A&B and E is
required
1
Business Team will make available at least one SPOC on the Business Team's side. Ideally
the person should be Philips Employee and has extensive experience in legacy non-SAP
ActMan System.
2
Inputs from Business Team, as requested by project team members, will be available on
time
3 Sign Offs by Business Team will be on time
4 The SNOW Change Management is out of scope.
5
The SAP Data Upload Consultant FTE will guide the Business Team as to the How To
Process for collection of Data. The associated Philips employee will take this in their stride.
6
The effort and skill requirement for downloads from the legacy non-SAP ActMan System
are excluded
7
The Business Team will download data from the legacy non-SAP ActMan System. The
Business Team will process this data so as to make it uploadable to SAP
8
The project team members being new to leagacy non-SAP ActMan System are not in a
position to vouch for accuracy of downloaded data from legacy system
9
The effort and skill requird to establish methodlogy, sub-processes and way of working for
non-SAP Process Steps has been excluded.
10
The project team members can give a overall solution design for the above step. They have
the skill to give this solution in Standard MS Office Tools like MS Excel. For this it will be
additional effort and increase in timeline
11
In case certain other non-SAP technologies are to used then these are out of scope. Their
inclusion depends on outcome that will crystallize half way in the build stage. This will have
medium level impact on effort and time line. The decision to include in this project team
can only be taken at that stage
12
It is desirable, all project team members will be given a congruent office space close to
each other when in one city
13
When on business site, so as to promote best interaction, Project team members will be
given office space next to Business Team
14
At the beginning of the project, Display Access and small amount of training will be given
by Philips to project team members for legacy non-SAP ActManSystem
15
Business Team will download representative sample data from legacy non-SAP ActMan
system at the beginning of the project and handover to project team
16
SAP may require additional data in addition to legacy non-SAP ActMan system. This data
may be in paper form with the Business Team. The Business Team will organize to colllect
this data in electronic form. The templates for the same will be provided by project team.
17
Sizing of SAP Servers by way of SAPS and fine tuning of SAP servers has not been
considered
18
Sizing of SAP DMS Servers by way of SAPS and fine tuning of SAP DMS servers has not been
considered
19 Requirements of Networks have not been considered.
20
SAP Standard Reports are available.Customised SAP Reports are prohibited. Any
customization for download of SAP data for subsequent upload to non-SAP Report viewer
is excluded
21
Since initial scheduling of maintenance plans is best done individually per plan and
not by a mass function, the training for the initial scheduling of maintenance plans
will be given. The Initial scheduling of Maintenance Plans will be done by Business
Users
End of Assumptions
22 Effort and Skill set for installation of SAP front end on desktops are excluded
23 The Configuration and Specifications for desktops have not been considered
24 The travel and deployment time of personnel for going overseas is not considered. Time
required for management approval and government clearnances has not been considered
25
The project site will be Philips Office, 5th Floor+M2, MFAR Building, Manyata Tech Park,
Bengaluru, India
26
Effort and skill set required for installation of SAP Viewer on desktops are excluded
27
The effort and skill set for defintion and deployment of SAP Access rights for all types
business users, including BPOs are excluded
28
The SAPS of Servers for SAP Document Management System Module has not been
considered
29
Effort and Skill for Actual Transport of Requests from DEV to Quality to Validation to
Production has not been considered
30
Effort and skill required for System Integration Testing (SIT) by independent Test Engineer
is excluded
31
The real testing for functialities related to bar code can only take place on the real floor.
Since this is an offshore implementation project, effort for testing of functionalities related
to bar codes has not been considered
32 Purchase Requisitions and Purchase Orders are out of scope
End of Assumptions
as on 23-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
Added on 24-07-2019
SAP Professionals Required
Skill Type FTE
Project Manager Project Management 1
SAP ITBA for ActMan Functional 1
SAP FICO Functional 0.5
SAP PM Functional 1
SAP Ariba SME Functional 3 Days
SAP MM Functional 1
SAP HR Functional 0.5
SAP ABAP & SAP Workflow Technical 1
SAP PI & PO Technical 1
SAP Data Upload Engineer Functional 1
There is no go live criticality for interface and bar code custom development
d
Duration Responsibilty
Full Project Life Cyle
Full Project Life Cyle
Full Project Life Cyle
Full Project Life Cyle Dinesh
Beginning of Build Phase For Harmonization of Material Numbers, Views and its configuration in o
actions in SAP Ariba
Full Project Life Cyle
Full Project Life Cyle
Full Project Life Cyle ABAP Lead to Confirm
Full Project Life Cyle Sreekanth to Confirm
Full Project Life Cyle
Major Activities
Data Model Assumption: ActMan is a non-SAP system
Notation:
MS Excel Based
SAP Data Object's SAP LSMW or
Template for SAP ABAP BDC
collection of Data Tools for upload
6 Financial Asset Register and its subsequent Depreciation Assets will be depicted by Equipment
Number for Loan, Repair and Calibration
Subject Item 1 Item 2
Depreciation of Assets Out of Scope
Document Management System Out of Scope
Interpretation and
Mapping of
Downloaded Data
Data Upload
Hyper Care
Areas Subject
All Modules SAP Landscape
All Modules SAP Transport Requests