sets of shop drawings for all heavy timber construction to the Engineer for review pools, signs, and civil work.
2. Prior to commencement of work, the Contractor shall compare all related drawings; confirm all dimensions ELEMENTS MPa(psi) mm.(inch) mm.(inch) % cement (%) iii) Teclam 2.0E LVL by Tecton Laminates Corp prior to fabrication. Shop drawings shall show all connections and details and indicate all c) Cladding, window mullions, glazing and store fronts.
and field measure/confirm all existing conditions. Report any discrepancies to the Architect and Engineer d) Skylights and glass canopies.
applicable material specifications. When member design forces are shown on plan or
of Record ("Engineer" henceforth). Foundations and Footings 25 (3600) 75 (3") 20 (3/4") F2 / N 4-7 50 LSL (Laminated Strand Lumber) i) 1.3E Timberstrand LSL by Trus Joist Weyerhaeuser e) Attachments and bracing for electrical and mechanical components.
details, shop drawings shall be submitted and sealed by a Professional Engineer registered
f) Elevators, hoist beams and rail support members.
in the province of B.C. Do not proceed with fabrication until shop drawings have been
3. If discrepancies relating to structural work are found in the various documents, the more stringent Walls 30 (4350) 75 (3") 20 (3/4") F2 4-7 50 2. All structural composite lumber shall conform to CSA 086.1. g) Architectural precast and precast cladding.
approved by the Engineer.
provisions shall apply, unless approved by the Engineer. Specifications shall control over these h) Window washing equipment and attachments.
drawings and General Notes only where the specifications provide for more stringent requirements. Suspended slabs, beams 30 (4350) 75 (3") 20 (3/4") F2 4-7 30 3. Structural composite lumber shall be identified with name and plant number of the manufacturer, grade j) Interior and exterior light gauge steel stud walls.
Contractor, suppliers and subtrades are to ensure that they are working with the 'Issued for and stairs of lumber, NER of CCMC report number and name of quality control agency, unless noted otherwise. 4. Heavy timber members to be glulam, solid wood decking, structural composite lumber, shaped sawn k) Roofing material.
Construction' drawings. timber, peeler cores, or peeled logs as per drawings and to be free of staining, grade stamps, etc. l) Architectural brick veneer.
Arch. concrete (see Arch.) 4. Substitution of the above structural composite lumber is permitted only with the Engineer's written approval. Store timber under cover and protect from staining at all times with proper drainage. m) Fall restraint anchors (and any additional required framing not shown on plan).
4. Bracing of the structure and all components during construction, including any underpinning, shall n) Snow guards / fence.
remain the sole responsibility of the Contractor. Exterior 30 (4350) 75 (3") 20 (3/4") F2 4-7 30 5. Manufacturer is responsible to supply all steel hangers and brackets required to support the member, unless noted 5. Sawn timber to be graded as indicated on drawings. All timbers to be seasoned to 15% moisture p) Library stacks.
otherwise. Steel hardware to be ASTM A36 or better and bolts shall be A307. Hot dip galvanize all steel content or below before fabrication.
5. These drawings show requirements for completed structure only. The design and inspection of Interior 30 (4350) 75 (3") 20 (3/4") N - 30
connectors including fasteners, where exposure to rain during or after construction may cause rusting/staining of 2. Design and detailing of the above items and their attachments are not the responsibility of the Engineer.
falsework, shoring and reshoring is the responsibility of the Contractor and shall conform to WCB wood exposed to view. 6. All steel members and hardware to be painted in accordance with Architect's specifications or hot-dipped
They shall be designed by Specialty Structural Engineers, registered in the province of British Columbia
401 - 134 Abbott Street
standards. Slabs on grade galvanized prior to shipping to site. Unless special precautions are taken to protect steel from rusting, Vancouver, BC
and RETAINED BY THE CONTRACTOR, who will seal all related shop drawings, review the components
6. Follow manufacturer's recommendations for handling , storage installation and detailing of structural refer to Structural Steel Metals notes for galvanizing of steel connections.
Exterior 32 (4650) 75 (3") 20 (3/4") C1 5-8 30 and their attachments in the field and provide all required sealed letters (Schedule S-B & S-C) to the Canada V6B 2K4
6. All shop drawing reviews by the Engineer constitute review for general concepts only; the detailed composite lumber, including fastening of multiple laminations. Engineer.
7. All work to be architectural quality, including precision cutting and fitting, steel welding, etc.
design remains the responsibility of Contractor/Fabricator. All components shall be assembled and
Interior 32 (4650) 75 (3") 20 (3/4") - - 30 Take precautions to avoid damage and staining of wood during construction.
t: 604-683-5060
erected in accordance with final reviewed shop and erection drawings. No fabrication/erection shall 7. All exposed PSL shall be architectural quality finished unless otherwise noted.
proceed until review has been completed by the Engineer.
3. Secondary components and their attachments shall be designed in accordance with e: info@urban-arts.ca
Topping concrete 32 (4650) 100 (4") 10 (3/8") - - 30 8. Work points are as noted on drawings. Part 4 of the B.C. Building Code as in GENERAL section.
7. Design Loads: Masonry Grout 20 (3000) 200 (8") 10 (3/8") - - 50
WOOD FRAME
4. Sealed shop drawings of the secondary or non-structural components which may affect the primary SEAL:
9. Pre-drill for all lag screws with holes per CSA-086.
structural system shall be submitted to the Engineer only for the review of their effect on the primary
Use F2 exposure for exterior concrete elements and N exposure for interior concrete elements 1. Wood framing and heavy timber construction shall conform to CAN/CSA 086.
a) Specified uniform loads Live Load Superimposed 10. Where practical, shop fit initially fabricated members early during fabrication structural system.
unless noted otherwise.
(u.n.o. on plan) Dead loads 2. Unless noted otherwise, joists, stud framing, built-up posts, built-up beams shall be K.D S.P.F #2. Top on a trial basis. Review with Engineer prior to proceeding further.
5. Sub-contractor of these components is responsible for protection of connections of dissimilar metals
b) Slumps listed are before the addition of super plasticizers. Tolerance in specified slump shall be and bottom plates shall be D.F. #2 or better. Solid wood posts and beams to be Douglas Fir #1.
Roof Snow load based on: Ss= 1.9 kPa 1.5 kPa (INCLUDING GREEN against galvanic corrosion.
± 20 mm (3/4"). 11. Where timber rivets are shown drive rivets into the timber with wide face parallel to grain. Rivets
Importance = 1.0 Normal Sr= 0.3 kPa ROOF WHERE INDICATED) 3. Unless noted otherwise, all framing, bridging, blocking, and nailing shall be in accordance with Part 9 of the in group shall be driven starting from the outside in a spiral sequence toward the center of the
6. In addition to construction tolerance, secondary components shall be detailed for the following
c) No calcium chloride is permitted in any form in the concrete mixes. Building Code (see section 'GENERAL' line 8, this drawing). Provide 38x38 (2"x2") bridging or solid blocking at plate. Rivet plates shall be 6mm (1/4") hot dip galvanized, unless noted otherwise and shall be
2nd Floor 3.1 kPa 0.8 kPa building movement and deflection:
2100mm (7'-0") o.c. for all spans greater than 3000mm (10'-0"), with 13mm (1/2") gap between bridging. pre-drilled for rivets with 7mmØ (9/32") dia. hole (hole punching is not permitted). Unless noted
Main Floor 4.8 kPa 1.5 kPa d) Submit mix designs to the Engineer and testing agency for review and approval prior to placement. otherwise typical rivet spacing is 25x25mm (1"x1"). Plate size is to accommodate the rivet group a) Vertical deflections of beams, slabs and decking: L/180, (25mm min.)
Mix design submittals shall identify the elements for which they are intended. 4. Unless noted otherwise, built-up beams and posts shall consist of minimum 2 members. Minimum lintel shall be plus 12mm (1/2") beyond centerline of outermost hole to edge of plate.
(INCLUDES PARTITIONS) Differential deflections of edge beams and edges of slabs: L/240, (16mm min.)
1-89x241 (3 1/2"x9 1/2'") LSL (Timberstrand) or 2-38x235 (2"x10")
Stairs, Corridors and Storage 4.8 kPa e) Fly ash replacement (where noted) is the mass of fly ash as a percentage of the total mass of 12. Sheathing (unless noted otherwise): b) Horizontal drift during wind and earthquake between floors:
cementing material. 5. Laminate studs solid beneath all beam ends and carry through to concrete foundation below. Unless
All sheathing shall be D.Fir plywood (DFP) exterior grade, conforming to CSA 0121 and 0151. Drift without damage to components: 0.003 x height
Superimposed dead loads are non-structural dead loads including architectural topping, partitions (for noted, built-up studs shall match number of laminations in built-up member being supported. Fully
2. Perform all works in accordance with CAN/CSA A23.1, including the following: Drift without collapse to components: 0.025 x height typical building
LL<4.8 kPa) roofing material, pavers, ceiling finishes and mechanical/electrical conduits/fixtures. block all joist spaces below point loads. Take care to ensure beams bear fully on supporting members. Place plywood sheets as indicated on plans.
0.020 x height for schools
a) Construction Tolerances 0.010 x height for post-disaster buildings
6. Install double cripples under lintels unless otherwise noted. 13. Where light gauge connections are indicated, use galvanized Simpson Strong-Tie connectors or approved equal.
b) Seismic and Wind b) Fabrication and placement of reinforcing
c) Placement of concrete, including proper vibration and curing. c) Movement at expansion joints (u.n.o.):
7. Joists are minimum 38x235 @ 400mm (2"x10" @ 16") o.c. unless otherwise noted. Install double joists Perpendicular: ± 50mm (2") min.
Importance = 1.0 Normal
Seismic load based on: Seismic Data
3. Take all precautions to ensure exposed concrete achieves finish desired by the Architect, including
under parallel non-load bearing partitions above. NAIL-LAMINATED TIMBER (NLT) Parallel: ± 50mm (2") min. NOTES:
Sa (0.2) Sa (0.5) Sa (1.0) Sa (2.0) PGA Site Class C Vertical: ± 25mm (1") min.
proper forming, mix design, site care and adequate vibration. Protect against damage during stripping 8. Interior bearing walls - unless otherwise noted:
Fa = 1.0 Fv = 1.0 This drawing is the property of Urban Arts Architecture and may not be
0.94 0.64 0.33 0.17 0.46 and entire construction period. 1) Perform all Work in accordance with CSA O86 and Specification Section 06 15 29.
