SUPPLEMENTARY IOCL/M&I/MECH/E/S/04
SPECIFICATION FOR CARBON REVISION-00
STEEL VESSELS
Refineries Division DATED: 19/01/2012
SUPPLEMENTARY SPECIFICATION
FOR
Page 1 of 5
SPECIFICATION NO.
SUPPLEMENTARY IOCL/M&I/MECH/E/S/04
SPECIFICATION FOR CARBON REVISION-00
STEEL VESSELS
Refineries Division DATED: 19/01/2012
CONTENTS
1.0 SCOPE
2.0 DESIGN
3.0 ELECTRODES
4.0 FABRICATION
Page 2 of 5
SPECIFICATION NO.
SUPPLEMENTARY IOCL/M&I/MECH/E/S/04
SPECIFICATION FOR CARBON REVISION-00
STEEL VESSELS
Refineries Division DATED: 19/01/2012
1.0 SCOPE
2.0 DESIGN
2.1 Reinforcement for nozzle openings shall be integral type when required by the
applicable codes/standards or when the nominal thickness of vessel part
exceeds 50 mm. Self reinforcing type nozzles of size 75 mm NB (3" NB) and
above shall be 'set in' type.
3.0 ELECTRODES
3.2 All electrodes and fluxes shall be properly baked/dried as per manufacturer's
recommendation before use.
3.2.1 All bare electrodes and fluxes shall be selected as per ASME IIC .All weld metal
shall have equal or better mechanical properties than the parent metal.
Page 3 of 5
SPECIFICATION NO.
SUPPLEMENTARY IOCL/M&I/MECH/E/S/04
SPECIFICATION FOR CARBON REVISION-00
STEEL VESSELS
Refineries Division DATED: 19/01/2012
4.0 FABRICATION
4.1.1 Forming of shell plates and heads shall be carried out by machine, either hot or
cold, in such a way so as to preserve the specified material properties and to
produce a regular finish.
4.1.2 Magnetic particle/Dye penetrant examination shall be carried out on the outside
and inside surfaces including edges of torispherical or elliptical heads in knuckle
zone, after forming, for detection of cracks.
4.2.5 No welding shall be carried out when ambient temperature is less than
10°Celsius unless preheating is carried out.
4.3.1 Heat treatment of formed parts shall be carried out as per following:
d. When the completed vessel involves post weld heat treatment, heat
treatment recommended in (a) above shall not be applicable.
4.3.2 Vessels in caustic service, Amine or Sour gas service shall be stress relieved.
Page 4 of 5
SPECIFICATION NO.
SUPPLEMENTARY IOCL/M&I/MECH/E/S/04
SPECIFICATION FOR CARBON REVISION-00
STEEL VESSELS
Refineries Division DATED: 19/01/2012
c. The production test plate shall be from material of the same heat and
thickness as of shell/head. During and after welding, the test plates shall
be subjected to same heat treatment as and together with the course
they represent. Extra coupons shall be preserved to take care of
eventuality of retests.
4.5 For vessels required to meet stress corrosive conditions (such as caustic
service, H2S service, amine etc.), one Brinell hardness reading shall be taken
on the inside of each shell section, head, longitudinal weld, circumferential weld
and nozzle longitudinal weld after final post weld heat treatment. The value shall
be limited to the specified value as per requisition.
Page 5 of 5