ENGINEERING SPECIFICATION

LOCAL FIRE FIGHTING SYSTEM

FOR FINAL

SHIP YARD : STX OFFSHORE & SHIPBUILDING CO.,LTD.

DESCRIPTION : LOCAL FIRE FIGHTING SYSTEM

PROJECT NAME : 49,700 DWT CLASS CRUDE / PRODUCT OIL


/ CHEMICAL TANKER
SHIP OWNER : OCEANGOLD TANKERS INCORPORATION

HULL NO. : S1680/1681/1682/1683/1691/1692

SHIP FLAG : LIBERIA

CLASSIFICATION : DNV-GL : S1680/1681/1691/1692


DNV-GL + KR : S1682/1683

DOC. NO. : XM-STX S1683

JOB. NO. : A72506/72507/81009/81010/82462/82463

HULL NO. S1680/81 DWG. NO. V6505000

TITLE LOCAL FIRE EXTINGUISHING SYSTEM IN E/R

2 May. 14, 2019 ISSUED FOR FINAL S.M.JEON D.H.LEE J.O.LEE


1 Mar. 14, 2018 ISSUED FOR WORKING K.S.KWAK S.R.KIM K.S.SHIN
0 Nov. 07, 2017 ISSUED FOR APROVAL S.H.BAEK D.H LEE I.D.NA
REV. DATE DESCRIPTION DWG CHK'D APP.

TANKTECH CO., LTD.


#51 Gupyeong-ro 16beon-gil, Saha-gu, Busan, 604-818, Korea
TEL: +82-51-979-1600, FAX: +82-51-979-1601
HOMEPAGE: www.tanktech.co.kr, E-MAIL : tanktech@tanktech.co.kr
LOCAL FIRE FIGHTING SYSTEM

PLAN HISTORY

REV. REV.
DATE DESCRIPTION REF. NO. MADE BY
NO. MARK.

0 2017.11.10 Submitted the approval drawing for shipyard E-MAIL TANKTECH

Yard comment
0-1 2018.01.08 - Modification of pump unit E-MAIL TANKTECH

Yard comment
0-2 2018.01.10 - Modification of pump unit E-MAIL TANKTECH

0-3 2018.01.15 Maker comment E-MAIL TANKTECH


- Modification of nozzle arrangement

0-4 2018.01.24 Maker comment E-MAIL TANKTECH


- Modification of alarm list

Owner comment E-MAIL TANKTECH


0-5 2018.02.06
Submitted the approval drawing for class(DNV-GL) S201802-007 TANKTECH

Maker comment E-MAIL TANKTECH


0-6 2018.02.12
- Delete of foam system signal

Submitted the working drawing for shipyard


Yard comment(Approval with comment)
1-7 2018.03.14 - modify elec. , modify section valve location E-MAIL TANKTECH
- Hydraulic calculation was changed reflecting
the yard's ISO drawing

Yard comment E-MAIL TANKTECH


1-8 2018.03.16
- Modification of LCP for I.G.G(cable size)

2-8 2019.01.03 Submitted the final drawing for shipyard S201901-005_ TANKTECH

2-9 2018.12.31 Yard comment E-MAIL TANKTECH


- Modification of Swing check valve direction

2-10 2019.01.21 Yard comment E-MAIL TANKTECH


- Modification of Comp. boiler nozzle added

2-11 2019.05.08 Yard comment E-MAIL TANKTECH


- Modification of No. 2&3 G/E nozzle moved

2-11 2019.05.14 Submitted the final drawing for shipyard ES201905012_ TANKTECH