Rd = 3.0 Ro = 1.7 reproduced without their permission and unless the reproduction carries
a) Minimum stud requirements are as follows: 2) Provide mockup of decking for review and approval by Architect and Consultant. Where decking is prefabricated in modular their name. All designs and all other information shown on this drawing
Wind load based on q 1/50 = 0.48 4. See Architectural drawings for slab elevations, drainage, slopes and locations of reglets, reveals and chamfers.
panels, build one full panel. Where decking is erected in place, install a minimum area of one meter by one meter (10 square ARCHITECTURAL BRICK VENEER are for use on the specified project only and shall not be used otherwise
q 1/10 = 0.36 Unless noted otherwise, exposed corners of slabs, beams, slab bands, columns and walls shall be 1st floor 38x89 @ 300 (2"x4" @ 12") o.c.
beveled 20mm x 20mm (3/4"x3/4"). feet). Mockup must illustrate typical wood appearance, coating, and finish. without written permission of this office.
Importance = 1.0 Normal or 38x140 @ 400 (2"x6" @ 16") o.c. 1. Brick veneer ties and installation shall meet the requirements of CSA-A370. Contractor shall submit
3) Following approval of mockup, submit shop drawings showing fabrication and erection of all prefabricated panels to the
5. Blockouts, nailers, conduits, ducts, pipes, sleeves and other openings are subject to approval by the Engineer. 2nd floor 38x89 @ 400 (2"x4" @ 16") o.c. sample of tie to the Engineer for approval prior to commencing work. The Contractor shall check and verify all dimensions and report any
8. These drawings show structural work required to meet provisions of Part 4 (and Part 9 where or 38x140 @ 400 (2"x6" @ 16") o.c. Consultant for review prior to fabrication. Show all connections and details, joint patterns, material specifications, and
discrepancies before proceeding.
applicable) of the BCBC 2012. a) Openings and conduits are not permitted in wall zones, within 990 mm (39") of wall ends and finishes; include an erection layout for all panels. Do not proceed with fabrication until shop drawings have been approved by 2. Refer to Architectural drawings for locations and layout of brick veneer and locations and length of ledger.
b) Anchor stud walls to concrete with 16Ø x 250 long (5/8"Ø x10") anchor bolts with standard nut & the Consultant. Unless otherwise noted, provide L125x125x10 (L5"x5"x3/8") lintel angle over window or door openings
intersections and columns. Do not scale drawings.
9. Design of Secondary component items including their attachment to the structure is the responsibility washer at top & standard washer & double nuts at bottom @ 1200mm (4'-0") max. and at 200mm less than 1500mm (5'-0") wide. Consult the Engineer retained by the Contractor for openings greater
of others. 4) Store all materials and assembled panels under cover with proper drainage. Protect from staining and damage at all times
b) Where permitted, space openings 2 diameters, or minimum 150 mm (6") apart. (8") from end and corner of walls and edge of window/door openings, 300mm (12") where hold than 1500mm (5'-0"). CONSULTANT:
down bolt is indicated on plans. during fabrication, transportation, and erection. Take all necessary precautions to keep decking dry after installation, including
temporary sloping tarps and UV protection.
10. All codes and documents referred to in these General Notes are to be the current adopted edition.
11. Supply of Record Drawings is outside the scope of services.
c) Single openings larger than 300 mm (12") or a group of openings occupying together more than 300x300 mm 9. Shear walls and exterior bearing walls - unless noted otherwise on drawings: 5) Provide sawn timber grades and sizes as indicated on the Drawings. Use KD SPF #1/#2 unless noted otherwise.
3. Unless otherwise noted, provide and install brick veneer ties on 800mm x 400mm (32"x16") grid or
400mm x 800mm (16"x32") grid plus 1 extra row of ties at top of wall, and below openings.
Fast +Epp
(1.0 sq. ft.) in any 1 sq. meter (10 sq. ft.) area shall not be permitted without the approval of the Engineer.
6) Hand select members to ensure straightness and architectural-quality appearance. No wane, knot holes, grade stamps, or structural engineers
a) Walls shall be constructed with 13mm (1/2") plywood sheets (1 side) on wood studs. Refer to notes on wall 4. All steel supports and connectors, including bolts and screws shall be stainless steel. Touch up all field
FIELD REVIEW AND TESTING stains are permitted to be visible in the completed structure. Where pine beetle kill wood is specified, hand select all welds with galvacon after erection.
6. Expansion and/or construction sequence joints shall be installed in concrete structures greater than sheathing below for nailing and blocking requirements of plywood. Suite 201
members to ensure beetle staining is visible. For bidding purposes, assume a minimum of 30% - 40% lumber rejection rate to
45m (150 ft.) in length, details and locations shall be discussed with and approved by the Engineer in achieve acceptable appearance with #2 grade material. Higher grade material (e.g. J-grade or MSR lumber) will reduce the 5. Tie installation shall be supervised/inspected by a Professional Engineer retained by the Contractor. 1672 West 1st Ave T 604 731 7412
1. The Contractor is solely responsible to give the Engineer reasonable advance notice of when structural writing prior to construction. Fasten bottom wall plate to floor sheathing with 95mm (3 3/4") long spikes at 100mm (4") o.c. and to concrete
work is ready for reviews by the Engineer (min. 24 hours prior to pour or concealment). Contractor is rejection rate and may be substituted for #2 grade at Contractor's option. The same Engineer shall submit a sealed letter of approval to the Project Engineer following installation. Vancouver BC F 604 731 7620
with 20mmØ x250mm long (3/4"Ø x 10") anchor bolts complete with 65mmØ x6mm (2 1/2"Øx1/4") plate washers
responsible for reviewing their own work and the work of their subtrades prior to review by the Engineer. 7. Stripping of forms for structural elements is not allowed until concrete strength has reached 50% of the 28 day at top of bolts & standard washer & double nuts at bottom, space bolts @ 800mm (2'-6") o.c. maximum and at 7) Confirm all dimensions prior to fabrication. Coordinate with shop drawings of other trades, and take field measurements as 6. Design and detailing of the above items and their attachments are not the responsibility of the Engineer. Canada V6J 1G1 mail@fastepp.com
compressive strength for columns and walls, 70% of the 28 day compressive strength for slabs and beams (use % of 56 200mm (8") from end and corner of walls and edge of window/door openings. Add hold down anchors by required. They shall be designed by Specialty Structural Engineers, registered in the province of British Columbia
2. All structural work requires written review by the Engineer, including: day compressive strength if fly ash content in concrete mix exceeds 25% replacement). Strength of concrete shall be Simpson Strong-Tie where noted on plan.
8) Prefabricate panels in a shop environment for quality control. and RETAINED BY THE CONTRACTOR, who will seal all related shop drawings, review the components
determined from field-cured cylinders. SEE PLAN
and their attachments in the field and provide all required sealed letters (Schedule S-B & S-C) to the
a) Concrete Reinforcement b) Ensure shear walls are connected to floor/roof plywood (truss blocks or joists where required) with 9) Place soffits of timbers so the least number of checks and knots will be visible in the completed structure. Placement Engineer.
b) Structural Steel (including decking) minimum 75mm (3") long nails @ 100mm (4") o.c. JAF
tolerance for timber soffits is plus or minus 2mm.
c) Wood framing (including sheathing) 8. All hot and cold weather concrete work shall be carried out in accordance with CAN/CSA A23.1.
10) Arrange timbers in controlled random pattern or aligned joint pattern as indicated on the Drawings. NdR
a) When temperature is expected to fall between 3°C and -10°C within 3 days of pouring concrete, 10. Provide sill gasket under all wood sill plates in contact with concrete. Provide peel and stick membrane to all
3. Material testing shall be directed by the Engineer at the expense of the Owner.
the Contractor shall carry out one or more of the following procedures: other wood surfaces in contact with concrete, sill plates to pressure treated u.n.o.
Aug. 2013
a) Controlled random pattern specifications:
4. Concrete testing shall be in accordance with CAN/CSA A23.2 and carried out by an independent 11. Sheathing - unless noted otherwise:
testing agency approved by the Engineer. Unless permitted by the Engineer, a minimum of 3 test i) Make provisions to heat mix water or aggregate to maintain a minimum concrete i) Where end joints occur in adjacent courses, they must be staggered by 1000mm. 1806
cylinders shall be cast for each 50 cu. meter/50 cu. yards or each day's pour, whichever is less. temperature of 10°C. All sheathing shall be D.Fir plywood (DFP) exterior grade conforming to CSA 0121 and 0151. Place
sheets with face grain running perpendicular to supporting members in a staggered joint pattern. ii) Where end joints occur in the same general line, they must be separated by a minimum of three intervening courses.
Test one at 7 days and two at 28 days (with two additional at 56 days when concrete mix exceeds
ii) Make provisions to heat the form work or soil surface. Concrete shall not be poured against iii) Each timber must extend over a minimum of one support.
25% flyash replacement). Submit written reports for review by the Engineer. Test reports shall Minimum sheathing requirements shall be as follows:
any surface with a temperature less than 3°C (Calcium chloride or other de-icing salts are
identify the locations where concrete is being tested with gridlines and elevations. iv) Joints are to have an appearance of randomness from below.
not permitted).
a) Wall sheathing -13mm (1/2") plywood fastened with 75mm (3") long common nails @ 100mm (4") o.c. at sheet edges v) Nail together as indicated on the Drawings.
5. Submit concrete test results max. 24 hours after test.
iii) Cover concrete with insulation blanket for the first 36 hours after pouring concrete. Do not and @ 300mm (12") o.c. at intermediate studs. All unsupported edges shall be blocked with 50mm (2") nominal
pour when temperature is expected to fall below -10°C within 3 days after pouring. blocking and nailed as above. Drill adequate holes in exterior walls for ventilation.
6. The Owner shall appoint an independent CSA certified testing agency to carry out representative b) Aligned joint pattern specifications:
testing of bolt torque and welding on structural steel work, including decking. This testing shall take iv) Make provisions for a heated enclosure to maintain the temperature of all concrete surfaces b) Floor sheathing -16mm (5/8") T & G plywood, glued and fasten with 75mm (3") long common nails at 150mm (6") o.c.
place prior to concealment of all structural steel. i) Place timbers with joints centered over support members below. No joints are to be visible from below.
above 10°C for a minimum of 3 days after the pour. at sheet edges, and @ 250mm (10") o.c. at intermediate supports.
ii) Nail together as indicated on the Drawings.
