STANDARDIZED SPECIFICATION
for
C I V I L ENGINEERING CONSTRUCTION
C : SITE CLEARANCE
Telegrams : Comparator, P r e t o r i a
P u b l i s h e d and p r i n t e d i n the R e p u b l i c of South Africa by t h e
S o u t h A f r i c a n Bureau of S t a n d a r d s
ISBN 0-626-06215-2 Gr 5
This eStandard is exclusively for use on one standalone PC. To access it from a file server/Intranet constitutes a violation
of SABS copyright rules. Note that only one printout of the standard may be made.
This eStandard is exclusively for use on one standalone PC. To access it from a file server/Intranet constitutes a violation
of SABS copyright rules. Note that only one printout of the standard may be made.
CONTENTS
Page Number
1. ...................................... 5
SCOPE
2. ............................ 5
INTERPRETATIONS
2.1 .................. 5
Supporting S p e c i f i c a t i o n s
2.2 ................................ 5
Application
2.3 ................................ 5
Definitions
3. ..................................
MATERIALS 5
3.1 .......................
D i s p o s a l of Material 5
4. ...................................... 5
PLANT
5. ...............................
5.1
CONSTRUCTION
............ 55
Areas t o b e C l e a r e d and Grubbed
5.2 ........................... 5
C u t t i n g of Trees
5.2.1 P r o t e c t i o n of P e r s o n s . Animals. and
................................
Structures
............ 55
Branches overhanging B o u n d a r i e s
5.2.2
5.2.3 ...................... 65
P r e s e r v a t i o n of Trees
...................................
Clearing
5.3
5.4 ...................................
Grubbing
................... 66
R e c l e a r i n g of V e g e t a t i o n
5.5
5.6 .................... 6
C o n s e r v a t i o n of T o p s o i l
5.7 Landscape P r e s e r v a t i o n and C o n s e r v a t i o n of
.....................................
Flora 6
5.8 ................... 6
D e m o l i t i o n of S t r u c t u r e s
6. ................................. 6
TOLERANCES
7. ....................................
TESTING 6
8. .................... 6
MEASUREMENT AND PAYMENT
8.1 ........................... 6
Basic P r i n c i p l e s
8.2 ............................ 6
Scheduled I t e m s
STANDARDIZED SPECXFICAI'ION
for
C I V I L E N G I N E E R I N G CONSTKUCTLON
C : S I T E CLEARANCE
1. SCOPE
3
1.1 This s p e c i f i c a t i o n covers t h e removal of v e g e t a t i o n , boulders of s i z e up t o 0,15 m , and s u r f a c e
o b s t r u c t i o n s , and t h e demolition and removal of s t r u c t u r e s (including t h e i r basements, i f any) not
d i r e c t l y a s s o c i a t e d w i t h o r i n c i d e n t a l t o a n y excavation.
NOTE: The s t a n d a r d s r e f e r r e d t o i n t h e s p e c i f i c a t i o n a r e l i s t e d i n Appendix A.
2. INTERPRETATIONS
2.1 SUPPORTING SPECIFICATIONS. Where t h i s s p e c i f i c a t i o n i s required f o r a p r o j e c t , t h e following speciEi-
c a t i o n s s h a l l , i n t e r a l i a , form p a r t of t h e c o n t r a c t document:
a ) P r o j e c t s p e c i Eica t ion;
b ) SABS 1200 A o r SABS 1200 AA, a s a p p l i c a b l e ;
c ) SARS 1200 D o r SARS 1200 DA, a s a p p l i c a b l e .
T h i s s p e c i f i c a t i o n c o n t a i n s c l a u s e s t h a t are gerierally a p p l i c a b l e t o s i t e c l e a r a n c e .
2.2 APPLICATION.
l n t e r p r e t a t i o n s and v a r i a t i o n s o f t h i s s p e c i f i c a t i o n a r e s e t o l l t i n P o r t i o n 2 of t h e p r o j e c t
s p e c i f i c a t i o n which precedes t h i s s p e c i f i c a t i o n i n a c o n t r a c t iiment.
