Professional Documents
Culture Documents
PLATFORM AT EL +33.070 PLATFORM AT EL +32.800 (BOS) PLATFORM AT EL +38.175 &AG C-ZA 9100 FOUNDATION LOCATION PLAN
&AG N-ZE 1503 CARRYING OUR FOR CATALYST TUBES / FURNACE FLOOR
&AG N-ZE 1502 CATALYST TUBES PICK UP BAILS
1
N 1 1
L OF 100 % BURNERS
L OF 100 % BURNERS
&AG N-ZE 1505 PLATFORM ARRANGEMENT PART I
C
(TYP)
1000 1800 1000
SLEEVES
1. ALL DIMENSIONS ARE IN MILLIMETER AND ELEVATIONS ARE IN METER.
BURNERS
HEB200
IPE120
175 175
U200
HEB220
IPE120
U200
1450
1450
2. ALL ELEVATIONS ARE TOP OF STEEL UNLESS NOTED OTHERWISE.
U200
U200
U200 840
295
3. HPP = EL+100.000 REFERRED AS +16.000 ON DESIGN DRAWING.
415
700
U160
HEB220 HEM240 HEB220 HEM240 U160
E E HEB200 HEB340
U120
E
HEB200
HEB200
1390
ROW - lll
795
(TYP)
1
1110
(TYP)
1390
1390
L8
U240 U240 U240 U240
1390
0x8
20
1650
U200 U200 DETAIL-1
U1
0x8
630 450 630 450 630
(TYP) (TYP) (TYP) (TYP)
IPE120 IPE U240 IPE IPE U240 IPE IPE120 IPE U240 IPE IPE U240 IPE U200 U200
A IPE120 A
HEB200 U160
1080
(TYP) 160 U240 160 160 U240 160 (TYP) 160 160 160 160
HEB200
(TYP) (TYP) U240 (TYP) (TYP) U240 (TYP) IPE120
(11X270)
4025
(TYP) (TYP)
1245
4025
1245
1245
HEB200
HEB200
4025
x8
1245
(TYP)
2970
(TYP)
U200
U200
(TYP)
80
(TYP)
1080
0x
L8
1080
IPE120 IPE120
U200 U200
1390
1390
1390
L8
1390
1295
0x8
U200
20
755
U1
0x8
P)
HEB220 HEM240 HEB220 HEM240
(TY
D D
880
700
HEB220 HEB340
D LEGEND:
755
1250
1250
U200
1250
1295
630 450 630 450 630
HPP - HIGH POINT OF PAVING
1080
U200
IPE120 BOS - BOTTOM OF STEEL
(11X270)
3670
2970
3670
1170
1170
1245
TOS - TOP OF STEEL
HEB200
HEB200
HEB200
3670
1080
HEB200
U240
1080
IPE120
HEB200
1175
HEB200
U240
1250
1250
U240
U240
U240
U240
U240
U240
1295
U240
DETAIL-1
755
U240
U240
HEB200
HEB200
U240
HEB200 HEM240 HEB120 HEM240
C
U240
880
700
HEB340 ROW - IV
C
U160
U200
755
U240
1250
1250
1250
1295
630 450 630 450 630
1080
IPE120
(11X270)
HEB200
3670
2970
3670
1170
1170
1245
HEB200
HEB200
HEB200
3670
1080
L80x80x8
U160
(TYP)
1080
IPE120
1175
1250
1250
1295
755
HEB220 HEM240 HEB220 DETAIL-1
B B
880
700
HEB340 ROW - V
B
755
1390
1390
1390
1295
630 450 630 450 630
A A
1080
IPE120
(11X270)
2970
1080
4025
4025
1245
1245
1245
(TYP)
HEB200
HEB200
HEB200
HEB200
4025
1080
IPE120
IPE120
(TYP)
1390
1390
1650
150
1110
150
1390
795
705
HEB220 HEM240 HEB220 HEM240
A U200 A A U160
HEB340
U160
1000 400
U200
U200
1400
1400
U200
HEB220
IPE120
HEB200
HEB220
685 630 410 410 630 685 L8
IPE120
L8
IPE120
x8
U200
HEB220
0x 0x
80
IPE120
80 x 80
x8 80 x8
2300
HEB200 350 L
U200 U200
U200
1900 1900
U200
HEB160
HEB160
735
HEB160
U160
1000
900
U160
1000 1100
LADDER FROM EL. +33.070 HEB200 LADDER FROM EL. +27.770
250 TO EL. +33.070 1330 1140 1330
TO EL. +38.175 1595 610 579 1016 250 LADDER FROM EL. +33.070
TO EL. +38.175 1900 1900
1330 1140 1330 1150
1 1900 1900
1
6 5 4 1
6 5 4
6 5 4 DETAIL-1
1
+ 40.635
1
540
+ 38.920 1
1300
1
760
5 4 WELDED TO CASING
HYDROGEN MANUFACTURING UNIT
The reproduction, distribution and utilization of this document as well as the communication of its contents
to others without express authorization are prohibited.Offenders will be held liable for the payment of
damages. All rights reserved in the event of the grant of a patent,utility model or design.
Title: Scale
PLATFORM ARRANGEMENT PART II - REFORMER
HYDROGEN PLANT Issue 1