7. All structural steel welds shall be tested by a qualified testing agency to the following criteria (u.n.o.): v) Provide alternate mix designs for cold weather. c) Roof sheathing -13mm(1/2") plywood fasten with 75mm (3") long common nails at 150 mm (6") o.c. at sheet
edges and @ 250mm (10") o.c. at intermediate supports. Provide H clips between each joist.
a) Ultra sonic test 100% of all shop and field complete penetration (CP) welds. 11) Where practical, shop fit panels early during fabrication on a trial basis. Review with Consultant prior to proceeding further.
b) When the temperature is expected to rise above 25°C the Contractor shall:
b) Magnetic particle test 15% of all field fillet welds. 12. Substitution of common nails with power driven nails (P-nails) of the same length and diameter is acceptable.
c) Visual inspection of 100% of all shop and field welds. i) Make provisions to cool concrete to maintain a max. temperature of 30°C. Substitution of power driven nails of smaller diameter is permitted ONLY with the Engineer's approval. 12) Clearly mark top surface of panels for identification during erection.
8. Additional testing and field review resulting from rejection of more than 5% of work will be at the ii) Make provisions to prevent concrete from drying. 13. Unless otherwise noted, use galvanized Simpson Strong-Tie connectors or approved equal where required. Use joist
Contractor's expense. hangers (minimum 1000 lbs capacity) for all flush framing. Fully nailed pressure blocks may be used where permitted 13) Make adequate provision for possible erection stresses. Set panels level to correct positions. Securely brace decking and
9. Take measures to minimize shrinkage cracking including covering and dampening concrete in the curing stage. in writing by the Engineer. Steel hardware to be ASTM A36 or better and bolts shall be A307. Refer to Structural anchor in place until permanently secured by finished structure.
Steel Metals notes for galvanizing of steel connections. All fasteners in contact with pressure treated wood to be
FOUNDATIONS 10. Unless otherwise noted, provide 3.2mm wide x T/4 deep(1/8" x T/4) deep control joints in two directions Zmax coated (or approved equivalent). 14) Fit panels closely and accurately to required levels and lines without trimming, cutting, or other modifications, unless
in grade slabs centered on column lines, and maximum at 4500mm (15 ft.) o.c. (T = slab thickness) approved in writing by the Consultant.
1. Design of foundation is based on the soils report of January 27, 2011, by Geopacific Consultants Ltd. with an 14. All lag screws to be machined threaded, not cast threaded.
allowable bearing pressure of 400 kPa for spread footings on native fill and 150 kPa on engineered backfill.
All footings shall bear on soil capable of this pressure without failure or undue settlement. If native soil or fill 11. Unless otherwise noted, where expansion anchors are required, use Hilti KB 3 or approved equal.
15) Site cutting or boring of decking, other than shown on shop drawings, is not permitted without written consent of the
are found during construction to have a lower allowable bearing pressure, notify the Engineer, and provide Where chemical anchors are required, use Hilti HIT HY200 MAX epoxy, or approved equal. GLUED LAMINATED TIMBER-GLULAM (GL) Consultant. Coat all field-cut openings with minimum two coats of clear sealer.
revised foundation to the Engineer's specifications.
1. All Glulam members shall meet the following specification. Any substitution must have the written
2. Follow all recommendations given in soils report for preloading, backfill, drainage, sub-base preparation
REINFORCING NOTES approval of the architect and the engineer. 16) Provide sill gaskets below and between laminations where assembly passes over exterior walls.
and other requirements. Species: Douglas Fir.L
1. Reinforcing shall be new billet steel conforming to the following standards:
Stress Grade: Beams 24f-E (24f-EX for cantilever or continuous beams) 17) Provide moisture barrier at all locations where decking abuts concrete or masonry construction.
3. Contractor is solely responsible to ensure that Geotechnical Engineer reviews and confirms allowable Columns 16c-E
a) 10M and larger CSA G30.18 400 MPa
bearing pressure and approves subgrade installation prior to pouring concrete for footings foundations. Service Grade: Exterior
b) Weldable reinforcement CSA G30.18 400W MPa (welding to CSA W186) 18) Provide gaps as required for construction tolerances and swelling. Details and locations shall be discussed with and
c) Welded wire mesh CSA G30.5 Appearance Grade: Commercial where the member is concealed, Quality elsewhere
4. The Owner shall retain an approved testing agency to carry out density testing of subgrade and base material. Sealer: Polyurethane, one component. approved by the Consultant in writing prior to construction.
d) Epoxy coated reinforcement ASTM A775
Testing of subgrade material is to be carried out immediately prior to installation of slab on grade components Adhesive: Clear
and during lifts as specified by the Geotechnical Engineer. Care must be taken not to disturb subgrade after Note: 1) Weldable reinforcement (including deformed bar anchors) must be clearly identified on each 19) See “Wood Framing” section of these General Notes for fastener requirements. All accessories are to be painted in
approval and prior to pouring concrete. piece. 2. All glulam members shall conform to CSA 086 and glulam manufacturer must qualify under CSA accordance with Architect's specifications or hot dip galvanized prior to shipping to site. See “Structural Steel” section of these
5. Contractor shall be responsible for all temporary drainage during excavation. 2) Reinforcement in concrete shear walls and frame members with force modification factors Rd greater standard 0177. General Notes for galvanization requirements.
than 2.0 shall be weldable grade in conformance with CSA Standard G30.18.
3. Camber simple span beams 6mm (1/4") per 3000mm (10'-0") of span.
6. Do not backfill retaining walls until full concrete strength is reached unless otherwise approved by the 20) Provide plywood sheathing as indicated on the Drawings. Place sheets with face grain running perpendicular to supporting
2. Reinforcement shall have concrete protection as follows, unless noted otherwise:
Engineer. Consult the Engineer prior to pour to confirm if floor/roof restraint required prior to backfilling. members in a staggered joint pattern unless noted otherwise. Glue and fasten to decking with 75mm (3”) long common nails at
4. Submit 4 sets of shop drawings showing all applicable details and material specifications to the
Fire Resistance Rating Engineer for review prior to fabrication. Shop drawing shall be accompanied by a certificate of 100mm (4”) o.c. at sheet edges and @ 250mm (10”) o.c. at sheet interior.
7. All footings shall be centered on columns and walls unless noted otherwise.
0-2 hrs. 3 hrs. conformance to manufacturing standard. When member design forces are shown on plan or
8. Concrete placed under water shall conform to CAN/CSA-A23.1. details, shop drawings shall be submitted and sealed by a Professional Engineer registered in 21) See architectural Drawings for finish requirements to wood soffit.
a) All surfaces placed in contact with ground 75mm (3") 75mm (3") the province of B.C. Do not proceed with fabrication until shop drawings have been approved
b) Formed surfaces exposed to ground or weather 50mm (2") 50mm (2") by the Engineer.
9. Provide 50mm (2") thick concrete ground seal under footings/grade beam if required by site conditions.
c) Walls 32mm (1 1/4") 32mm (1 1/4") 22) Final approval by Architect will be after installation of all decking. Remove and replace all Work that does not conform to the
and/or by Geotechnical Engineer.
d) Slabs 25mm (1") 40mm (1 1/2") 5. Affix authorized label to all members supplied. Also identify each member with mark number. standard of the approved mockup, at Architect's request. Replacement of defective Work is at Contractor's expense.
e) Slab on grade (from top of slab) 40mm (1 1/2") ----
10. For all elevations and drainage slopes, see Architectural Drawings and requirements identified in the f) Other, unless otherwise noted 40mm (1 1/2") 40mm (1 1/2") 6. Store glulam off the ground with spacer blocks placed between members. Keep wrapping on the 23) Provide gradual heating of enclosed building to minimize cupping and checking.
geotechnical report.
members until permanent protection from the weather is in place but cut holes on underside to prevent
3. All reinforcing bars and stud rails shall be accurately placed, chaired and tied securely to prevent the accumulation of condensation. ABBREVIATIONS
11. Unless noted otherwise, design and supervision of excavation, shoring and underpinning of adjacent displacement and to maintain the specified cover. Install column reinforcement accurately with templates.
structures, where required, shall be carried out by a Professional Geotechnical Engineer retained by Provide CSA standard hooked dowels from bottom of footing to match and lap with verticals. Install masonry A.BOLTS - ANCHOR BOLTS LLH - LONG LEG HORIZONTAL
7. Steel hardware to be ASTM A36 or better and bolts shall be A307. Refer to Structural Steel Metals notes
the Contractor. All costs are to be included in this contract. dowels accurately to align with center of walls. Chairs shall be protected against rusting where required for ADDL - ADDITIONAL LLV - LONG LEG VERTICAL
for galvanizing of steel connections. Use galvanized Simpson Strong-Tie connectors or approved equal
appearance. Do not wet dowel reinforcement unless approved by the Engineer. where required unless noted otherwise. ALT - ALTERNATE L.L. - LIVE LOAD
12. Where footing elevations vary, follow requirements of typical details shown on drawing. Contractor
B.L.L. - BOTTOM LOWER LAYER LONGIT. - LONGITUDINAL
shall establish footing elevations based on all requirements including maximum slopes, and Electrical, 4. Site bending of bars is not permitted without prior approval of Engineer.
8. For all glulams on the exterior of the building, provide a 13mm (1/2") thick end cap of similar B.U.L. - BOTTOM UPPER LAYER LSL - LAMINATED STRAND LUMBER
Mechanical and Architectural information.
material glued to the end face. Apply 3 coats of sealant to all sides and end caps of glulams when BCE - BOTTOM CHORD EXTENSION LVL - LAMINATED VENEER LUMBER
5. Provide epoxy coated rebars where noted on plan in accordance with CAN/CSA S413 (Parking Structures).
13. Footing elevations, if shown, are for bidding purposes only, are not final, and may vary according to exposed to rain/moisture. BOT - BOTTOM L.V. - LENGTH VARIES
Chair bars with plastic chairs and tie with plastic coated wire.
site conditions. All footings must be taken to a bearing layer approved by the Geotechnical Engineer. B/U - BUILT UP Mf - FACTORED MOMENT
6. Minimum reinforcement shall be as follows unless otherwise noted: 9. Use Napier Bio-Wash for wood coatings, u.n.o. Follow manufacturer's recommendations for application. Cf - FACTORED COMPRESSION FORCE N. STUDS - NELSON STUDS
14. Bearing surfaces must be protected from freezing before and after footings are poured. Any proposed alternate is subject to Engineer's and Architect's prior approval. CANTLV - CANTILEVERED OPP - OPPOSITE
a) Wall reinforcement: CLR - CLEAR O.F. - OUTSIDE FACE
150mm (6") wall - 10M @ 300 (12") VERT., 10M @ 300 (12") HOR., CENTERED CONC. - CONCRETE P.C. - PRECAST CONCRETE
PREFABRICATED WOOD I-JOISTS CONT - CONTINUOUS PSL - PARALLEL STRAND LUMBER
200mm (8") wall - 15M @ 450 (18") VERT., 15M @ 450 (18") HOR., CENTERED C'SINK - COUNTERSINK P/T - POST-TENSION
1. Prefabricated wood I-Joists shall be designed by a Professional Engineer registered in the Province of
2-15M verts full height at ends of all walls unless noted otherwise C.I.P. - CAST IN PLACE REINF. - REINFORCEMENT
British Columbia. Design of joists shall conform to CSA 086 to carry out the design loads and not to
C/W - COMPLETE WITH RS - ROUGH SAWN LUMBER
b) Slab reinforcing (or temperature reinforcing) exceed the deflection limits as specified on the drawings.