I
2.3 DEFINITIONS. For t h e purposes of t h i s s p e c i f i c a t i o n t h e d e f i n i t i o n s and a b b r e v i a t i o n s given i n the
a p p l i c a b l e of t h e s p e c i f i c a t i o n s l i s t e d i n 2 . l ( b ) and ( c ) and t h e following d e f i n i t i o n s s h a l l apply:
Cleared s u r f a c e . The n a t u r a l s u r f a c e of t h e ground a f t e r c l e a r i n g of s u r f a c e v e g e t a t i o n has been
completed.
Designated s i t e / a r e a . A s i t e o r an a r e a t h e p o s i t i o n of which i n r e l a t i o n t o t h e work t o be c a r r k d
out i s shown o n t h e drawing o r i s described i n t h e p r o j e c t s p e c i f i c a t i o n and i s t h e r e f o r e known t o t h e
C o n t r a c t o r a t the time of tendering.
Finished l e v e l . The l e v e l of t h e f i n i s h e d earthworks a s shown on t h e drawings o r s t a t e d i n t h e p r o j e c t
specification.
Grubbing. The o p e r a t i o n of digging out t h e r o o t s of v e g e t a t i o n .
O r i g i n a l ground l e v e l . The l e v e l of the s u r f a c e of an a r e a b e f o r e t h e commencement of c l e a r i n g .
3. MATERIALS
3.1 DISPOSAL. OF MATERIAL. M a t e r i a l obtained from c l e a r i n g and grubbing and from t h e demolition of
s t r u c t u r e s s h a l l be disposed of i n borrow p i t s o r o t h e r s u i t a b l e p l a c e s i n d i c a t e d by t h e Engineer and
s h a l l be covered with s o i l o r g r a v e l . Where no such place f o r t h e d i s p o s a l of m a t e r i a l i s i n d i c a t e d by
t h e Engineer, t h e C o n t r a c t o r s h a l l make h i s own arrangements f o r the p r o v i s i o n of a s u i t a b l e place.
The d i s p o s a l , o r burning i f s p e c i f i c a l l y p e r m i t t e d , of combustible m a t e r i a l on s i t e may be done only I
with t h e p r i o r w r i t t e n approval of the Engineer. Care s h a l l be taken t o observe t h e p r o v i s i o n s of t h e
Atmospheric P o l l u t i o n Prevention Act, 1965 (Act 4 5 of 1965), and any r e g u l a t i o n s published i n terms of
t h e Act.
A l l t r e e trunks and branches of g i r t h exceeding 0.5 m s h a l l he s t r i p p e d of secondary branches, sawn
i n t o t r a n s p o r t a b l e l e n g t h s and stacked a t designated s i t e s . Such timber s h a l l n o t be used by t h e
C o n t r a c t o r f o r a n y purpose, and s h a l l remain t h e property of the Employer.
Fencing wire s h a l l be n e a t l y wound i n t o r o l l s o r c o i l s and a l l such wire, t o g e t h e r with a l l f e n c e p o s t s
I
and o t h e r re-usable m a t e r l a l from s t r u c t u r e s , e t c . , s h a l l be stacked a t designated s i t e s .
4. PLANT
4.1 The C o n t r a c t o r s h a l l provide saws f o r c u t t i n g t r e e s and branches a s ordered, and p l a n t t h a t is s u i t a b l e
f o r grubbing r o o t s and f o r digging out and removing o t h e r o b s t r u c t i o n s on t h e S i t e .
