MEMORANDUM. 2,
acy Direetor- AR & EP e 1) Director of Monitoring 2
ap. LM/HJCR/2888/06/2017 a Sunday, June 11,2017 La
SUBJECT: Comments on Work Notification, SCR Ref # 05/0106/SCR, for the door of police
deportation centre at Gate 3.
With reference to the above subject please be informed that we have ‘No Objection’ to proceed with
the works detailed in the work notification subject to compliance to our below comments:
- General Comments:
1. In case of any emergencies at work, immediately call JCR at +97145045000 or 050 4575009,
2. Contractor staff shall mandatorily undergo Safety Induction Program before commencing project,
work in Airport Premises of DI.
3. Obtain approval from alll relevant Departments/Authorit
's before the commencement of work,
4, PTW approval indicating the date and time of work shall be obtained from JCR before the
commencement of work.
5. Before start/finish of the work activity, contact the concerned Shift Duty Engineer for document
verification / Safety compliance of the work activity that to be performed. Contact details given
below as per location for reference.
Point of Contact | Duty Mobile Numb:
Serco - Duty Manager | 0543062233
Cargo and Ancillary Buildings Serco — Duty Manager | 0543002034
Concourse B, Terminal 3 Duty Engineer 050-1076678
Condourse A Duiy Engineer 050-2811067
Concourse C Duty Engineer 050-5889906
6. Local Area access permits shall be obtained from Shift Duty Engineer if the scope / location of
work require access to AL&SS (Airport Logistics and Special Systems), AU (Airport Utilities)
Facilities. For further information on LOCAL AREA ACCESS PERMIT, call THD#
0097145055099.
Cont'd Page 2 of 4
Dube Argon Tr arr 4goaaee sey tosteree eshte
POBox 2605, Ouba F ‘eri adzosaor sa orrerTais yo BSc
Unt rao eraatns : aibaareens 26 ubslakpers.9¢ “le saoadh at SU2616 =|
Reteenee7OBoleG/ICR] __WoikNaifesion | TS
romconmacroner ons \ ota aT]
1.0 Permit Request Details \
inal Operation
Department/Organisation ewe: _DARWISH ALUMINIUM AND GLA‘ &. pe
Project/Contract reference: _122320
Project Title. _Door of Police Deportation Centre 7
Project Scope: [“] New 7 Uparede /Update FX} Modification Tota! Makeover:
Project Exact Location: _Gate3
Projet losaton's xisngoii! onions are abouts known? LR] YES x0
Seng Das; 07160017 String Tine: _06-00 Eoding ss; _ 07/09/2017 Ending Tine _18:00
1.1 Permit Work Type(s)
[[] wens Continetetry [| caviework —[%) dismanting pres Goo
Cutting! grinding [%X | Work atbeight ‘Forklift operation Erection works, | Commissioning
Dry vaing Seating ane open [Ding Teping
[Ey seat ats wort [=] tiene Deccmprenion [| Dra Storage
‘batter works [7] Ren wens Soreonerme Tc Sores
Eran Titi dos, fie Bes Comarca
Other: i [
(Dia
' . oy Risk stent
smmcineas [y] Sheard /Conrae [x] Maio sem a)
Orbe
ce wok 01/06/2017 be 01/06/2017
Project Manager ‘Date "Project Safty Manager Signaure ‘Date
Contact Number: 0565045916 ‘Contact Number: 0565045908
Final Authorization (Police / DA Permit controller)
+ Please subnal Permit requce and ainchments via mall/ personaly to te otnt Contal Room Terminal 3 and Windy allow SSIS
| fvoridnadazs) for approvals procening andr fed back. Please ensure that you are fully aware of alte existing stan
‘conditions relevant to your project's scope prior to rending this request, n order to a
please ell: 04/50 45235 or Email: ptv.jer@idubalairport.e
1
|2.0 Permit Review & Authorisation
After reviewing the request, work deals, documentations and physically inspecting the ste / locaton; the following work
precautions are required,
2.1 Permit Precautions & Requirements
satay natch Ilaicropied [7] Pane steer Spi paegpmen [] Petco
Spenioeraptet [] PRE Tnngregied [| Towa ae Maega [| Fac
Sata cmevrenred [] Bratingmprane [| Fieeinganesndel [] Gnpeiror f=
Epson cus Lin per renuied [] Fit tc Stpeoae jal
Suicousvpind [| Vartiwrenta [| teeteccnrst” [| viieesea
Fakaomntreqind [—] htomrtropeed [] Wet cant Noms
Jemerenied Ueiegremred [7] Contatinrogied [) Mtengcoar
Ststeommsreqes [] East [| bene flares
ay wa WaningSipreqiees [] Spechlepitine —[) Seogconts
gn peed Espoo [| Senesenet Wade cal [] Sper arrens
Tak sr Nomuremtconats [| Tampng cor Beating [ Socremnes
Spilgecont ns Ose Lice Sintirs roses [] Taming [Comma sia
Otters: (ata)
After reviewing the permit and it attachments, AREF have no objection to authorise his permit subject fo;
NL a I fores/ For
Alter reviewing the permit and is attachments, DA Engineer have ao objection to authorie this permit subject 0;
After reviewing the permit and its attachments, OHSE Engineer have no objection to authorise this permit
After reviewing te pert andi atcha, Al veo eben tw aptorel peral aor
@ Ballow ORE SE Tiles venel tons. & Gelrate
wih clice ale cuales
IF-F-IE
DA Engineers Signature Date Tapa ire Fabtng Date
~QHSE Engineer's Signature Date