CJ - CONTROL JOINT R/W - REINFORCED WITH
100mm (4") 10M @ 500 (20") o.c. EACH WAY 2. Joists shall be manufactured with solid wood webs and structural wood chords in a plant approved by CLT - CROSS LAMINATED TIMBER S.D.L. - SUPERIMPOSED DEAD LOAD
125mm (5") 10M @ 400 (16") o.c. EACH WAY D.L. - DEAD LOAD S.O.G. - SLAB ON GRADE
ICBO or Standards Council of Canada under the supervision of an approved third party inspection
150mm (6") or less 10M @ 300 (12") o.c. EACH WAY DIAG. - DIAGONAL S.S. - STAINLESS STEEL
agency.
Concrete topping (ie: over plywood) 152x152 MW 9.1 x MW 9.1 welded wire mesh EL - ELEVATION STAG - STAGGERED
c) Footing reinforcement:
3. Manufacturer is responsible for design and supply of all bridging, blocking, web stiffeners, accessories E.F. - EACH FACE STD - STANDARD Mar. 25, 2014 Issued for Construction
and metal connection hardwares required for the stability of the joist assembly. Hot dip galvanize all E.S. - EACH SIDE STIFF - STIFFENER
2-15M continuous plus hooked dowels of same size and spacing as wall vertical reinforcing. steel connectors including fasteners, where exposure to rain during or after construction may cause E.W. - EACH WAY STIRR - STIRRUP Mar. 24, 2014 Issued for Value Engineering
d) Other locations not identified above: 15M @ 400 (16") rusting/staining of wood exposed to view. EXIST. - EXISTING Tf - FACTORED TENSILE FORCE
FDN - FOUNDATION TJI - TRUSS JOIST For Building and Landscape Tender
4. Submit 4 sets of shop drawings indicating design loads, joist type and all connection and bracing Nov. 19, 2013 + Building Permit
7. All bars shall be continuous, properly lapped at splices. At corners and intersections; horizontal FTG - FOOTING T.L.L. - TOP LOWER LAYER
reinforcement shall be bent and lapped. details to the Engineer prior to fabrication of trusses. Shop drawings shall be sealed by a Professional
GA. - GAUGE TRANSV. - TRANSVERSE
Engineer registered in B.C. Do not proceed with fabrication until the drawings have been approved by
GALV - GALVANIZED T.U.L. - TOP UPPER LAYER
Aug. 15, 2013 For Owner Review (99%)
8. Unless noted otherwise, lap lengths, including dowels, for 400 MPa (58 ksi) reinforcement shall be the Engineer.
as follows: GL - GLULAM T&B - TOP AND BOTTOM July 31, 2013 Issued for Coordination (95%)
Epoxy coated bars 5. Each of the joists shall be identified by a stamp indicating the joist type, NER report number, CCMC H1E - HOOK ONE END TYP - TYPICAL
10M - 400mm (16") 10M - 500mm (20") number, manufacturer's name, plant number and name of third party quality control agency. H2E - HOOK TWO ENDS U.D.L. - UNIFORMLY DISTRIBUTED LOAD July 09, 2013 Issued for Coordination (33%)
15M - 600mm (24") 15M - 750mm (30") HD - HOLD DOWN U.N.O. - UNLESS NOTED OTHERWISE
20M - 750mm (30") 20M - 980mm (39") 6. Joists shall be handled, stored and erected in accordance with the manufacturer's erection drawings. H.D. GALV. - HOT DIPPED GALVANIZED U/S - UNDER SIDE
DATE ISSUE
25M - 1170mm (46") 25M - 1530mm (60") All joists should be plumb and the chords held in a straight line. HDR - HEADER Vf - FACTORED SHEAR FORCE
30M - 1400mm (55") 30M - 1840mm (72") HORIZ - HORIZONTAL VERT - VERTICAL
7. Contractor is responsible for temporary stability of the joists during erection. I.F. - INSIDE FACE
a) Lap splices not shown on drawings shall not be allowed unless approved in writing by the Engineer.
8. Follow manufacturer's guideline regarding openings in web. Drilling or cutting chords are not permitted.
9. Unless noted otherwise, openings in walls and slabs shall have 2-15M extra each side extending 600mm
ESC
(2'-0") past corners, plus 2-15M x 1200mm (4'-0") diagonal each corner. 9. Following fabrication and erection of the joists, the manufacturers shall retain a Professional Engineer
registered in B.C. to review installation of the joists and submit a sealed letter stating that installation
10. Welding of reinforcing to embedded plates is permitted only with weldable deformed bar anchors with of the same has met all structural requirements.
the following fillet weld sizes:
10M (3/8")Ø - 6mm (1/4")
15M (5/8")Ø - 10mm (3/8")
20M (3/4")Ø - 12mm (1/2")
DRAWING LIST UBC ENGINEERING
11. Provide contingency reinforcing additional to all other requirements, with "add" and "delete" unit prices
included in bid. Include reinforcing required for non-structural concrete and masonry shown on the No. DWG. No. DWG. TITLE STUDENT CENTRE
various drawings.
1 S100 GENERAL NOTES
12. Reinforcing not indicated on the structural drawings needed for mechanical/electrical support (i.e. radiant
piping, conduit, etc) is the responsibility of the contractor.
2 S200 FOUNDATION / MAIN FLOOR PLAN
S100
8 S303 SECTIONS AND DETAILS
C1
1 2 3 4 5 6 7 8 9 10 11 12 13 HOLD DOWN TYPE AS PER
HD
SCHEDULE AND PLAN
3170 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 525
NOTES:
This drawing is the property of Urban Arts Architecture and may not be
reproduced without their permission and unless the reproduction carries
their name. All designs and all other information shown on this drawing
are for use on the specified project only and shall not be used otherwise
UD
UD
without written permission of this office.
ST
ST
U
U
B/
B/
EDGE OF CONC. SLAB The Contractor shall check and verify all dimensions and report any
1
Y
Y
HD
HD
HD
HD
HD
HD
discrepancies before proceeding.
PL
PL
F1
1
HD
3-
3-
A A Do not scale drawings.
CONSULTANT:
Fast +Epp
DOWN TO ALLOW
FOOTING STEPS
FOR PLUMBING
SLAB DEPRESSION
STEP DOWN
IN SHOWER PER structural engineers
ARCH.
Suite 201
2915
SEE PLAN
F1
F1 JAF
B B NdR
1
HD
STEP DOWN STEP DOWN SLAB DEPRESSION IN
Aug. 2013
SHOWER PER ARCH.
1806
1
HD
FOOTING STEPS
DOWN TO ALLOW
FOR PLUMBING
1
HD
F1 F1
F1 F1
1
HD
5195
STEP DOWN
1
HD
3
3
HD
HD
F1
C1
C1
C1
C1
C1
C1
C1
C1
F1
C C
F3 F3 F3 F3 F3 F3 F3 F3
7
S302
4
HD
C1
C1
C1
4
2
HD
HD
HD
HD
PL
3-
D D
F1 F1 F1
F3 F3
1570
F4
E E
C1
C1
C1
C1
C1
C1
C1
C1
C1
F3 F3 F3 F3 F3
2
G F3 F3
F4
F3
F4 ESC
D4
D4
H
7
1500
FOUNDATION PLAN
S200
COLUMN SCHEDULE CONCRETE WALL SCHEDULE BEAM SCHEDULE WOOD WALL SCHEDULE WOOD SHEARWALL SCHEDULE HOLD DOWN SCHEDULE LEGEND
MARK SIZE COMMENTS MARK THICKNESS (MIN.) REINFORCEMENT MARK SIZE AND TYPE MARK CONSTRUCTION MARK CONSTRUCTION MARK TYPE COMMENTS CONCRETE WALL TYPE AS PER
15M @400 EACH WAY, B1 38x89 SPF #2 STUDS @ 400 WITH 13mm D.FIR PLYWOOD CW WALL SCHEDULE AND PLAN
C1 GLULAM 175x190 CW1 200 LSL 89 x 241 (U.N.O.) 38x140 SPF NO 1 / 2 STUDS @ 400 HD1 LTT131
(CENTRE IN WALL) (HEADER) W1 SHEATHING ON ONE SIDE. PLYWOOD FASTENED WITH
SW1 75mm LG. x 3.05mmØ NAILS @150 AT SHEET EDGES AND WALL BELOW
C2 GLULAM 130x190 B2 GL 175 x 266 @250 O.C AT INTERMEDIATE STUDS. HD2 HTT4 18 - 16d NAILS
W2 38x184 SPF NO 1 / 2 STUDS @ 400
38x89 SPF #2 STUDS @ 400 WITH 13mm D.FIR PLYWOOD LOAD BEARING WOOD STUD WALL
B3 GL 130 x 266 OR GL 175 x 288 SHEATHING ON ONE SIDE. PLYWOOD FASTENED WITH W AS PER SCHEDULE
HD3
JOIST SCHEDULE SW2 75mm LG. x 3.33mmØ NAILS @100 AT SHEET EDGES AND
HTT5 26 - 16d NAILS
C1
1 2 3 4 5 6 7 8 9 10 11 12 13 HOLD DOWN TYPE AS PER
HD
SCHEDULE AND PLAN
3170 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 525
NOTES:
This drawing is the property of Urban Arts Architecture and may not be
NOTE:
reproduced without their permission and unless the reproduction carries
SEE STRUCTURAL ADDENDUM 01
their name. All designs and all other information shown on this drawing
FOR ADDITIONAL NOTES ON BRICK
are for use on the specified project only and shall not be used otherwise
ANGLE AND LEDGER INSTRUCTIONS
WET WALL IN W/C without written permission of this office.
STEP IN
FOUNDATION The Contractor shall check and verify all dimensions and report any
BELOW discrepancies before proceeding.
B1 (U.N.O.)
A A Do not scale drawings.
CONSULTANT:
10
W1
12
/
CW1
85
S4
1.
