Professional Documents
Culture Documents
Checked by
Approved by
Foreman / : Rudolf Rambli : Yerry A
Service Head
Supervisor
PART NUMBER PART NAME QTY DESC,* GROUP GROUP NAME DID THIS INCIDENT DESCRIPTIVE COMMENTS (20
RESPONSIBLE CODE NUMBER MAKE THE PRODUCT SPACES MAXIMUM PER
CONTAINING INOPERABLE INCIDENT)
PART
55 Yes No
Yes No
Yes No
DESCRIPTION CODES * A – Structural C – Leaks E – System Malfunction G – General Repair K - Serviceability X – Operator
(Refer SIMS Guidelines : B – Surface D – Factory Assembly F – Factory Shipping H – Adjustment N - Abuse Complaint
SEBD0850)
Component Information322
Component Description : injector PCR Schedule Hrs : CompTarget hrs (ex 12000)
Comp Serial No / ID : Comp Hours : Current hrs failed (ex 8000)
Comp Arr / Gp No : Life Remaining : Remain of target life (4000)
Mach Hrs Install : Comp New Price :
Mach Hrs Removed : Cost To Repair : (ex $ 10000 )
Date Comp Installed : Cost/Hr Remaining : (10000 / 4000 = 2.5 $ /hr)
Date Comp Failed :
Supporting Documentation Required
# Description Y/N Comments
1 Installation Check List N
2 Repair & Maintenance History N
3 SOS History N
4 Magnetic Plug Inspections N
5 ET/VIMS Data Y
6 TPMS / Payload Data N
7 Performance Test Data Y
8 Others Y
9 Photo Y
Failure Outline:
ENGINE EXCESSIVE SMOKE AND HUNTING
Background / Research: Include all observations made during your Failure Analysis investigation including good and bad.
CUSTOMER AFTER REPLACE INJECTOR NO #5 AND #6