Supervisor : Telephone :
Class III 1. Obtain infection control permit 6. Vacuum work with HEPA
before construction begins filtered vacuums
2. Isolate HVAC system in area 7. Wet mop with cleaner /
where work is being done to disinfectant
prevent contamination of the dust
system 8. Remove barriers materials
carefully to minimize
3. Complete all critical barriers or spreading of dirt and debris
implement control cube method associated with construction
before construction
9. Contain construction waste
4. Maintain negative air pressure before transport in tughly
within work site utilizing HEPA covered containers
equipped air filtration unit
5. Do not remove barriers from work
area until complete project is 10. Cover transport receptacles or
checked by Infection Prevention carts. Tape covering
and Control thoroughly cleaned
11. Upon completion, restore
by environmental services
HVAC system where work
was performed
Additional requirement :
TIM PENCEGAHAN DAN PENGENDALIAN INFEKSI
RUMAH SAKIT SUMBER SENTOSA
Jl. Raya Kebonsari 221 Tumpang-Malang
Telp. 0341-787233 Fax: (0341) 786756
Email: rsss@rocketmail.com
Date Initial :
Date : Date :