Fast +Epp
HU
US
H
G ON
G ON
ER
AN S
FLUSH 89x302 LSL H IMP
SW1
ER
AN S
structural engineers
H IMP
Suite 201
2915
CW1
CONC. STAIRS AND CANTILEVER 1672 West 1st Ave T 604 731 7412
LANDING ABOVE CONC. STAIRS Vancouver BC F 604 731 7620
CONC. PAVERS ON
RIGID INSULATION PER ARCH. ON Canada V6J 1G1 mail@fastepp.com
13mm PLYWOOD
SEE ARCH. DWGS. FOR BUILD-UP 900 WIDE x 400
DEEP MECH. SEE PLAN
W1 CW1
Aug. 2013
WET WALL IN W/C
STEP IN
DOUBLE END STUDS 1806
W1
W1 B1 (U.N.O.)
CW1
SW4
5195
2
HD
HD
DROP 127x302 LSL 1.55E TYPICAL BEAM POCKET IN CONC.
PLANTER ABOVE BELOW SHEAR WALL
3 4
BLOCK ABOVE BTWN JOISTS
S302 SIMPSON S302
CMST12 DOUBLE END STUDS
STRAP TYP. AT CONNECTION TO
6.2kPa
CONCRETE WALL
3
3
HD
HD
SW2 SW2 B6 B6 B6 B6 B6
C C
CW1 CW1
38x140 WALL
5
S302
SIMPSON CMST12
HD
5
HD
BOTH SIDES. PROVIDE BUILT-UP POST INSTALLED PRIOR TO PANEL INSTALLATION, ADEQUATE
AT RAIL LOCATIONS TYP. MEASURES MUST BE TAKEN AND PLAN REVIEWED BY
J2
2
S302
5
HD
5
HD
HD
C250x30 STRINGER
89x302 LSL 1.55E TRUSS A GL (24f - EX) BOTTOM CHORD
D B1 B5
D
FILL GAP ON TOP OF GLULAM SIMPSON CMST12 STRAP STEEL RAILING ABOVE DESIGNED BY
BETWEEN PANELS WITH STIFF EPOXY NEXT TO TRUSS GRID 1 TO 12 FABRICATOR, RECESSED IN PANEL B B
1570
3
HD
A
1
NOTCHED LOCALLY AT
HD
3
HD
E E
D1
H
J2
For Building and Landscape Tender
Nov. 19, 2013 + Building Permit
4030
3
UNDERSIDE OF SOLID
HD
3
S201
COLUMN SCHEDULE CONCRETE WALL SCHEDULE BEAM SCHEDULE WOOD WALL SCHEDULE WOOD SHEARWALL SCHEDULE HOLD DOWN SCHEDULE LEGEND
MARK SIZE COMMENTS MARK THICKNESS (MIN.) REINFORCEMENT MARK SIZE AND TYPE MARK CONSTRUCTION MARK CONSTRUCTION MARK TYPE COMMENTS CONCRETE WALL TYPE AS PER
PLY WALL SCHEDULE AND PLAN
15M @400 EACH WAY, B1 38x89 SPF #2 STUDS @ 400 WITH 13mm D.FIR PLYWOOD CW
C1 GLULAM 175x190 CW1 200 LSL 89 x 241 (U.N.O.) 38x140 SPF NO 1 / 2 STUDS @ 400 HD1 LTT131
(CENTRE IN WALL) (HEADER) W1 SHEATHING ON ONE SIDE. PLYWOOD FASTENED WITH
SW1 75mm LG. x 3.05mmØ NAILS @150 AT SHEET EDGES AND WALL BELOW
STAG.
C2 B2 GL 175 x 266 @250 O.C AT INTERMEDIATE STUDS. HD2
140
GLULAM 130x190 HTT4
50
W2 38x184 SPF NO 1 / 2 STUDS @ 400 18 - 16d NAILS
38x89 SPF #2 STUDS @ 400 WITH 13mm D.FIR PLYWOOD LOAD BEARING WOOD STUD WALL
B3 GL 130 x 266 OR GL 175 x 288 SHEATHING ON ONE SIDE. PLYWOOD FASTENED WITH W AS PER SCHEDULE
HD3
300 JOIST SCHEDULE SW2 75mm LG. x 3.33mmØ NAILS @100 AT SHEET EDGES AND
HTT5 26 - 16d NAILS
C1
1 2 3 4 5 6 7 8 9 10 11 12 13 HOLD DOWN TYPE AS PER
HD
SCHEDULE AND PLAN
3170 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 525
NOTES:
This drawing is the property of Urban Arts Architecture and may not be
reproduced without their permission and unless the reproduction carries
their name. All designs and all other information shown on this drawing
are for use on the specified project only and shall not be used otherwise
4 without written permission of this office.
PROP UP CORNER 13mm PRIOR TO PROP UP CORNER 13mm PRIOR TO
INSTALLATION OF STRAPS & STRUCTURAL S303 INSTALLATION OF STRAPS & STRUCTURAL The Contractor shall check and verify all dimensions and report any
PARAPET PARAPET discrepancies before proceeding.
STRUCTURAL PARAPET
A A Do not scale drawings.
CONSULTANT:
ZONE 1 WHERE SOLID WOOD ZONE 1
PANEL IS PARALLEL TO Fast +Epp
OVERHANG GLUE JOISTS
OR 1m SECTION ABOVE GREEN ROOF DO NOT structural engineers
WALL TO PREVENT AIR EXTEND EAST OF CENTRE
GAPS, TYP. OF OVERHANG Suite 201
2915
STRUCTURAL PARAPET
Vancouver BC F 604 731 7620
PLYWOOD PANEL
Canada V6J 1G1 mail@fastepp.com
LAYOUT
SEE PLAN
B B
PLYWOOD PANEL
NdR
STRUCTURAL PARAPET
LAYOUT
Aug. 2013
1806
75mm LG. x 6mmØ SDS
SCREWS @ 100 ALONG
EQUAL
BACK EDGE OF
PLYWOOD. TYP. @ ZONE 1
J1
1500 1500
CMST 12 STRAP
5195
1 9 3 12
SIMILAR 100x3mm THICK CONT.
S303 S303 S303 DIFFERENT CANTILV. ROOF PANELS INTENDED TO BE PRE-FABRICATED. S303 STEEL STRAP
PROP UP CORNER LENGTH SUPPLIER TO SUBMIT PANEL LAYOUT DRAWING FOR
25mm PRIOR TO EQUAL EQUAL REVIEW PRIOR TO FABRICATION TYP.
SW3
INSTALLATION OF
STRAPS & STRUCTURAL STRUCTURAL PARAPET
EQUAL
PARAPET
8
CMST 12 STRAP
CMST 12 STRAP
CMST 12 STRAP
CMST 12 STRAP
S303
900 MAX.
8
PLYWOOD PANEL SIMILAR
S303
LAYOUT SIMPSON CMST12 STRAP
ABOVE BEAM LINE
C B2 B2 B2 B2 B2 B2 B2 B2 B4
C
175x342 D.FIR GL.
3000
75mm LG. x 6mmØ SDS SCREWS
@ 100 ALONG BACK EDGE OF
J1 PLYWOOD. TYP. @ ZONE 1
NO GREEN ROOF 7 6 8
ABOVE ENTRY S303 S303 S303
CANTILEVER
175x342 D.FIR GL.
5925
SW4
10
J1
S303
PREFAB PANEL NOTES:
5 9 DIAGONAL REMOVED
SIMILAR FROM TRUSS AT HALLWAY
S303 S303
J1
ZONE 1 HANG FROM GLULAM
PLYWOOD PANEL
TOP CHORD
EQUAL
LAYOUT
E E
CMST 12 STRAP
ROOF ACCESS FINAL LAYOUT FOR SPRINKLER Mar. 24, 2014 Issued for Value Engineering
HOLE TO BE SITE TYP. 13mm PLYWOOD PIPE HOLES TO BE REVEALED
J1
CUT AND FRAMED STAGGER U.N.O. AT ROOF EDGE AND APPROVED BY For Building and Landscape Tender
2 STRUCTURAL ENGINEER PRIOR Nov. 19, 2013 + Building Permit
4030
SW2
July 31, 2013 Issued for Coordination (95%)
E'
EQUAL
C2
C2
C2
C2
C2
C2
C2
C2
C2
B2 B2 B2 B2 B2 B2 B2 B2 B2
F F
400
ESC
NOTE:
CMST 12 STRAP C2 COLUMNS FROM SECOND FLOOR
G SW3 TO ROOF
5
S303
SIMILAR PLYWOOD. TYP. @ ZONE 1 UBC ENGINEERING
STRUCTURAL PARAPET
STUDENT CENTRE
H H
PLYWOOD PANEL
PROP UP CORNER 13mm PRIOR TO 8 1
LAYOUT TYP. STRUCTURAL PARAPET
INSTALLATION OF STRAPS & STRUCTURAL S303 S303
PARAPET
1665 1335 365
S202
1-15M TOP & BOT. 1-15M TOP CONT.
STEP
MAX.
600
`D'
TYP. AT SLAB EDGE
1-15M1200 EACH CORNER OF
FOR FOOTING REINF 600
CONC. UPSTAND WHERE REQUIRED SEE WALL / SLAB OPENING
SEE SCHEDULE
C/W 2-15M @ TOP CONT. AND C10M 1050 @ 450 ARCH. 10M @ 300 HORIZ. TYP
DOWELS TO MATCH WALL VERTS.
`D'
1050 MAX.
R.
75
CL
SEE ARCH.
WATERPROOF MEMBRANE
AT EXTERIOR SLAB
`D'
APPROVED BEARING 50 300x300
TYP. MAX.
1 MAX. BEND REINF. WITH HICKEY OPENING
BAR AS PER CSA STANDARDS
2
25
CLR.
25
`D' = FOOTING DEPTH
10M @ 450
125
TYP
1-15M TYP TOP &
600
EQ. MIN.
BOT FOR SLABS
TYPE 1 EQ.
1-15M EACH FACE
TENSION
10 TYP. CURB AT SLAB EDGE TYP FOR WALLS
SEE PLANS
LAP
-
TYP.
FOR SLAB REINF. & DEPTH 1:20 401 - 134 Abbott Street
900
SEE PLAN
Vancouver, BC
STEP
MAX.
600
`D'
75
15 TYPICAL CONC. WALL AND SLAB OPENINGS SEAL:
R.
