Professional Documents
Culture Documents
1. For general notes refer to drawing nos. SD-NT, SD-01, SD-02. ----- sheet of -----
2. Read this drawing in conjunction with other relevant
9-1 9-2 9-3 9-4 9-5 9-6 9-7 9-8 Structural drawings.
3. Contractor is required to verify all dimensions with Architectural
9700 5550 1525 5250 7300 2350 6125 and M&E drawings prior to construction. BUILDING AND CONSTRUCTION AUTHORITY
APPROVED UNDER SECTION 5 / SECTION 5A OF THE
BUILDING CONTROL ACT (CHAPTER 29)
9825
(handed)
9-B
1550
Corbel B1 (175x600)
9W1 9W2
9-C
9WL1
8850
9-D
9-A
L
I ON A EN
S G
C2DK S
FE
IN
(handed)
P RO
EER
D1b CIVIL
BHS1a
9825
9-B
SUBMISSION
1550
(200)
1303, CLIFFORD CENTRE TEL: 65352011
2-LB1
PROJECT
8850
BLOCK B9
2ND AND TYPICAL STOREY FRAMING
PLAN
BLOCK B9 - 2ND STOREY FRAMING PLAN PROJECT NO DRAWING NO
1.5
SCALE 1: 150
0 1.5 3 4.5 6
m
7.5
SE1820 FP9-T
REVISION:
NOTES
UNLESS OTHERWISE SHOWN. SCALE DATE DRAFT. ENGR. DIR.
1. ALL FRAMING SIMILAR TO TYPICAL STOREY. AS SHOWN 05/24/19 TM PH TCH