5. CONSTRUCT I O N
5.1, AKFAS TO BE CLEARED AND GRUBBED. Both borrow a r e a s and t h e p o r t i o n s of t h e S i t e on which excavations
a r e t o be c a r r i e d out and embankments and s t r u c t u r e s c o n s t r u c t e d , s h a l l be c l e a r e d o r grubbed, o r both,
but t h e C o n t r a c t o r s h a l l not commence c l e a r i n g o r grubbing u n t i l t h e Engineer has d e s i g n a t e d , i n
w r i t i n g and i n d e t a i l , t h e exact a r e a s t o be c l e a r e d o r grtibbed and t h e t i m e a t which t h e work i s t o be
s t a r t e d . The Contractor s h a l l ensure t h a t t h e genera1 shape, p r o f i l e , and l e v e l s of t h e a r e a are not
m a t e r i a l l y a l t e r e d d u r i n g c l e a r i n g and grubbing o p e r a t i o n s . (See t h e requj rements f o r computation of
q u a n t i t i e s given i n Subclause 8.2 of SABS 1200 D o r SABS 1200 DA, as r e l e v a n t . )
I n o r d e r t o avoid r e c l e a r i n g o r t o c o n t r o l d u s t o r e r o s i o n t h e C o n t r a c t o r may have t o c l e a r and grub a t
t h e l a t e s t p r a c t i c a b l e s t a g e of c o n s t r u c t i o n .
6. TOLERANCES
6.1 Not a p p l i c a h l e t o t h i s s p e c i f i c a t i o n .
7. TESTING
7.1 Not a p p l i c a b l e t o t h i s s p e c i E i c a t i o n .
i SABS 1 2 0 0 C-1980
8.2.3
and a s s o c i a t e d m a t e r i a l .
Remove and grub a l l t r e c s and t r e e stumps r e g a r d l e s s o€ g i r t h ............................... Unit: ha
In exceptional circumstances, where c o n s t r u c t i o n i s c a r r i e d out through p l a n t a t i o n s o r where t h e
q u a n t i t y of t r e e s o€ g l r t h exceeding 1 m renders i n d i v i d u a l measurement impracticable. t h e p r o j e c t
s p e c i f i c a t i o n may provide t h a t the c l e a r h g and grubbing of t r e e s be measured in hectares. If this
method of measurement is used. t h e a r e a s t o which i t i s a p p l i c a b l e w i l l be defined c l e a r l y on t h e
drawings. and t h e reason For adopting t h e method of measurement w i l l be s t a t e d i n the p r o j e c t speci-
f ication.
The rate s h a l l cover t h e c o s t of a l l o p e r a t i o n s s p e c i f i e d In 8.2.2.
8.2.4 Reclear s u r f a c e s (only on i n s t r u c t t o n s from the Engineer) ............................ Unit: h a o r m OK km
The r e c l e a r i n g of a r e a s which have been previously c l e a r e d w i l l be measured t o the n e a r e s t 0.1 ha o r ,
in the case of p i p e l i n e s , etc. where t h e width is s p e c i f i e d , t o the n e a r e s t metre O K kilometre.
The rate s h a l l cover t h e c o s t of c l e a r i n g t h e s u r f a c e . grubbing i f necessary, b a c k f i l l i n g h o l e s , and
removing, t r a n s p o r t i n g , and disposing of m a t e r i a l a r i s i n g from t h e s e operations.
8.2.5 Take down e x i s t i n g fences ...................................................................
The rate s h a l l cover t h e c o s t of taking down t h e fences, c o i l i n g wire, s o r t i n g and s t a c k i n g a l l
Unit: km
The rate s h a l l COVeK t h e c o s t of uprooting and disposing of each hedge complete with r o o t s o r t h e
removing of each fence complete w i t h a l l wire. p o s t s , and o t h e r materials, a s a p p l i c a b l e .
8.2.7 ................
Dismantle and remove p i p e l i n e s , e l e c t r i c i t y transmisslon l i n e s , c a b l e s , etc.
Separate items w i l l be scheduled f o r each type and diameter ( o r group of diameters) of p i p e l i n e
Unit: m
ISBN 0-626-06215-2
rabr pta