`D'
CL - 1:20
APPROVED BEARING
1 MAX.
2
5 TYP. TOP OF WALL SLAB & REINFORCING
AS PER PLAN
TENSION
- 1:20
PLYWOOD SHEATHING AS PER
`D' = FOOTING DEPTH LAP GENERAL NOTES
TENSION LAP
100 SLAB ON GRADE 100 SLAB ON GRADE
MAX.
WATERPROOF MEMBRANE AT
300
EXTERIOR SIDE NOTES:
150 150
MIN.
450
This drawing is the property of Urban Arts Architecture and may not be
75
75
PLAN
PLAN
SEE
SEE
reproduced without their permission and unless the reproduction carries
their name. All designs and all other information shown on this drawing
are for use on the specified project only and shall not be used otherwise
C10M DOWELS @450 without written permission of this office.
SLAB ON GRADE
300 2-15M CONT C15M @600 ALT. HOOK 2-15M CONT C15M @600 ALT. HOOK
- Fast +Epp
OUTSIDE FACE VERT. REINF.
"W"
-
WOOD FRAME WALL WOOD FRAME WALL
APPROVED BEARING TO MATCH WALL VERT REINF. 1 : 20 structural engineers
+ 1-15M HOR. TOP & BTM
1 : 20
1 Suite 201
2-15M CONT. TOP 1672 West 1st Ave T 604 731 7412
2
LINE OF UNDISTURBED MAX. SLOPE Vancouver BC F 604 731 7620
SOIL TO MATCH SLOPE LINE PER GEOTECH. Canada V6J 1G1 mail@fastepp.com
NOTE:
2. ASSUMED ALLOWABLE
"H"
BEARING =144kPa
FREE DRAINING BACKFILL
TENSION SPLICE
TENSION SPLICE
3. GEOTECH ENGINEER TO
EXTEND HOOK TO INSPECT BACKFILL AND
BACK FACE OF WALL CONFIRM ASSUMED
EXTEND HOOK TO
TYP. BEARING AND LOADING
BACK FACE OF WALL BAR (2) CONC. WALL CONC. WALL
TYP. SEE PLAN & SECTIONS SEE PLAN & SECTIONS
3mm WIDE x T/4 DEEP 4. fc'=25MPa @28 DAYS
fy=400MPa FOR REINF. FOR REINF.
SAWCUTS OR
(DO NOT BACKFILL UNTIL
"B"
ZIPSTRIP STEEL PLATE
(T = SLAB DEPTH) CONCRETE HAS REACHED
28 DAYS STRENGTH)
NOTES: HOOKED HOOKED
1) HORIZ. DOWELS TO MATCH SIZE 38Ø WEEP HOLES @1200 DOWELS TO DOWELS TO
MATCH WALL MATCH WALL
600 MIN.
600 MIN.
AND SPACING OF HORIZ. REINF. SUB-BASE SEE SOIL REPORT SUB-BASE SEE SOIL REPORT
VERT. REINF. VERT. REINF.
6mm ASPHALT 2) FOR TENSION SPLICE LENGTHS 38x89 KEY CONT. FOR 250 AND 200 WALLS
IMPREGNATED SEE TABLE IN GENERAL NOTES. "A" 38x138 KEY CONT. FOR 300 WALLS SLAB ON GRADE SLAB ON GRADE
FINISH GRADE FINISH GRADE
FIBREBOARD SEE PLAN FOR REINF. SEE PLAN FOR REINF.
1-15M CONT. BAR (5) WEEP HOLES PER MECH.
CLR.
MIN.
50
BAR (3)
200
MIN.
MIN.
38x89 CONT. KEY
150
150
150
15M ANCHOR BAR
MIN.
TENSION SPLICE TYP. ALL CORNERS
450
TENSION SPLICE
PLAN
SEE
TYP.
"T"
CLEAN FREE DRAINING
BACKFILL MATERIAL
CLR.
CLR.
TENSION SPLICE
75
75
DRAIN TILE SEE PLUMBING
TENSION SPLICE
CLR.
DRAIN TILE
75
STANDARD HOOK APPROVED BEARING
EXTEND TO BACK FACE BY GEOTECH. ENGINEERS FOR FOOTING TYPE SEE PLAN FOR FOOTING TYPE SEE PLAN
3 TYP. SLAB ON GRADE CONTROL JOINT OF WALL TYP "L" BOTTOM ELEV. TO BE REVIEWED
BY MECHANICAL ENGINEER &
BOTTOM ELEV. TO BE REVIEWED
BY SOIL ENGINEER ON SITE
- HORIZ. CORNER REINF. SOIL ENGINEER ON SITE
FOR WALL REINF. AND RETAINING WALL SCHEDULE
AT COLUMNS AT BACK FACE OF WALL
SIZE & SPACING TO THICKNESS SEE SCHEDULE
AND GENERAL NOTES
H W L T A B BAR (1) BAR (2) BAR (3) BAR (4) BAR (5)
MATCH WALL HORIZ. REINF.
<4200 300 2750 400 300 2800 C20M @250 C20M @125 C20M @125 15M @450 EA. WAY 15M @225 CONT. 18 EXTERIOR FTG. - CONCRETE WALL 19 INTERIOR FTG. - CONCRETE WALL
<3600 250 2250 350 300 2100 C20M @350 C20M @175 C20M @175 -- 15M @300 CONT. - 1 : 20 - 1 : 20
FOR WALL REINF. AND <3000 200 1800 300 200 1500 C20M @300 C20M @300 C15M @175 -- 15M @300 CONT.
THICKNESS SEE SCHEDULE
AND GENERAL NOTES <2400 200 1400 300 200 -- C15M @200 -- C15M @300 -- 15M @300 CONT.
<1800 200 1100 250 100 -- C15M @400 -- C15M @250 -- 3-15M CONT.
<1200 200 600 200 100 -- C15M @450 -- C10M @300 -- 2-15M CONT.
EDGE EACH SIDE
WITH 3mm RADIUS
SINGLE CURTAIN DOUBLE CURTAIN
600
TYP. RETAINING WALL SECTION
0.2 T
LAP 13
- 1:20
T
1:3 SLOPE
SECOND POUR AT WALL CORNERS UNO PER PLAN FASTEN
TO DOUBLE END STUDS
1:20 10M CLOSED TIES @ 250
ANCHOR BOLT AS PER TOP OF CONC.
GENERAL NOTES FOUNDATION
CONSTRUCTION JOINT
SLAB THICKNESS
SEE PLAN
VARIES
-
400 1-15M1200 DIAG. AT
EACH CORNER
CONCRETE FOUNDATION Aug. 15, 2013 For Owner Review (99%)
DATE ISSUE
8 TYP. LAP DETAIL AT STEPPED 50 1800
- TYP. MAX.
SLAB ON GRADE
PROTECTION
450 FROST
EXISTING
1:20
RUBBERIZED ASPHALT
DOOR OPENING
2-15M FULL HEIGHT
EACH SIDE OF
DOOR
ESC
UBC ENGINEERING
STUDENT CENTRE
SLAB THICKNESS
SEE PLAN
SLAB THICKNESS
1-15M CONT.
300 ANCHOR BAR
SEE PLAN
SEE PLAN
VARIES
ISOLATION JOINT
NOTES :
TYPICAL SECTIONS
1. CONSTRUCTION JOINTS TO BE INSERTED WHERE CONSTRUCTION
OPERATIONS ARE SUSPENDED FOR 30 MINUTES OR MORE. AND DETAILS
2. CONTROL JOINTS TO BE SAW-CUT WITHIN 4 TO 12 HOURS AFTER
CONCRETE HARDENS. SLAB REINFORCING SEE PLAN
2-38x TOP PLATES JOIST BEHIND TRIM JOIST 1-STUD EACH SIDE OF BEAM
NAIL WALL SHEATHING TO BLOCKING @1200
(WOOD I JOISTS SIMILAR) C/W 10 NAILS EACH SIDE
EACH STUD @600 401 - 134 Abbott Street
Vancouver, BC
HEADER AS PER PLAN
(MIN. 2-38x235) Canada V6B 2K4
2 TYPICAL BEAM PERPENDICULAR 3 TYP. EXTERIOR SHEAR WALL AT FLOOR 4 TYP. EXTERIOR SHEAR WALL AT FLOOR t: 604-683-5060
- - 1:20 - 1:20 e: info@urban-arts.ca
FRAMING ANCHORS AT
WINDOW/DOOR OPENINGS 1-38x UNDER HEADER BEAM TO STUD WALL CONNECTION PERPENDICULAR TO FRAMING PARALLEL TO FRAMING
JAF
NdR
Aug. 2013
1806
DOUBLE END STUDS
DOUBLE END STUD
3 31/4" NAILS @ 4" SIMPSON LTT20B HOLD DOWN 2 - SIMPSON ST2215 STRAPS
PLATE TO BLOCKING CENTERED ON STUD. C/W 38mmx406d(.406 Ø) NAILS
ONE ON EACH SIDE.
SIMPSON LSTI 73 STRAP 5/8"Øx8" LAG SCREW (NAIL ALL HOLES)
(73" LONG) C/W
48-1 1/2" x10d NAILS HOLD DOWN TIGHT
EQ.
HOLD DOWN STRAP TO SHEATHING.
AS PER ROOF
FRAMING DRAWINGS
EQ.
ENSURE NO KINK
OR SLACK IN STRAP.
HOLD DOWN STRAP
2ND FLR.
AS PER 2ND FLOOR
DRAG STRUT PER PLAN
FRAMING DRAWINGS SHIM TO MATCH WIDTH
OF WALL ABOVE. TRANSFER BEAM
600
TRANSFER BEAM ENSURE NO KINK OR
SLACK IN STRAP.
7 HOLD DOWN/STRAP LEGEND 8 TYP. END OF SHEARWALL 9 TYP. END OF SHEARWALL ON TRANSFER BEAMS
- N.T.S. (PLAN DETAIL) -
ON TRANSFER BEAM - 1:20 BEAM PARALLEL TO WALL
DATE ISSUE
ESC
UBC ENGINEERING
STUDENT CENTRE
TYPICAL SECTIONS
AND DETAILS
S301
G F F C C
PLY SHEATHING ON
STUD FRAMING PER PLAN PLY SHEATHING ON
FASTEN TO BOTTOM CHORD WITH STUD FRAMING PER PLAN
16Øx150 LONG LAG SCREWS @300 FACE OF PLY ON ADJOINING WALL
8Øx260 LONG ASSY VG SCREWS
@400 FLOOR ASSEMBLY FLOOR ASSEMBLY STEEL STRAP PER PLAN
PER SECTION 1/- PER SECTION 1/- ON TOP OF PLY SHEATHING & MAX. 100
SEE
EXTEND CONTINUOUS TO VERIFY WITH ENSURE TOP OF JOIST
ARCH.
