You are on page 1of 7

Installation guide for

4G Work-bench

All hardwares are already fitted in


the respective positions
Step-1
LH Side Cover & pipe Assembly

Table Top Assembly

Pedastal
Step- 2
LH side Cover & Pipe Assembly
should be fixed with Table top Assembly
with M6 bolts

First place pedastal


Under the table top
assembly
LH Side Pipe Frame
Step - 3
Assembly

Back Pipe Frame


RH Side Pipe Frame
Assembly

LH Bracket

3 Supporting pipes with


RH Bracket
LH/RH brackets
Step - 4
LH/RH side pipe frame assemblies
Should be fitted with back side
Frame with M6 bolts

LH/RH Brackets for


Table top support

3 Supporting pipes with LH/RH


Brackets should be fitted to
Side frame assemblies with M6 bolts
Step - 5
Top Panel Assembly

Table top Assembly

Pipe frame
assembly
Top Panel Assembly Should be
Step - 6
Fixed with LH/RH side pipe assemblies
With M6 bolts

Table top assembly should


Be fitted with pipe frame assemblies
With M6 bolts