Professional Documents
Culture Documents
Anchorage To Pedestal Design Based On ACI 318-19 & AISC 360-10/16
Anchorage To Pedestal Design Based On ACI 318-19 & AISC 360-10/16
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Anchorage to Pedestal Design Based on ACI 318-19 & AISC 360-10/16
( 3716.1 cm2) 6 8 -8 1
ANALYSIS
CHECK FLEXURAL & AXIAL COMPRESSION CAPACITY OF ANCHORED CONCRETE (ACI 318-19 21 & 22)
1200
1000
f Pn (k) 800
600
400
200
0
0 50 100 150 200 250 300 350
f Mn (ft-k)
(cont'd)
f Mn = 246 ft-kips @ Pu = 150 kips
> M u, c = '
2f C
0.85Min A2 , 2 , E c 57 f C' , E s 29000ksi
123 ft-kips to center of base plate
o
[Satisfactory] Ec A
1
f Pmax = 972 kips
2
fp =
s E s , for s y
4.42 ksi, the max possible concrete compression stress. fS
(ACI 318-19 22.8.3.2 & 21.2.1, or AISC Guide - 1) f y , for s y
N sa A se , N f uta = 29.54 kips > Nua = Max( Nua,1 , Nua,2 ) = 12.50 kips [Satisfactory]
CHECK GOVERNING ANCHOR SHEAR STRENGTH (ACI 318 17.5.1.2 & 17.2.3.5.3)
CHECK TENSION AND SHEAR INTERACTION OF GOVERNING ANCHORS : (ACI 318 17.6)
Since Nua,2 < 0.2 f and
Nn
Vua,2 < 0.2 f Vn the full tension design strength is permitted.
N ua ,2 V ua ,2
0.34 < 1.2 [Satisfactory]
Nn V n
(cont'd)
CHECK BASE PLATE THICKNESS (AISC Guide - 1, Eq. 3.3.14a)
f p <
1.73 in t= 1.75 in [Satisfactory]
t reqD 1.5m
Fy
CHECK SPLICE LENGTH OF TENSION ANCHOR WITH REBAR
Ls = 1.3 Ld = 19 db = 19 in, (ACI 318-19 25.5)
< hef - 2" = 26 in [Satisfactory]
3 d f
L d MAX , 12 in
t e s b y
14 db =
requird
14 in
provided K
40 f 'c c b tr (ACI 318-19 25.4.2.3)
db
where r required / r provided = 0.423 ( A s,reqd / A s,provd , if not apply input zero, ACI 318-19 25.4.10.1)
db = 1 in, anchor governing
fy = 65 ksi
yt = 1.0 (1.3 for horizontal bar over 12" concrete, ACI 318-19 25.4.2.4)
ye = 1.0 (1.2 for epoxy-coated, ACI 318-19 25.4.2.4)
ys = 1.0 (0.8 for # 6 or smaller, 1.0 for other)
l = 1.0 (0.75 for light weight, ACI 318-19 25.4.2.4)
cb = 2.3 , (ACI 318-19 25.4.2)
Ktr = (Atr fyt / 1500 s n) = 0 (ACI 318-19 25.4.2.3)
(cb + Ktr ) / db = 2.3 < 2.5 , (ACI 318-19 25.4.2.3)
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Concrete Column Design Based on ACI 318-05
Vu,y = 16 k
COLUMN VERT. REINF. 3 # 8 at x dir.
(Total 6 # 8)
2 # 8 at y dir.
SHEAR REINF. 10 legs,# 4 @ 2 in o.c., x dir. THE COLUMN DESIGN IS ADEQUATE.
10 legs,# 4 @ 2 in o.c., y dir.
ANALYSIS
2 0.85 f '
C '
o , E c 57 f C
, E s 29000ksi
1200 Ec
2
c c ,
0.85 f C 2 for 0 c o
'
1000 fC o o
'
0.85 f C , for c o
800
f Pn (k) s E s , for s y
fS
f , for s y
600 y
f Pn (kips) f Mn (ft-kips)
400
AT AXIAL LOAD ONLY 972 0
AT MAXIMUM LOAD 972 105
AT 0 % TENSION 748 204
200
AT 25 % TENSION 643 235
AT 50 % TENSION 553 254
0
0 50 100 150 200 250 300 350
AT e t = 0.002 399 274
AT BALANCED CONDITION 392 275
f Mn (ft-k) AT e t = 0.005 305 327
AT FLEXURE ONLY 0 168
CHECK FLEXURAL & AXIAL CAPACITY
Mu = ( Mu,x2 + Mu,y2 )0.5 = 123.125 ft-k, (combined bending load.) q = 0.00 o
, (the direction of combined load.)
f Pmax =0.80 f [ 0.85 fc' (Ag - Ast) + fy Ast] = 972.09 kips., (at max axial load, ACI 318-05, Sec. 10.3.6.2)
where f = 0.65 (ACI 318-05, Sec.9.3.2.2) > Pu [Satisfactory]
Ag = 400 in2. Ast = 4.74 in2.
a = Cbb1 = 9 in (at balanced strain condition, ACI 10.3.2)
f = 0.48 + 83 et = 0.652 (ACI 318-05, Fig. R9.3.2)
CHECK SHEAR CAPACITY (ACI 318-05 Sec. 11.1.1, 11.3.1, & 11.5.6.2)
f Vn = f (Vs + Vc) (ACI 318-05 Sec. 11.1.1)
> Vu [Satisfactory]
where f = 0.75 (ACI 318-05 Sec. 9.3.2.3) fy = 54.166667 ksi
d A0 Av Vc = 2 (fc') A0
0.5
Vs = MIN (d fy Av / s , 4Vc) f Vn
x 17.50 350 2.00 48.5 194.0 182