UNDERSIDE OF INTERIOR PANEL ARCH. DWGS. IS TIGHT TO TOP OF BEAM U/S OF PLY SHEATHING
EL.- SEE ARCH. DWGS.
JOIST HANGER BY JOIST SUPPLIER
(INSTALL AFTER DSP INSTALLATION)
225
SIMPSON A35 CLIP @400 10mm THICK KNIFE PLATE C/W PLY SHEATHING ON
TYP. PIN DETAIL ROOF JOIST PER PLAN
PLY SHEATHING ON PLUNGE CUT SLOT IN COLUMN
ROOF JOIST PER PLAN
401 - 134 Abbott Street
GLULAM BEAM PER PLAN RECESSED DOOR TRACK
76 Vancouver, BC
30
BACK PLATE
CONC. TOPPING ON WHERE APPLICABLE STEEL STRAP PER PLAN
RIGID INSULATION PER ARCH. DWGS. ON CONNECTION SEE ARCH. DWGS. FOR DETAILS CONCEALED WITHIN CABLE TRAY AREA Canada V6B 2K4
300
185
125
200
PLY SHEATHING ON SAME AS SECTION 1/S310 t: 604-683-5060
PREFABRICATED SOLID EXCEPT BOLTS MAY BE USED 8mm THICK BENT PLATE HANGER
LAMINATED FLOOR PER PLAN WHERE NOT EXPOSED NOTCH NAIL LAMINATION TO ACCEPT 32mm THICK LSL RIM BOARD e: info@urban-arts.ca
30
C/W 6Øx100 LONG FLAT HEAD SCREWS @400
DEFLECTION TRACK 32mm THICK LSL BLOCKING
FOR GLAZING BY OTHERS @ EVERY JOIST SPACE SEAL:
GLAZING SYSTEM
BY OTHERS - NO VISIBLE SLOT PERMITTED
SEE SECONDARY COMPONENTS GLULAM TRUSS BOT. CHORD ON FRONT FACE OF COLUMN 30 70 25 SIMPSON DSP DOUBLE STUD PLATE CLIP
PER GENERAL NOTES GLULAM COLUMN PER PLAN @ EVERY JOIST TO BEAM CONNECTION.
GLULAM COLUMN BEYOND INSTALL BEFORE KNIFE PLATE
OR JOIST HANGER.
PLY SHEAR WALL ON
STUD FRAMING PER PLAN BEAM PER PLAN
Fast +Epp
structural engineers
Suite 201
1672 West 1st Ave T 604 731 7412
C Vancouver BC
Canada V6J 1G1
F 604 731 7620
mail@fastepp.com
TOP OF GLULAM TRUSS
BOT. CHORD BEYOND
6A SEE PLAN
STEEL STRAP PER PLAN -
JAF
SHEAR WALL TOP PLATE 25 75 60 25
NdR
EXTEND OVER CONC. WALL C/W
1-19Ø A-BOLT FLOOR ASSEMBLY 8mm THICK FACE & TOP PLATE C/W NOTE: Aug. 2013
PER SECTION 1/- 2-8Øx200 LONG VSSY VG SCREWS
INTO FACE PLATE &
25 WHERE FULLY THREADED SCREWS ARE USED
1806
4-6Øx100 LONG ASSY VG SCREWS U/S OF PLY SHEATHING IN CONJUNCTION WITH STEEL PLATES, COUNTERSINK
INTO TOP PLATE EL.- SEE ARCH. DWGS.
STEEL PLATE TO RECEIVE TAPERED SCREW HEAD TYPICAL.
0 PROVIDE SAMPLE OF SCREW & PLATE TO FAST + EPP
92
FOR APPROVAL PRIOR TO MASS PRODUCTION.
STEEL CHANNEL STRINGER PER PLAN
SEE ARCH. DWGS. FOR GEOMETRY &
DETAILS AS REQ'D.
10 LAMINATIONS
FLOOR ASSEMBLY
EMBED
NAIL AS ZONE 1
200
5 SECTION
S201 1 : 10
190
100 10 11 12
CONTROL JOINTS
PER ARCH. LAYOUT
3-15M3600@50
16x145 BOTTOM PLATE
160
DAP INTO GLULAM END C/W A
2-15M WELDABLE REBAR DOWELS PLY SHEAR WALL BEYOND
200
150
EL.- SEE ARCH. DWGS.
2-15M1500 75 CONC. TOP W/ Mar. 25, 2014 Issued for Construction
C10M1500@400 ALL SIDES
OF MECH. 100 INSULATION P Mar. 24, 2014 Issued for Value Engineering
TYP. AT PERIMETER OPENING 100 SLAB ON GRA
5-15M3600@50
For Building and Landscape Tender
Nov. 19, 2013 + Building Permit
250x250x13mm THICK BASE PLATE C/W WATERPROOF
TYP. BOTH ENDS
B
EMBED
8 4-16Ø A-BOLTS @150 EACH WAY ON ELEVATOR PIT WITH KIM Aug. 15, 2013 For Owner Review (99%)
200
TO SUIT ELEVATOR
DATE ISSUE
REQUIREMENTS
10M@200 TIES C15M DOWELS TO MATCH
EXTRA AS SHOWN VERT. REINF. TYP.
760
CONC. FTG. PER PLAN 38x89 CONT. KEYWAY &
50 MIN. TOPPING HOOK TOP BARS AT BACKSIDE OF WALL CONT. WATERSTOP
200OR
AROUND 15M HOR. CONT. WITHIN WALL PER ARCH. DWGS.
ESC
2-C15M AT TOP IN EACH TREAD
TO SUIT
U.N.O.
300
5-15M BOT. LONG WAY &
15M@400 BOT. SHORT WAY
UBC ENGINEERING
75
STUDENT CENTRE
TURN DOWN REINF. AT BASE & EXTEND APPROVED BEARING SURFACE CONC. FTG. R/W
75 CL.
300 WIDE SUPPORT WALL BELOW FROST TO GEOTECHNICAL ENGINEER'S 15M@300 EACH WAY
TYP.
APPROVED BEARING SURFACE DEPTH (CAST MONOLITHIC WITH STAIRS) SPEC. TOP & BOT., TYP. U.N.O.
TO GEOTECHNICAL ENGINEER'S SPEC.
S302
TYP. STRUCTURAL PARAPET: (SEE NOTE 1 BELOW)
NOTE:
13mm PLY SHEATHING BOTH SIDES ON
EXTENT OF GREEN ROOF
38x140 STUD @400 WHERE FULLY THREADED SCREWS ARE USED
GLUE PLY TO PLATES & FASTEN WITH TYP. STRUCTURAL PARAPET GREEN ROOF ASSEMBLY IN CONJUNCTION WITH STEEL PLATES, COUNTERSINK
3.05Øx50 LONG NAILS @100 COIL STRAP PER PLAN PER SECTION 1/- PER ARCH. DWGS.
1A 150
TO ALL PLATES STEEL PLATE TO RECEIVE TAPERED SCREW HEAD TYPICAL.
TOP SLUNG
GREEN ROOF ASSEMBLY -
BRACKET
TOP PLATES TO BE CONT. OR GLULAM BEAM SHOWN HIDDEN ASSY SCREWS PROVIDE SAMPLE OF SCREW & PLATE TO FAST + EPP
PER ARCH. DWGS. PROPERLY SPLICED FOR CLARITY PER SECTION 1/-
FOR APPROVAL PRIOR TO MASS PRODUCTION.
GLUE BOTTOM PLATE TO ZONE 1 FASTENING OF 38x PANEL
ROOF DECK & FASTEN WITH
SIMPSON 6Øx114 LONG SDS SCREWS
COIL STRAP PER PLAN @200 STAG. COIL STRAP PER PLAN
EXTEND UNDER PARAPET U/S OF PLY SHEATHING
2 ROWS OF EL.- SEE ARCH. DWGS.
3.05Øx50 LONG NAILS @100
80
PLY SHEATHING ON FASTEN
FAS PANEL WITH PLY SHEATHING ON 401 - 134 Abbott Street
PREFABRICATED SOLID 8Øx240 LONG ASSY VG SCREWS PREFABRICATED SOLID Vancouver, BC
106
LAMINATED ROOF PER PLAN 900 @400 900 SOLID LAMINATED ROOF
MAX. MAX. PER PLAN Canada V6B 2K4
30
t: 604-683-5060
80
GLULAM BEAM PER PLAN e: info@urban-arts.ca
EACH SIDE PLY SHEAR WALL ON
20 20 100 100 30 STUD FRAMING PER PLAN
TOP SLUNG BRACKET WITH SEAL:
13mm THICK TOP PLATE
13mm THICK BACK PLATES &
10mm THICK KNIFE PLATE C/W
4-SIMPSON SDW22338 SCREWS & STRUCTURAL ENGINEER
4-C/SUNK PINS PER TYP. DETAIL TO REVIEW AND APPROVE
FINAL SPRINKLER PIPE
PLUNGE CUT KNIFE PLATE HOLES PRIOR TO DRILLING
NO VISIBLE SLOT PERMITTED BELOW TYP.
STRUCTURAL PARAPET)
JACK UP EDGE OF OF
(CAMBER PRIOR TO
INSTALLATION OF
ROOF TO +13mm
190 175
GLULAM GLULAM
NOTE 1:
1 SECTION 1A SECTION 2 SECTION NOTES:
S202 1 : 10 - 1 : 10 S202 1 : 10
This drawing is the property of Urban Arts Architecture and may not be
reproduced without their permission and unless the reproduction carries
their name. All designs and all other information shown on this drawing
are for use on the specified project only and shall not be used otherwise
without written permission of this office.
The Contractor shall check and verify all dimensions and report any
discrepancies before proceeding.
EXTENT OF GREEN ROOF EXTENT OF GREEN ROOF
Do not scale drawings.
CONSULTANT:
1500
Suite 201
1672 West 1st Ave T 604 731 7412
U/S OF PLY SHEATHING Vancouver BC F 604 731 7620
EL.- SEE ARCH. DWGS.
Canada V6J 1G1 mail@fastepp.com
SEE PLAN
JAF
NdR
NOTE:
SEE SECTION 1/- FOR
Aug. 2013
EMBED
INFORMATION NOT SHOWN 6Øx240 LONG ASSY VG 2-38x184 PLATES ON
200
C/SUNK SCREWS @400 SILL GASKET C/W
SEE MECHANICAL FOR 1806
STAGGER EACH DIRECTION 16Ø C.I.P. A-BOLTS @400
SPRINKLER HOLES. AS SHOWN
LAYOUT TO BE REVIEWED 2-15M CONT.
PRIOR TO DRILLING DEFLECTION TRACK AT TOP OF WALL TYP.
FOR GLAZING (BY OTHERS):
GLAZING SYSTEM
PER ARCH. DWGS.
3 SECTION 4 SECTION
S202 1 : 10 S202 1 : 10
25
U/S OF PLY SHEATHING
EL.- SEE ARCH. DWGS.
40
PLY SHEATHING ON
PREFABRICATED SOLID
LAMINATED ROOF PER PLAN
13
FASTEN BOTH LAYERS 8mm THICK CONT. PLATE HANGER C/W LLV102x76x6.4 CONT. C/W
25 25
OF PLY SHEATHING TO TOP PLATE FASTEN TOP PLATE SIMPSON SDW22300 SCREWS @300 SIMPSON 6Øx114 LONG SDS SCREWS
PER SHEAR WALL EDGE NAILIING PER SECTION 5/- SITE APPLY TWO STRIPS OF SPACING TOP & BOT. SITE APPLY TWO STRIPS OF @150 STAG. INTO VERT. LEG &
38x KILN DRIED MATERIAL DAP INTO SOLID LAMINATED PANEL 38x KILN DRIED MATERIAL SIMPSON SDW22300 SCREWS @300
FASTEN BOT. PLATE TO PLY SHEATHING (13mm THICKNESS) 76 (13mm THICKNESS) INTO HOR. LEG
ROOF PANEL WITH TO EXTEND TO TOP OF TO CONCEAL HANGER TO CONCEAL HANGER
SIMPSON 6Øx114 LONG SDS SCREWS STRUCTURAL ROOF WITH VISUAL EDGE OF PANEL
@200 STAG. PLY SHEAR WALL ON NO SPLICES
STUD FRAMING PER PLAN
BELOW
7 SECTION 8 SECTION
S202 1 : 10 S202 1 : 10
5 SECTION 6 SECTION
S202 1 : 10 S202 1 : 10
DATE ISSUE
PLY SHEAR WALL ON
EXTENT OF GREEN ROOF
STUD FRAMING PER PLAN
4-6Øx300 LONG ASSY VG SCREWS 4-6Øx300 LONG ASSY VG SCREWS 600 CONT. 100
(WITH 100 PITCH) PLY SHEATHING ON (WITH 100 PITCH) SITE APPLIED PLY STRIP STRAP
ESC
PLY SHEATHING ON PREFABRICATED SOLID PLY SHEATHING ON PLY SHEATHING ON SITE APPLIED PLY SHEATHING STRIP
PREFABRICATED SOLID ASSY SCREWS PER SECTION 1/- LAMINATED ROOF PER PLAN 75 PREFABRICATED SOLID PREFABRICATED SOLID PER SECTION 7/- 50
LAMINATED ROOF PER PLAN BEYOND LAMINATED ROOF PER PLAN LAMINATED ROOF PER PLAN GAUGE
TOP SLUNG BRACKET PER SECTION 1/- 135mm WIDE TOP SLUNG BRACKET WITH FASTEN PANEL WITH 6Øx240 LONG ASSY VG 3mm THICK H.D. GALV. CONT.
MODIFY AS NOTED 13mm THICK TOP PLATE 6Øx240 LONG ASSY VG SCREWS C/SUNK SCREWS @400 STEEL STRAP C/W
106
13mm THICK BACK PLATE C/W @600 STAG. 200 SIMPSON 6Øx203 LONG SDS SCREWS
EXTEND TOP PLATE & BACK PLATES 10mm THICK KNIFE PLATE C/W @150 STAG.
20
SECTIONS
30
FOR ADDITIONAL BACK PLATE 4-SIMPSON 6Øx76 LONG SDS SCREWS GLULAM TRUSS TOP CHORD (USE 114 LONG SCREWS
(WITH 75mm PITCH) PER PLAN GLULAM BEAM PER PLAN WHERE NO WALL BELOW)
9
S202
SECTION
1 : 10
190
GLULAM
10
S202
SECTION
1 : 10
11
S202
SECTION
1 : 10
12
S202
SECTION
1 : 10
S303
4 5 6 7 STRUCT. ENGINEER TO
8 9 10 NOTE:
H G F E D STRUCT. ENGINEER TO
C
REVIEW AND APPROVED
1 TRUSSES TO BE SHOP FABRICATED 5 REVIEW AND APPROVED
FINAL SPRINKLER HOLE
- AND SHIPPED TO SITE ASSEMBLED - FINAL SPRINKLER HOLE
FOR INSTALLATION.
LAYOUT PRIOR TO DRILLING LAYOUT PRIOR TO DRILLING
TOP CHORD OF TRUSS 'B' TOP OF GLULAM TRUSS
171
171
265x342 GLULAM TOP CHORD 265x342 GLULAM TOP CHORD EL.-SEE ARCH. DWGS.
*
GLULAM TRUSS STRESS GRADES:
*
*
TR
TR
TR
TOP CHORD D.FIR 24f-EX
US
TR
U
AM BOTTOM CHORD D.FIR 24f-EX
SS
SS
SB
US
UL
OVERALL DEPTH
OVERALL DEPTH
265x152 GLULAM
265x152 GLULAM
265x152 GLULAM
265x152 GLULAM
265x152 GLULAM
265x266 GLULAM
265x152 GLULAM
265x190 GLULAM
265x152 GLULAM
265x266 GLULAM
265x152 GLULAM
265x152 GLULAM
26
VERTICAL WEBS D.FIR 18t-E
B
TR
TR
M
26
L
:2
SC
:2
:2
LA
LA
LA
LA
5x
G
5x
U
6 DIAGONAL WEBS D.FIR 16c-E
22
65
65
SS
SS
LU
LU
LU
LU
26
65
22
5x AM
x
:2
G
8
UL
x2
26
26
C
C
3460
3118
3460
3118
G
6
G
8
8
2 L
65
:2
:2
LU
6
66
:
22
22
22
22
LU
G
G
B
65
65
8
LA
x2
5x
5x
5x
5x
LA
LU
LU
22
G
S
x
US
26
26
26
26
M
5x
28
22
22
M
LU
LA
LA
TR 6
8
:2
M
G
LA
G
401 - 134 Abbott Street
LU
C
LU
LU
M
SS
LA
LA
LA
RU HOLE LAYOUT FOR Vancouver, BC
M
M
T
THERMOSTAT WIPING TO
BOTTOM CHORD OF TRUSS 'B' BE REVIEWED PRIOR TO
Canada V6B 2K4
*
t: 604-683-5060
*
DRILLING
*
BOTTOM OF GLULAM TRUSS
EL.-SEE ARCH. DWGS. e: info@urban-arts.ca
265x342 GLULAM TOP CHORD 265x342 GLULAM TOP CHORD
171
171
SEAL:
INDICATES USE 15 PINS @ INDICATES USE 15 PINS @
CONNECTION W/ DIAGONAL CONNECTION W/ DIAGONAL
*
USE LAMSSTOCK ONLY FOR ALL
MEMBER SIM. TO DETAIL 4/- MEMBER SIM. TO DETAIL 4/- LAMS OF BOT. CHORD W/ TRUSS 'B'
2 3 4 6 7 8
- - - - - -
A TRUSS A ELEVATION B TRUSS B ELEVATION NOTE: TRUSS B SHOWN, TRUSS C SIMILAR EXCEPT AS NOTED
S203 1 : 50 S203 1 : 50
27Ø COUNTERBORE
EL.-SEE ARCH. DWGS. EL.-SEE ARCH. DWGS. NOTES:
This drawing is the property of Urban Arts Architecture and may not be
50
GLULAM MEMBERS PER TRUSS ELEVATIONS 8Øx25 LONG MACHINE BOLT WITH reproduced without their permission and unless the reproduction carries
TYPICAL COUNTERSUNK HEAD their name. All designs and all other information shown on this drawing
111
SECURED IN POSITION WITH are for use on the specified project only and shall not be used otherwise
LOCKTITE without written permission of this office.
111
PRE-TAP 30mm LONG HOLE The Contractor shall check and verify all dimensions and report any
FOR MACHINE BOLT discrepancies before proceeding.
COUNTERBORE 3mm DEEP
7
13
Fast +Epp
200
127
6 GAP
127
TYP.
25
SEE PLAN
50
70 JAF
70
25 70 25 NdR
25 Aug. 2013
1806
NOTE:
TYPICAL DIMENSIONS FOR KNIFE PLATES &
PIN ASSEMBLY (FOR 228 & 266 WIDE DIAGONALS)
AS SHOWN
NOTE: NOTE:
SECTION SIMILAR TO SECTION 1/- 6 PINS IN DIAGONAL SECTION SIMILAR TO SECTION 1/-
2A SEE SECTION 1/- FOR INFORMATION NOT SHOWN WEST OF GRID 'F' SEE SECTION 1/- FOR INFORMATION NOT SHOWN
- BOTH ENDS
50
12
7
12
7
12
7
2-LOCATOR KNIFE PLATES
WELDED TO COLUMN CAPITAL
NOTE:
30
BEAM KNIFE PLATES TO BARE
50 50 50
200
40
16mm THICK BEARING PLATE
30
127
SLOT PERMITTED)
25 70 25 140
AT HALLWAY
NOT EXTEND INTO BOT. CHORD 12-6Øx300 LONG FULLY THREADED
82 NOTCH
82 NOTCH
CONNECTION BETWEEN
OF TRUSS 'B' SELF-TAPPING WOOD SCREWS
TRUSSES BOT. CHORD CONT.
50 50 (COUNTERBORE HEADS & PLUG) 300
TYP. 10mm THICK SIDE PLATES
TRUSS 'A' 6
NOTCH REINFORCING ALIGN HOLES WITH TRUSS HOLES &
ESC
SEE SECTION 7/- FASTEN WITH 2-16Ø BOLTS
50
82
55
50
UBC ENGINEERING
75
111
STUDENT CENTRE
75
60
55
FROM TRUSS 'B' - 127 127 127 100 6-15M WELDABLE REBAR DOWELS
2-6mmØ x 150 SDS SCREWS
SITE FASTEN TO TRUSS 'A' GAUGE (WITH 125mm PITCH) 4 ROWS OF 10Øx300 LONG FULLY THREADED
SELF-TAPPING WOOD SCREWS
DOWELS
ELEVATIONS AND
DETAILS
3 SECTION 4 SECTION 4A SECTION 8 SECTION 7 SECTION
- 1 : 10 - 1 : 10 - 1 : 10 - 1 : 10 - 1 : 10 S400